Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 6 dokumen yang sesuai dengan query
cover
"Cool gasification experiments have been successfully carried out using the moving-bed gasifier at the
temperature of reaction around 870°C which is comparatively low for coat' gasifiers. The endothermic
reaction of coal gasification is separated from the heat providing process with a certain amount of red-
hot ceramic particles, which are heated in the draft tube by burning part of the product gas with air then
circulated within the draft tube, the cyclone and the moving bed gasifier, so that can be obtained rich
hydrogen product gas with high calorific value. Product gas containing hydrogen as high as 60 % vol
and the calorific value of the product gas can reach I0 MJ/Nm! when air is used as oxidant. Maximum
cool gasification efficiency may reach 92%.
"
Jurnal Teknologi, Vol. 21 (4) Desember 2007 : 295-298, 2007
JUTE-21-4-Des2007-295
Artikel Jurnal  Universitas Indonesia Library
cover
Denok Wahyuningtyas
"Cakupan pelayanan air bersih PT. PALYJA untuk DKI Jakarta berkisar 60% pada tahun 2015, sedangkan target yang ditetapkan pada MDGs tahun 2015 cakupan pelayanan air bersih akses aman nasional adalah 68,87%. Permasalahan yang dihadapi saat ini adalah kurangnya pasokan air baku yang memenuhi syarat untuk diolah menjadi air bersih/ air minum dikarenakan kualitas air baku yang makin menurun akibat buangan limbah domestik maupun nondomestik. Untuk memperbaiki kualitas air baku maka dilakukan pengolahan secara biologis dengan optimalisasi parameter operasi. Tujuan penelitian ini adalah menganalisis kinetika dan efisiensi removal zat organik dan amonia pada pengolahan air baku IPA Cilandak yang bersumber dari Sungai Krukut menggunakan Moving Bed Biofilm Reactor terhadap variasi laju aerasi dan waktu tinggal hidrolik. Pada laju aerasi 40 L/menit efisiensi removal COD dengan waktu tinggal 20, 40, dan 60 menit berturut-turut adalah 47,23%, 49,35%, dan 52,04%, sedangkan amonia berturut-turut 47,83%, 50,63%, dan 54,01%. Untuk kinetika penguraian COD adalah 0,0369 jam-1 dan amonia 0,0578 jam-1. Sedangkan pada laju aerasi 30 L/menit efisiensi removal COD dengan waktu tinggal 20, 40, dan 60 menit berturut-turut adalah 43,80%, 45,20%, dan 46,99%, untuk amonia berturut-turut 43,26%, 46,23%, dan 48,96%. Kinetika penguraian COD pada laju aerasi tersebut adalah 0,0288 jam-1 dan amonia 0,0539 jam-1. Kondisi optimum pengolahan MBBR pada percobaan ini dicapai pada saat waktu tinggal 60 menit dan laju aerasi 30 L/menit.
......Coverage of water service to the Jakarta area ranges from 61.06% in 2015, while the target set in the MDGs by 2015 service coverage of national safety access clean water in Jakarta is 68,87%. The problems faced today was the lack of supply of raw water that is eligible to be processed into clean water/ drinking water, it?s because the quality of the raw water is decreasing due to domestic and non-domestic waste disposal. To improve the quality of raw water, biological processing is carried out by optimizing the operating parameters. The purpose of this study was to analyze the kinematics and the efficiency of organic matter and ammonia removal in the raw water treatment Cilandak Drinking Water Plant from Krukut River source using Moving Bed Biofilm Reactor to variations aeration rate and hydraulic retention time. At 40 L/minutes aeration rate, removal efficiency of COD with 20, 40, and 60 minutes retention time are 47,23%, 49,35%, dan 52,04%, while removal efficiency of ammonia are 47,83%, 50,63%, dan 54,01%. For the decomposition kinetics of COD and ammonia is 0,0369 hour-1 and 0,0564 hour-1. At 30 L/minutes aeration rate, removal efficiency of COD with 20, 40, and 60 minutes retention time are 43,80%, 45,20%, dan 46,99%, while removal efficiency of ammonia are 43,26%, 46,23%, dan 48,96%. Decomposition kinetics of COD and ammonia at this aeration rate is 0,0288 hour-1 and 0,0539 hour-1. The optimum conditions of MBBR treatment in this trial achieved when the retention time is 60 minutes and aeration rate is 30 L/min"
Depok: Fakultas Teknik Universitas Indonesia, 2016
T45929
UI - Tesis Membership  Universitas Indonesia Library
cover
Wednes Suci Pradafitri
"ABSTRAK
Pertumbuhan penduduk meningkatkan kebutuhan suplai air bersih. Masalah kondisi kualitas, kuantitas, dan kontinuitas air baku di DKI Jakarta membuat pasokan air menjadi langka. Masalah tersebut dapat diatasi dengan intervensi teknologi pengolahan sumber air sehingga pelayanan pasokan air bersih di provinsi DKI Jakarta meningkat. Banjir Kanal Timur BKT adalah salah satu fasilitas infrastruktur di Provinsi DKI Jakarta yang berpotensi menjadi sumber air baku. Penelitian ini bertujuan menganalisis pemilihan teknologi pra pengolahan yang tepat untuk memperbaiki kualitas air BKT. Metode Analytical Hierarchy Process digunakan untuk menentukan teknologi pra pengolahan yang tepat untuk memperbaiki kualitas air BKT berdasarkan persepsi 5 orang ahli dari instansi berbeda dengan 3 pilihan alternatif teknologi, yaitu MBBR Moving Bed Biofilm Reactor , MBR Membrane Bioreactor , dan Bank Filtration. Hasil penelitian ini menunjukkan bahwa teknologi MBBR memperoleh bobot tertinggi sebesar 0,51, sedangkan MBR sebesar 0,38, dan BF sebesar 0,12. Kesimpulannya adalah air BKT berpotensi menjadi air baku dengan teknologi MBBR sebagai teknologi yang paling tepat untuk pengolahan air Banjir Kanal Timur.

ABSTRACT
Population growth increases the need for clean water supplies. The problem of quality, quantity, and continuity of raw water in DKI Jakarta make water supply become scarce. This condition can be solved by the intervention of water source processing technology so that raw water supply service in DKI Jakarta province increases. East Flood Canal BKT is one of the infrastructure facilities in DKI Jakarta that has the potential to become a source of raw water. This study aims to analyze the selection of appropriate pre processing technology to improve the water quality of BKT. The Analytical Hierarchy Process method is used to determine the appropriate pre processing technology to improve the water quality of BKT based on perceptions of 5 experts from different agencies with 3 alternative technology options, namely MBBR Moving Bed Biofilm Reactor , MBR Membrane Bioreactor , and Bank Filtration. The results of this study indicate that MBBR technology obtained the highest weight of 0.51, while the MBR of 0.38, and BF of 0.12. The conclusion is that BKT water has the potential to become raw water with MBBR technology as the most appropriate technology for water treatment of East Flood Canal. "
2018
T51175
UI - Tesis Membership  Universitas Indonesia Library
cover
Rhefa Fauza Setiani
"ABSTRAK
Kualitas air permukaan di Kota Jakarta rata-rata sudah memasuki status tercemar berat. Dalam upaya mengurangi beban pengolahan IPAM, dibutuhkan proses pre-treatment untuk menyisihkan parameter seperti bahan organik, ammonia, warna, rasa, dan bau. Pengolahan ini umumnya menggunakan proses kimia dan fisik, seperti klorinasi dan karbon aktif yang menghasilkan produk sampingan yang berbahaya. MBBR merupakan salah satu solusi yang dikembangkan untuk mengurangi kadar nutrien dan organik pada air baku. Penelitian ini bertujuan untuk meningkatkan kualitas air baku, dengan menyisihkan parameter NH3-N, COD, Fosfat, TSS sebelum masuk ke pengolahan konvensional, dengan total kapasitas reaktor eksperimental sebesar 6 L. Kinerja reaktor dinilai berdasarkan efisiensi penyisihan parameter dengan variasi waktu tinggal 1 jam, 1,5 jam, 2 jam . Reaktor dioperasikan dengan menggunakan media Kaldness K1 dan suplai oksigen sebesar 7 L/menit. Waktu tinggal optimal yang dicapai adalah 1,5 jam dengan kemampuan penyisihan parameter NH3-N, COD, TP, TSS berturut-turut sebesar 54,3 0,28; 51,8 0,2; 52,6 0,19; dan 77,7 0,14. Berdasarkan dari waktu tinggal optimal tersebut, diketahui kinetika laju penyisihan ammonia pada MBBR berlangsung pada orde nol, dengan laju penyisihan sebesar 0,0056 g/m2.hari. Hasil penelitian menunjukkan bahwa semakin tinggi konsentrasi kontaminan organik yang diolah, maka semakin tinggi pula efisiensi MBBR. Selain dari peningkatan mutu badan air, proses pre-treatment dengan menggunakan MBBR dapat mengurangi penggunaan dosis koagulan 50 mg/L menjadi 9 mg/L, untuk menurunkan kekeruhan air baku dari 135 NTU hingga 7,69 NTU sebelum memasuki unit koagulasi-flokulasi.

ABSTRACT
The quality of surface water in Jakarta is on a serious polluted status. In order to reduce the IPAM processing load, a pre treatment process is needed to eliminate parameters such as organic matter, ammonia, color, tase, and odor. This treatment generally uses chemical and physical processes, such as chlorination and activated carbon that produce harmful byproducts. MBBR is one of the solutions developed to reduce the nutrient and organic levels in raw water. This study aims to improve the quality of raw water, by reducing the concentration of COD, NH3 N, Phosphate, and TSS before entering the conventional process, with total experimental reactor capacity of 6 L. Reactor performance is assessed based on parameter removal efficiency with variation of residence time 1 hour, 1,5 hours, 2 hours . The reactor is operated by using Kaldness K1 as the medium and oxygen supply of 7 L min. The optimum residence time is 1,5 hours with the ability to remove COD, NH3 N, Phosphate, TSS 51,8 0,2 54,3 0,28 52,6 0,19 and 77,7 0,14 respectively. Based on the optimum residence time, the kinetics of the ammonia removal rate in MBBR takes place at zero order, with a rate constant removal of 0,0056 g m2.day. The results showed that the higher concentration of ammonia, and organic contaminants treated, the higher the efficiency of MBBR. Apart from water quality improvement, pre treatment process using MBBR can reduce coagulant dose from 50 mg L to 9 mg L, to decrease raw water turbidity from 135 NTU to 7,69 NTU before entering the coagulation flocculation unit."
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
I Putu Putra Jaya Parwatha
"Gas karbon monoksida (CO) adalah hasil produksi dari pembakaran tidak sempurna senyawa-senyawa organik dan berbagai bentuk karbon yang paling banyak dihasilkan dibanding komponen lainya dalam asap. Simulasi proses adsorpsi digunakan untuk untuk mengetahui laju adsorpsi yang efektif, kemampuan adsorpsi dari tiap ukuran partikel, dan konsentrasi sisa pada ruang uji. Ruang uji yang digunakan berukuran 0,4 m x 0,4 m x 1,2 m.
Pada penelitian ini digunakan adsorben karbon aktif komesial yang memiliki nilai bilangan Iodin 1000 mg/g, luas permukaan (BET) 1050 m2/g, adsorpsi maksimum gas karbon monoksida (CO) (nmaks) 1,58827 mol/g, dan konstanta adsorpsi Langmuir untuk gas karbon monoksida (b) 0,00305. Massa adsorben yang digunakan adalah 3 gram. Ukuran partikel adsorben yang digunakan adalah 1,59.10-4 m, 7,95.10-5 m, 8.10-7 m, dan 4.10-7 m. Simulasi menggunakan aplikasi Comsol Multiphysics versi 4.3b.
Berdasarkan hasil simulasi, diperoleh unggun dengan ukuran partikel 8.10-7 m memiliki waktu jenuh yang paling lama dan konsentrasi sisa 35,4 mol. Konsentrasi sisa yang terbentuk setelah proses adsorpsi unggun dengan partikel berukuran 7,95.10-5 m, 8.10-7 m, dan 4.10-7 m nilainya berkisar antara 0,03545 mol - 0,0355 mol.
......Carbon monoxide (CO) is the highest composition in combustion smoke. Carbon monoxide (CO) is produced by incomplete combustion of organic compounds and various forms of carbon. Simulation of adsorption process used to determine the effective adsorption rate, adsorption capacity of each particle size, and the residual concentration in the test chamber. Test chamber size is 0,4 m x 0,4 m x 1,2 m.
In this research, properties of activated carbon which is used for adsorbent 1000 mg/g Iodine number, surface area (BET) 1050 m2/g, maximum adsorption capacity of carbon monoxide (CO) (nmaks) 1.58827 mol/g, and Langmuir adsorption constants for carbon monoxide (b) 0.00305. Mass of activated carbon adsorbent is 3 grams. Variations of particle size used for this research are 1,59.10-4 m, 7,95.10-5 m, 8.10-7 m, and 4.10-7 m. Comsol Multiphysics simulation program version 4.3b used for process simulation.
Based on the simulation results, bed with particle size 8.10-7 m has the longest saturated time and residual gas carbon monoxide (CO) is 35,4 mol. Residue of gas carbon monoxide (CO) composition in the chamber for particle size 7,95.10-5 m, 8.10-7 m, and 4.10-7 m approximately 0,03545 mol - 0,0355 mol."
Depok: Fakultas Teknik Universitas Indonesia, 2014
S54856
UI - Skripsi Membership  Universitas Indonesia Library
cover
Amrina Rosyada
"Proses produksi gula aren di rumah Industri CV Diva Maju Bersama menghasilkan air limbah dalam prosesnya. Air limbah industri ini memiliki konsentrasi COD yang tinggi yakni lebih dari 2000 mg/l sehingga melebihi baku mutu yang telah ditetapkan. Tujuan dari penelitian ini adalah menganalisa efektivitas system Moving-bed biofilm sequencing batch reactor dalam mengurangi konsentrasi COD pada air limbah industri gula aren sekaligus kesesuaiannya dengan baku mutu yang ada. Proses penelitian berlangsung secara eksperimental pada skala laboratorium dengan menggunakan 1 unit MBSBR dengan working volume 25 liter. Media yang digunakan sebagai tempat pertumbuhan bakteri adalah Kaldness K1 dengan rasio 60. Pada proses pembebanan digunakan variasi waktu detensi 12 sampai 24 jam.
Hasil percobaan menunjukan rentang efisiensi penyisihan COD pada waktu detensi 12, 18, dan 24 jam berturut-turut 84 ndash; 89 , 86 ndash; 91 , dan 88 ndash; 92 dengan konsentrasi DO optimum 2.41 ndash; 2.62 mg/l. Nilai beban organik pada rentang 3.27 ndash; 4.27 kg COD/m3.hari menghasilkan efisiensi penyisihan COD diatas 88 . Peningkatan nilai beban organik mengakibatkan penurunan efisiensi penyisihan COD. Berdasarkan uji statistik independent t-Test dan analisa terhadap baku mutu, waktu detensi 24 jam dipilih sebagai waktu detensi optimum yang akan digunakan untuk kebutuhan perancangan.

The production of palm sugar in CV Diva Maju Bersama home industry produces waste water in the process. This industrial waste water has a high concentration of COD that is more than 2000 mg l which exceeds the quality standard. The purpose of this research is to analyze the effectiveness of Moving bed biofilm sequencing batch reactor system in reducing the concentration of COD in its suitability with the quality standard. The research process was conducted experimentally on a laboratory scale. MBSBR unit with working volume 25 liters is being used during the experimental. The medium used as a place for bacterial growth is Kaldness K1 with a ratio of 60. The detention time were varied from 12 to 24 hours during the feeding time.
The results show the efficiency removal of COD at 12, 18, and 24 hours detention time respectively is 84 ndash 89 , 86 ndash 91 , and 88 ndash 92 with optimum DO concentration 2.41 2.62 mg L. The optimum organic loading rate to reach COD removal efficiency above 88 is in the range of 3.27 4.27 kg COD m3.day. The increasing of organic loading rate will result in decreased efficiency removal of COD. Based on statistical independent t Test method and also consideration of the quality standard, 24 hour detention time is chosen as the most optimum detention time that will be used for the designing requirement.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
S68049
UI - Skripsi Membership  Universitas Indonesia Library