Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 4 dokumen yang sesuai dengan query
cover
Febri Indriyani Fasry
Abstrak :
Perjanjian Build, Operate and Transfer sering ditemukan dalam praktek pembangunan proyek berskala besar. Perjanjian BOT antara PT. Bank Rakyat Indonesia dan Dana Pensiun BRI dengan PT. Mulia Persada Pacific terjadi selama 30 tahun. Dikarenakan terbukti wanprestasi hakim memutuskan perjanjian berakhir padahal hak pengelolan Investor masih sampai 10 tahun lagi. Berdasarkan hal-hal tersebut maka permasalahan yang akan diteliti dalam skripsi ini adalah perlindungan hukum terhadap PT. Mulia Persada Pacific selaku Investor yang terbukti wanprestasi terhadap putusan hakim yang menyatakan perjanjian berakhir (pembatalan perjanjian) dan restorasi (pengembalian prestasi) tehadap PT. Mulia Persada Pacific selaku pihak yang terbukti wanprestasi.
Build Operate And Transfer (BOT) Agreement mostly found in some major development project. Build, Operate And Transfer (BOT) Agreement between PT. Bank Rakyat Indonesia and Dana Pensiun BRI with PT. Mulia Persada Pasific has been occured for thirty years. It because has been proven there is a default, The Judge had annuled that the agreement ended even though the invest management is still running for the next ten years. Based from the things above, this thesis will discuss the issues about the legal protection of PT. Mulia Persada Pasific as the investor who already been proven default of The Judge Annualment which stated about the end of agreement (agreement cancelation) and the restoration (returning pledge) of PT. Mulia Persada Pasific as the party who has been prove defaulted.
2016
S62477
UI - Skripsi Membership  Universitas Indonesia Library
cover
Nefaliana Rahma
Abstrak :
Skripsi ini membahas tentang pemutusan perjanjian Build, Operate and Transfer yang dalam praktiknya dalam kasus Putusan No. 600 K/PDT/2018 dimungkinkan adanya penyampingan terhadap Pasal 1266 KUHPerdata mengenai tidak diperlukannya putusan pengadilan dalam pemutusan perjanjian. Dalam penelitian ini adanya penyampingan pasal yang diperbolehkan dalam Putusan Tingkat Pengadilan Negeri dengan alasan para pihak sepakat bahwa apabila terjadi perbuatan lalai dalam melakukan pemenuhan prestasi oleh pihak kedua dalam masa pembangunan fisik bangunan setelah lewatnya waktu dalam perjanjian maka pihak kedua dinyatakan wanprestasi, dan oleh karena alasan tersebut serta kesepakatan dalam perjanjian dilakukannya penyampingan Pasal 1266 KUHPerdata pihak pertama berhak memutus perjanjian ini secara sepihak, para pihak juga setuju bahwa pemutusan tersebut tidak memerlukan putusan pengadilan. Dalam hal ini, hakim Pengadilan Negeri menyatakan bahwa Penggugat terbukti melakukan wanprestasi. Dengan demikian, pemutusan perjanjian secara sepihak yang dilakukan oleh pihak pertama disahkan. Namun pada tingkat Pengadilan Tingkat Tinggi adanya perbedaan pendapat bahwa penyampingan pasal 1266 KUHPerdata tersebut tidak dapat dilakukan dan pemutusan perjanjian secara sepihak tidak dapat dilakukan. Penelitian ini dilakukan dengan studi dokumen putusan dan bahan kepustakaan dan digunakan deskriptif analisis. Hasil penelitian ini menunjukkan bahwa penyampingan Pasal 1266 KUHPerdata dapat dilakukan apabila kedua belah pihak sepakat adanya penyampingan dengan tidak diperlukannya putusan pengadilan asalkan wanprestasinya terpenuhi. Bagi para hakim mungkin dapat mempertimbangkan lebih dalam mengenai adanya perbuatan wanprestasi atau tidak......This thesis will discuss the termination of agreement in Build, Operate and Transfer agreement model which is practiced in the case of Decision No. 600 K / PDT / 2018 where it is possible to waive Article 1266 of the Civil Code regarding the absence of court decisions in terminating the agreement. This research shows an article that is allowed in the District Court Decision, on the grounds that the party involved agrees that in an event of negligence in fulfilling performance of an agreement by the second party in a physical construction period of a building after the lapse of time in the agreement then the second party is deemed default, and for that reason as well as the agreement in the agreement on the attachment of Article 1266 of the Civil Code, the first party has the right to terminate this agreement unilaterally, parties also agrees that the termination/severance does not require a court decision. In this case, the District Court judge stated that the Plaintiff was proven to have default, therefore, the unilateral termination of the agreement made by the first party is approved. However, High Court does not agree, deeming that putting aside Article 1266 of the Civil Code and the unilateral termination of the agreement cannot be carried out. This research was conducted with the study of decision documents and library materials and use descriptive analysis. The results of this thesis indicate that the waiver of Article 1266 of the Civil Code can be done if both parties agree to the waiver with the need for a court verdict as long as the default is fulfilled. Judges may consider more deeply whether there is a default or not.
Depok: Fakultas Hukum Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Elisabeth Oktavia
Abstrak :
Perjanjian Build Operate Transfer mengandung unsur sewa dan pengalihan hak atas tanah dan/atau bangunan. Penelitian ini bertujuan membahas tentang perlakuan pajak penghasilan atas perjanjian BOT ditinjau dari asas certainty serta permasalahan yang timbul akibat perlakuan pajak tersebut. Penelitian ini menggunakan pendekatan kuantitatif post-positivisme. Data diperoleh melalui wawancara mendalam dan studi literature. Hasil penelitian ini menunjukkan perlakuan pajak atas perjanjian BOT merupakan pengalihan tetapi ketentuan tersebut belum seluruhnya memenuhi asas certainty, yaitu materi, penyempitan/perluasan, ruang lingkup, penggunaan bahasa hukum dan istilah baku. Selain itu, masalah utama yang timbul adalah ketidakpastian perlakuan pajak dalam tahun berjalan perjanjian BOT. ......This research addresses the treatment of income tax on build operate transfer agreement based on certainty principle and the problems as the effect of this tax treatments. This research used quantitative post-positivisme approach. The data was collected by interviews and study of literature. The results of this research is the tax treatment of BOT agreements refer to land and building acquisition, but these provisions are not entirely meet the principle of certainty, that are material, narrowing/expansion, the scope, the use of legal language and standard term. Then, the main problem is uncertainty in the tax treatment during the current year of BOT agreement.
Depok: Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2016
S61853
UI - Skripsi Membership  Universitas Indonesia Library
cover
Elisabeth Oktavia
Abstrak :
Perjanjian Build Operate Transfer mengandung unsur sewa dan pengalihan hak atas tanah dan/atau bangunan. Penelitian ini bertujuan membahas tentang perlakuan pajak penghasilan atas perjanjian BOT ditinjau dari asas certainty serta permasalahan yang timbul akibat perlakuan pajak tersebut. Penelitian ini menggunakan pendekatan kuantitatif post-positivisme. Data diperoleh melalui wawancara mendalam dan studi literature. Hasil penelitian ini menunjukkan perlakuan pajak atas perjanjian BOT merupakan pengalihan tetapi ketentuan tersebut belum seluruhnya memenuhi asas certainty, yaitu materi, penyempitan/perluasan, ruang lingkup, penggunaan bahasa hukum dan istilah baku. Selain itu, masalah utama yang timbul adalah ketidakpastian perlakuan pajak dalam tahun berjalan perjanjian BOT. ......Build Operate Transfer agreements contain a lease, land and building acquisition. This research addresses the treatment of income tax on build operate transfer agreement based on certainty principle and the problems as the effect of this tax treatments. This research used quantitative post-positivisme approach. The data was collected by interviews and study of literature. The results of this research is the tax treatment of BOT agreements refer to land and building acquisition, but these provisions are not entirely meet the principle of certainty, that are material, narrowing/expansion, the scope, the use of legal language and standard term. Then, the main problem is uncertainty in the tax treatment during the current year of BOT agreement.
Depok: Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2016
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library