Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 3 dokumen yang sesuai dengan query
cover
Anisha Anggraini
"Stadion merupakan salah satu bangunan gedung negara dengan klasifikasi khusus yang dalam pelaksanaannya memerlukan penyelesaian atau teknologi khusus. Pekerjaan yang kompleks pada proyek stadion menjadi salah satu alasan pemilihan kontrak rancang bangun di Indonesia. Perbedaan pemahaman pengukuran volume pekerjaan antar pihak proyek sering terjadi saat penggunaan kontrak rancang bangun, ini dikarenakan tidak adanya standar yang disepakati sehingga terjadi perselisihan. Tujuan penelitian ini meliputi penyusunan WBS pekerjaan mekanikal dan miscellaneous work pada field of play stadion, penyusunan pengembangan SMM berbasis WBS dan model hubungan antara WBS dan SMM terhadap akurasi perhitungan volume pekerjaan. Metode delphi dilakukan pada proses penyusunan WBS dan SMM berbasis WBS untuk mensurvei dan mengumpulan pendapat dari para ahli setelah dilakukan validasi pakar. Selain itu, penelitian ini menggunakan metode SEM untuk mendapatkan model hubungan antara standar metode pengukuran volume pekerjaan berbasis WBS terhadap tingkat akurasi perhitungan volume pekerjaan. Penelitian ini menghasilkan standar measurement method (SMM) yang berbasis WBS serta menghasilkan model matematis untuk hubungan antar variabel yaitu Y = 0.658 X1 + 0.245 X2 yang bermakna bahwa tingkat akurasi perhitungan volume pekerjaan mekanikal dan miscellaneous work pada field of play stadion dipengaruhi oleh WBS sebesar 0.658 dan SMM sebesar 0.245 dengan pengaruh signifikan ditandai dengan tanda positif.
......The stadium is one of the state buildings with a special classification which in its implementation requires a special solution or technology. The complex work on the stadium project is one of the reasons for choosing a design contract in Indonesia. Differences in the understanding of the measurement of work volume between project parties often occur when using a design and build contract, this is because there is no agreed standard so that there is a dispute. The objectives of this study include the preparation of WBS for mechanical work and miscellaneous work on the field of play stadium, preparation of the WBS-based SMM development, and model of the relationship between WBS and QMS on the accuracy of calculating the volume of work. The Delphi method is carried out in the WBS-based WBS and QMS preparation process to survey and collect opinions from experts after expert validation has been carried out. In addition, this study uses the SEM method to obtain a model of the relationship between the standard WBS-based work volume measurement method and the level of accuracy of the work volume calculation. This study produces a standard measurement method (SMM) based on WBS and produces a mathematical model for the relationship between variables, namely Y = 0.658 X1 + 0.245 X2, which means that the level of accuracy in calculating the volume of mechanical work and miscellaneous work in the field of play stadium is influenced by WBS of 0.658. and SMM of 0.245 with a significant effect marked with a positive sign."
Jakarta: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Andias Mintoharjo
"Salah satu klasifikasi Bangunan Gedung Negara berupa gedung khusus yang menjadi perhatian dalam pembangunannya saat ini yaitu Stadion. Penyelenggaraan pembangunan Stadion di Indonesia baik berupa bangunan baru ataupun renovasi beberapa diantaranya telah menggunakan kontrak terintegrasi rancang bangun karena dinilai lebih baik dari aspek biaya dan waktu. Namun dalam pelaksanaan pembanguan Stadion tersebut masih banyak dihadapkan dengan permasalahan berupa keterlambatan jadwal, variasi pekerjaan tambah kurang yang tidak sesuai dengan rencana awal, kelebihan biaya, klaim, dan hingga terjadinya sengketa diantara pengguna jasa, penyedia jasa, maupun pihak auditor. Masalah ini terjadi karena banyak risiko-risiko terkait biaya dan waktu yang tidak teridentifikasi sejak awal tahap perencanaan. Oleh karena itu, tujuan dari penelitian ini adalah mengembangkan standard Work Breakdown Structure (WBS) berbasis risiko pada bangunan utama gedung Stadion dengan kontrak terintegrasi rancang bangun untuk perencanaan biaya dan waktu. Dalam pelaksanaan penelitian ini akan dilakukan identifikasi risiko-risiko yang mempengaruhi perencanaan biaya dan waktu pada suatu pekerjaan konstruksi khususnya bangunan utama gedung Stadion melalui analisis arsip dari berbagai referensi, wawancara, dan validasi pakar yang digunakan untuk pengembangan WBS Stadion. Analisis risiko akan dilakukan secara kualitatif. Hasil penelitian ini menunjukkan bahwa standar WBS bangunan utama gedung stadion dengan kontrak terintegrasi rancang bangun terdiri atas 6 level dan memiliki 14 risiko tertinggi terhadap perencanaan biaya dan waktu. Tindakan preventif dan korektif digunakan untuk meminimalkan dampak risiko tertinggi sebagai dasar pengembangan standar WBS.
......One of the classifications of state buildings which is classified as a special building and that its concern in current construction called as Stadium. Nowadays, the implementation of stadium construction in Indonesia, either its new buildings or renovations, some of stadium use an integrated design-build project delivery system because it is considered better in terms of cost and time. However, the implementation of the Stadium project construction still faced with many problems such as schedule delays, variations of work that are not in line with the planning, cost overrun, claims, and disputes between owner, contractor, as well as the auditor. This problem occurs because there are still many risks related to cost and time that have not been identified since the planning phase. Therefore, the aim of this study is to develop a risk-based Work Breakdown Structure (WBS) standard in an integrated design and build on stadium main building for cost and time planning. In the implementation of this research, the identification of risks that affect the planning of costs and time in a construction project, especially the stadium main building, will be identified through an archive analysis of various related references that will be used for the development of the WBS Stadium. The risk analysis will be carried out qualitatively. The results of this study indicate that the standard WBS of stadium main building with integrated design-build contract consists of 6 levels and has 14 highest risks to cost and time planning. The preventive and corrective actions are used to minimize the highest risk impact as the basis for standard WBS development."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Andias Mintoharjo
"Salah satu klasifikasi Bangunan Gedung Negara berupa gedung khusus yang menjadi perhatian dalam pembangunannya saat ini yaitu Stadion. Penyelenggaraan pembangunan Stadion di Indonesia baik berupa bangunan baru ataupun renovasi beberapa diantaranya telah menggunakan kontrak terintegrasi rancang bangun karena dinilai lebih baik dari aspek biaya dan waktu. Namun dalam pelaksanaan pembanguan Stadion tersebut masih banyak dihadapkan dengan permasalahan berupa keterlambatan jadwal, variasi pekerjaan tambah kurang yang tidak sesuai dengan rencana awal, kelebihan biaya, klaim, dan hingga terjadinya sengketa diantara pengguna jasa, penyedia jasa, maupun pihak auditor. Masalah ini terjadi karena banyak risiko-risiko terkait biaya dan waktu yang tidak teridentifikasi sejak awal tahap perencanaan. Oleh karena itu, tujuan dari penelitian ini adalah mengembangkan standard Work Breakdown Structure (WBS) berbasis risiko pada bangunan utama gedung Stadion dengan kontrak terintegrasi rancang bangun untuk perencanaan biaya dan waktu. Dalam pelaksanaan penelitian ini akan dilakukan identifikasi risiko-risiko yang mempengaruhi perencanaan biaya dan waktu pada suatu pekerjaan konstruksi khususnya bangunan utama gedung Stadion melalui analisis arsip dari berbagai referensi, wawancara, dan validasi pakar yang digunakan untuk pengembangan WBS Stadion. Analisis risiko akan dilakukan secara kualitatif. Hasil penelitian ini menunjukkan bahwa standar WBS bangunan utama gedung stadion dengan kontrak terintegrasi rancang bangun terdiri atas 6 level dan memiliki 14 risiko tertinggi terhadap perencanaan biaya dan waktu. Tindakan preventif dan korektif digunakan untuk meminimalkan dampak risiko tertinggi sebagai dasar pengembangan standar WBS.
......One of the classifications of state buildings which is classified as a special building and that its concern in current construction called as Stadium. Nowadays, the implementation of stadium construction in Indonesia, either its new buildings or renovations, some of stadium use an integrated design-build project delivery system because it is considered better in terms of cost and time. However,  the implementation of the Stadium project construction still faced with many problems such as schedule delays, variations of work that are not in line with the planning, cost overrun, claims, and disputes between owner, contractor, as well as the auditor. This problem occurs because there are still many risks related to cost and time that have not been identified since the planning phase. Therefore, the aim of this study is to develop a risk-based Work Breakdown Structure (WBS) standard in an integrated design and build on stadium main building for cost and time planning.  In the implementation of this research, the identification of risks that affect the planning of costs and time in a construction project, especially the stadium main building, will be identified through an archive analysis of various related references that will be used for the development of the WBS Stadium. The risk analysis will be carried out qualitatively. The results of this study indicate that the standard WBS of stadium main building with integrated design-build contract consists of 6 levels and has 14 highest risks to cost and time planning. The preventive and corrective actions are used to minimize the highest risk impact as the basis for standard WBS development.

 

"
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library