Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 10 dokumen yang sesuai dengan query
cover
Baiynd, Anne-Marie
"Contents :
An introduction to the markets -- Technical indicators I: market positioning system, momentum, and candlesticks -- Technical indicators II: moving averages, bollinger bands, and volume -- Trading well is not only about trading systems -- Trading blind and risk -- Waves and fibs -- Success and habit -- Simple to complex : long -- Your trading journal -- Simple to complex : short -- Discipline, dedication, and endirance -- The ideal trade setup -- Common formations -- Skill set recap -- Self preservation and support structures."
New York: McGraw-Hill, 2011
332.63 BAI t
Buku Teks  Universitas Indonesia Library
cover
Saragih, Irmawardani
"ABSTRAK
Menentukan keputusan yang tepat dalam trading saham bukanlah hal yang mudah untuk dilakukan dikarenakan pergerakan harga saham yang sangat dinamis, apabila salah langkah maka yang didapat adalah kerugian. Untuk menentukan tindakan yang tepat dalam trading saham, investor dapatmenganalisis saham yang akan diinvestasikan terlebih dahulu agar mendapatkan keuntungan yang besar. Analisis yang dapat dilakukan adalah teknikal analisis saham dengan menggunakan berbagai indikator yang ada. Pada skripsi ini, akan dibahas penggabungan enam indikator analisisteknikal saham, yaitu Simple Moving Average, Moving Average Convergence/Divergence (MACD), Relative Strength Index (RSI), Stochastic Oscillator (SO) yaitu %D dan %K, dan William %Rdengan menggunakan metode Computational efficient functional link artificial
neural network (CEFLANN). Melalui metode ini, akan didapatkan rekomendasi berupa keputusan untuk jual, tahan, atau beli dan ketepatan akurasi rekomendasi yang diperoleh untuk jangka waktu satu minggu adalah 73,3%.

ABSTRACT
Deciding the right strategy in stocks trading is not an easy thing to be done because the stock prices movement, a little mistake can lead a huge loss. To determine the appropriate decision, investors can analyze the behaviour of targeted stocks first for gaining high profit . One of the method of analysis which can be performed is the technical stock analysis using various existing indicators. This undergraduate thesis will discuss about the combination of six indicators in technical analysis by using Computational efficient functional link artificial neural network (CEFLANN). The six technical indicators is Simple Moving Average, Moving Average Convergence/Divergence (MACD), Relative Strength Index (RSI), Stochastic Oscillator (SO) yaitu %D dan %K, dan William %R. By using
this method, investors will find the recommended decision on stocks trading, such as sell, hold, or buy and the accurate of the decision in one week is 73,3%."
2016
S69332
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hasannudin A.H.
"ABSTRAK
Dalam memasuki era globalisasi dimana persaingan antar rumah sakit semakin ketat, maka pembiayaan rumah sakit menjadi penting, yang mana berkaitan dengan tarif rumah sakit. Hal ini juga penting bagi rumah sakit swadana yang akan mengalami pengurangan subsidi anggaran dan menuju kearah rumah sakit mandiri.
Demikian juga dengan adanya tuntutan kebutuhan masyarakat terhadap pelayanan alat canggih menyebabkan biaya operasional pemeliharaan rumah sakit khususnya listrik semakin meningkat. Salah satu peralatan yang cukup banyak menyerap penggunaan daya listrik tersebut adalah Air Conditioner (AC).
Termasuk AC sentral yang berkapasitas besar. Untuk dapat menekan pembiayaan listrik tersebut diperlukan efisiensi dalam menjalankan peralatan tersebut.
Sehubungan dengan itu maka penelitian ini bertujuan untuk menganalisa efisiensi penggunaan AC sentral di RSUD Koja dan upaya penghematan biaya listriknya.
Telah dilakukan penelitian pada bagian Seksi Keuangan, Instalasi Bedah Sentral dan Instalasi Pemeliharaan Sarana Rumah Sakit ( IPSRS) RSUD Koja.
Responden dari penelitian ini adalah Kepala Seksi Keuangan, Kepala Instalasi Bedah Sentral dan Staf IPSRS bagian AC.
Pengumpulan data dengan tehnik wawancara dan telaah dokumen. Analisa data primer dilakukan secara kualitatif dan analisa data sekunder secara kuantitatif.
Dari hasil penelitian diperoleh kesimpulan bahwa penggunaan AC sentral di RSUD Koja belum efisien yang disebabkan beberapa faktor yang berhubungan dengan biaya tetap listrik yaitu penempatan karakteristik AC sentral yang kurang sesuai dengan fungsi ruang dan bagian bedah darurat dan pemanfaatan untuk Instalasi Bedah Sentral dan Bedah Darurat yang mempunyai waktu kerja yang berbeda sehingga menyebabkan AC sentral harus berfungsi selama 24 jam. Selain itu masih ada ruang bedah Instalasi Bedah Sentral yang belum termanfaatkan secara optimal, serta pemeliharaan AC sentral yang belum optimal, sedangkan faktor yang berhubungan dengan biaya tidak tetap listrik adalah prosedur penjadwalan operasi dan penerapan standar waktu operasi yang perlu ditingkatkan lagi.
Inefisiensi penggunaan AC sentral ini juga tampak dengan adanya perkiraan penghematan biaya listrik yang bisa didapat dengan melakukan perubahan penempatan AC sentral.
Agar penggunaan AC sentral lebih efisien dan dapat dilakukan penghematan biaya listriknya, maka sebaiknya dilakukan perubahan penempatan AC sentral untuk Instalasi Bedah Sentral yang waktu kerjanya tertentu dan AC Split Duct yang berasal dari Instalasi Bedah Sentral untuk bagian bedah darurat. IPSRS melakukan pemeliharaan AC sentral yang baik dengan mematikan Chiller AC sentral dan kompresor AC Split Duct diluar waktu penggunaan melalui pengaturan dengan menggunakan peralatan BAS serta melakukan pemantauan kebocoran ducting dengan pemasangan manometer. Pemadatan jadwal dan evaluasi standar waktu operasi perlu dilakukan untuk dapat mengurangi penggunaan daya listrik dan biayariya. Sistem informasi biaya perlu ditingkatkan dengan perbaikan manajemen keuangan khususnya akuntansi melalui pelatihan tenaga keuangan yang ada serta untuk pendelegasian wewenang dan tanggung jawab untuk mengkoordinasi dan melaksanakan upaya tersebut perlu dibentuk Komite Efisiensi dan Penghematan Biaya.

ABSTRACT
Technical Analysis on the Efficiency of the Use of Electricity for Central Air Conditioning at RSUD (Hospital) KojaEntering the global era where rivalry among hospitals is getting tight, the hospital costs is important connected with the hospital tariff. This matter is important for self funding hospitals which will get decreased subsidy in funds is to be independent.
The social demands for the services of sophisticated equipments cause the increase in hospital operational costs especially for electricity. One of the equipments using high electrical power is the AC, including the central AC of high capacity. In order to cut down the electrical costs it is necessary to be efficient in operating the equipment.
In connection with the above, this research is to analyze the efficiency of the use of the central AC at the RSUD Koja and in an effort of cutting the electrical costs.
A research has been carried on at the Financial section, the Central Surgey Installation and the Installation of Hospital Maintenance of RSUD Koja.
The respondents of the research are the Head of the Financial Installation, the Head of the Central Surgery and the Staff of the Installation of the Hopital Maintenance AC section.
The method used to compile data is by technical interview and by documentary examination. The analysis on primary data is carried out qualitatively and the secondary data is carried out quantitatively.
It is concluded that the use of central AC at RSUD Koja is not efficient which is caused by several factors connected with the regular costs for electricity i.e. the characteristic placement of the central AC unsuitable for the room and the emergency surgery and the use for the Installation of Central Surgery and Emergency Surgery which have different working hours so that the central AC must be in function for 24 hours. Besides, there is a surgery of the Installation of Central Surgery which is not used optimally, for the AC upkeep central haven't been optimal, whereas the factor connected with the regular electrical costs is the procedure of the schedule for surgery and the implementation of the operational standard time has to be enhanced.
The inefficiency of the use of the central AC is visible by an estimate of economical costs by the alteration of the placement of the central AC.
In order that the use of the central AC is more efficient and a reduce in the electrical costs, it is suggested to alter the placement of the central for the Central Surgery Installation with definite working hours and AC Split Duct from the installation of the Central Surgery for the emergency surgery. The Maintenance section IPRS has carried out good maintanance on the central AC by switching off the Central AC Chiller and the compressor of the AC Split Duct at the unscheduled time by using the BAS and by monitoring ducting leakage with manometer installation. The compact schedule and standard evaluation is deemed necessary to decrease the use of electrical power and the costs. The information system on the cost is to be enhanced by better financial management especially the accounting by training of the present financial staff to delegate the authority and responsibility in coordination and carry out the said effort it is necessary to appoint a Committee for Efficiency and to economize costs."
1997
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Fajrin Rivaldi
"ABSTRAK
Penelitian ini bertujuan untuk mengetahui apakah pola candlestick memiliki kemampuan dalam memprediksi pergerakan arah dari harga sekuritas di indeks LQ 45. Dengan jumlah pola yang diteliti adalah 10 pola sesuai dengan penelitian sebelumnya yang dijadikan sebagai acuan dalam menentukan pola yang diteliti, dalam penelitian ini ditemukan bahwa bearish engulfing, bullish engulfing, bullish harami, dan inverted hammer dapat digunakan untuk memprediksi pergerakan harga dalam jangka pendek sedangkan hanging man dapat digunakan untuk memprediksi pergerakan harga dalam jangka panjang.

ABSTRACT
This study aims to determine whether the candlestick pattern has the ability to predict the movement of the direction of the price of securities in the LQ 45 index. With the number of patterns studied are 10 patterns in accordance with previous research that serve as a reference in determining the pattern studied, in this study found that the bearish engulfing, bullish engulfing, bullish harami, and inverted hammer can be used to predict price movement in shorter term while hanging man can be used to predict price movement in longer term."
2017
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sagala, Tommy Wijaya
"Berdasarkan penelitian terdahulu, akurasi prediksi pergerakan harga saham rendah. Informasi dari media yang tidak akurat 100% dan pemanfaatan analisis teknis yang belum menghasilkan prediksi yang baik merupakan akar masalah pada penelitian ini. Hal ini penting, sebab bagi para spekulan pemanfaatan 2 hal tersebut berperan penting sebagai pertimbangan dalam melakukan transaksi saham. Maraknya berita mengenai resesi ekonomi, perang dagang, dan krisis ekonomi membuat sejumlah pelaku pasar berpotensi menarik diri dari pasar modal. Oleh sebab itu, penelitian ini bertujuan untuk menghitung seberapa besar akurasi hasil klasifikasi pergerakan harga saham menggunakan kombinasi analisis teknis dan analisis sentimen media online. Algoritma yang digunakan pada penelitian ini adalah Support Vector Machine (SVM), K-Nearest Neighbor (KNN), dan Naïve Bayes. Terdapat 2 tahapan klasifikasi pada penelitian ini. Tahapan pertama yakni melakukan klasifikasi sentimen dari media online untuk mendapatkan label sentimen. Tahapan kedua yakni melakukan klasifikasi pergerakan harga saham. Label sentimen hasil klasifikasi tahap pertama, dan analisis teknis berdasarkan pergerakan harga saham, menjadi atribut pada klasifikasi tahap kedua. Klasifikasi tahap kedua menghasilkan prediksi pergerakan harga saham berupa naik atau turunatau tetap Akurasi tertinggi yang dihasilkan dari kombinasi analisis teknis dan sentimen media online menghasilkan rata-rata akurasi sebesar 73,83% pada trading window 60 hari, dan 81,34% pada trading window 90 hari dengan menggunakan algoritma SVM.

Based on previous researches, the accuracy of predictions of stock price movements is low. Information from the media that is not 100% accurate and the use of technical analysis that has not produced good predictions is the root of the problem in this study. This is important, because for speculators the use of these 2 things plays an important role as a consideration in conducting stock transactions. The rise of news about the economic recession, trade war, and economic crisis has made a number of traders or investor potentially withdraw from the capital market. Therefore, this study aims to calculate how much the accuracy of the stock price movement classification results using a combination of technical analysis and online media sentiment analysis. The algorithms used in this study are Support Vector Machine (SVM), K-Nearest Neighbor (KNN), and Naïve Bayes. There are 2 stages carried out in this study. The first stage is to make sentiment classifications from online media to get sentiment labels. The second stage is to divide the stock price movements. The sentiment label from the first classification, and technical analysis based on stock price movements, are attributes based on the second classification. The second stage of classification is to get price quotes for "up" or down" or "constant". The highest accuracy resulting from a combination of technical analysis and online media sentiment resulted in an average accuracy of 73.83% on 60 days trading window, and 81.34% on 90 days trading window using SVM algorithm."
Jakarta: Fakultas Ilmu Komputer Universitas Indonesia, 2019
TA-Pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Anondho Wijanarko
"Minyak jarak adalah komoditi yang potensial untuk dikembangkan di Indonesia; demikian juga polyurethane, dimana pasar produk polyurethane berkembang pesat tanpa diiringi perkembangan industri dalam negeri. Polyurethane berbasis minyak jarak mempunyai banyak kelebihan dibandingkan yang ada umumnya. Dari analisis pasar, diketahui bahwa kapasitas pabrik yang sesuai untuk dibangun di Indonesia adalah 8.300 ton/tahun. Modifikasi minyak jarak dengan anhidrida suksinat dan neopentil glikol menghasilkan poliol poliester dengan reaktivitas tinggi, yang terutama sesuai digunakan sebagai komponen resin poliurethane untuk aplikasi coating, adhesive dan binder. Peralatan utama yang dibutuhkan di pabrik adalah: dua reaktor, sebuah mixer, empat pompa, sebuah kondenser, dan sebuah tangki. Hasil simulasi dengan bantuan CHEMCAD 5.2 menunjukkan efisiensi karbon sebesar 83,57% dan efisiensi energi sebesar 93,83%. Besarnya investasi yang dibutuhkan untuk membangun pabrik ini adalah Rp 21 miliar. Untuk setiap ton produk membutuhkan biaya manufaktur sebesar US$ 1,928 dimana harga jualproduk diasumsiknn sebesar USS 3,000. Analisis kelayakan ekonomi mendapatkan nilai: Net Present Value (NPV) sebesar USS 22.5 juta, Internal Rate of Return (IRR) 40,3%, dan Payout Period 2,03 tahun. Faktor yang paling sensitifyang dapat mempengaruhi kelayakan proyek ini adalah harga jual produk dan volume produksi. Berdasarkan analisayang dilakukan, pabrik layak untuk dibangun.

Castor oil is a potential commodity to be developed in Indonesia; polyurethane is also a potential one since its market grows rapidly without being accompanied by local industry's capability to fulfill. Polyurethane based on castor oil is superior in many properties to currently available polyurethane. According to market analysis, the suitable capacity to be applied is 8,300 tons/year. Modification of castor oil with succinic anhydride and neopentyl yields high reactivity polyester polyol suitable to be used as component of polyurethane resin for coating, adhesive and binder applications. Main equipments needed in the plant are: two reactors, one mixer, four pumps, one condenser, and one tank. Simulation with the aid of CHEMCAD 5.2 resulted in carbon efficiency of 83.57% and energy efficiency of 93.83%. Total investment required to construct this plant is about Rp 21 billion. Assuming product price of USS 3,000/ton, manufacturing cost will be US$ 1,928/ton-product. Economic feasibility analysis yielded values: Net Present Value (NPV) of USS 22.5 million, Internal Rate of Return (IRR) of 40.3%, and Payout Period of 2.03 operating-years. The most significant factors influencing the feasibility are product price and production volume. Based on the analysis that has been done, the plant is feasible to build."
Jurnal Teknologi, 2004
JUTE-XVIII-2-Jun2004-109
Artikel Jurnal  Universitas Indonesia Library
cover
Eko Wijatmoko
"Tesis ini membahas pengaruh volume transaksi dan variannya pada perdagangan valuta asing (pasangan mata uang GBPUSD) terhadap probabilitas sinyal beli dan sinyal jual pada indikator Relative Strenght Index (RSI) dengan menggunakan indikator RSI periode 14 dengan tingkat overbought 70, oversold 30 serta cut loss 20 pip, take profit 20 pip. Dari sinyal beli dan sinyal jual yang terjadi diketahui berapa jumlah sinyal yang profit (n) dari total terjadinya peristiwa tersebut (N). Untuk masing-masing kesepuluh varian volume pada terjadinya sinyal tersebut dicatat pada poin berapa dan diklasifikasikan dalam kelas tertentu untuk kemudian dicari persamaan logitnya dan juga rerata tingkat kemungkinannya.

Focus of this study is to investigate about the influence of transaction volume and its alternate indicators in forex trading GBPUSD concerning about buy signal?s probability and sell signal?s probability in Relative Strenght Index (RSI) indicator with overbought 70, oversold 30 and cut loss 20 pips, take profit 20 pips. Based on the occurrence of buy signal?s and sell signal?s, we can identify the correct (value=1) buy signal?s frequency and sell signal?s frequency (n) comparing to total buy or sell signal?s frequency (N). From 10 each varians of volume at the occurrence of signal, we determine it in what point and classify at the particular class point then calculate the logit equation and average probability."
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2009
T26538
UI - Tesis Open  Universitas Indonesia Library
cover
Dischler, Bernhard
"This handbook is a breakthrough in the understanding of the large number of spectral lines in diamond. Data on more than 2000 lines and bands are presented in 200 tables, including many unpublished results. In order to meet the interest in the understanding of the spectra, structure assignments for 80 % of the lines are given, of which 15 % only were published before. The majority of the structures for the 300 centers is explained in most cases for the first time.
"
Berlin : [Springer, ], 2012
e20425246
eBooks  Universitas Indonesia Library
cover
Iswan Putra
"ABSTRAK
Penggunaan technical analysis di Indonesia saat ini bisa dikatakan sudah
sangat luas, hal ini bisa dilihat dan banyaknya laporan analisa yang dihasilkan oleh
securities house ? securities house yang banyak menggunakan technical analysis
sebagai acuan analisa mereka. Luasnya pemakaian technical analysis mungkin
disebabkan karena pada saat krisis, fundamental analysis sulit untuk diterapkan. Jika
kita perhatikan pergerakan dan indeks harga saham gabungan BET yang mendatar dan
ceriderung menurun yang disebabkan oleh kondisi ekonomi yang buruk disertai
performa sebagian besar emiten yang menurun dan volume transaksi yang tipis. Maka
strategy buy dan hold atau investasi jangka panjang sulit diterapkan pada kondisi
pasar modal seperti saat ini.
Pasar modal kita juga tidak efisien dimana informasi penting dan suatu
saham/emiten hanya didapatkari oleh pihak-pihak tertentu. Sening kita lihat adanya
saham-saham yang mempunyai fundamental buruk tetapi pergerakan harganya sangat
luar blasa karena permainan pihak-pihak tertentu. Dan banyak investor yang tertipu
oleh permainan tersebut..Oleh sebab itu technical analysis menjadi alternatif yang
balk untuk menggantikan peían fundamental analysis dengan menerapkan strategi
berinvestasi dalam jangka waktu pendek khususnya saat kondisi perekonomian seperti
sekarang ini.
Sifat investor lokal yang umumnya melakukan strategi hit and run juga turut
membantu berkembangnya pemakaian technical analysis di Indonesia. Namun
sayangnya sebagian investor masih belum menerapkan jenis analisa ¡ni, sebagian
investor lokal tersebut masih berinvestasi bertarkan rumor yang beredar.
Dengan technical analysis diharapkan kelemahan clati fundamental analysis
pada saat krisis ekonomi dapat dikurangi dan kurangnya pengetahuan dan investor
bisa diperbaiki. Dengan cara menean metode yang dianggap paling tepat untuk suatu
saham tertentu agar menghasilkan profit maksimum seperti yang diharapkan.
"
2001
T5539
UI - Tesis Membership  Universitas Indonesia Library
cover
Faizal Ode Putra
"Di dalam RUPTL 2019 - 2028, pengembangan Gardu Induk dan Transmisi telah dihitung dan diproyeksi kebutuhan tenaga listrik untuk 10 - 20 tahun kedepan, dimana kebutuhan untuk sektor industri menjadi bidang yang paling mendominasi dalam hal kebutuhan pemakaian energi listrik. Sebagai wujud nyata, adanya proyek pembangunan GI 150/20 kV Ciruas/ Gunung Mulia adalah untuk mendukung pengembangan porduksi PT Gunung Mulia Steel beberapa tahun ke depan dan juga sebagai antisipasi pertambahan kebutuhan tenaga listrik di wilayah Gardu Induk dan sekitarnya. Namun disisi lain, instalasi Konsumen Tegangan Tinggi yang dibangun oleh PT Gunung Mulia Steel belum tersambung dengan Gardu Induk 150/20 kV Ciruas/ Gunung Mulia dan belum siap beroperasi dikarenakan masih dalam tahap pembangunan. Hal ini tentunya dapat menjadi potensi kehilangan pendapatan penjualan energi listrik. Oleh sebab itu pada penelitian ini, dilakukan analisis finansial dan teknis pada proyek pembangunan Gardu Induk 150/20 kV Ciruas/ Gunung Mulia yang telah beroperasi untuk menentukan tingkat pengembalian investasi terhadap penjualan energi listrik sehingga dapat menilai apakah masih dikatakan layak atau tidak layak. Metode yang digunakan yaitu dengan cara mengumpulkan data - data teraktual dan beberapa parameter proyeksi kebutuhan tenaga listrik. Selanjutnya dari data - data tersebut, dilakukan pengolahan hasil perhitungan yang menunjukkan indikator IRR, NPV, B/C. Sesudah itu, dilakukan evaluasi dampak dan perbandingan terhadap pengembalian investasi dan penjualan tenaga listrik dengan menyajikan beberapa skenario. Selain itu dari pendekatan segi teknis, dengan adanya konfigurasi baru saat ini diharapkan tidak menyebabkan kemunduran dalam hal pelayanan mutu dan keandalan penyaluran tenaga listrik ke konsumen

In the 2019-2028 RUPTL, the development of substations and transmissions has been calculated and projected electricity needs for the next 10 - 20 years, where the need for the industrial sector is the most dominating field in terms of the need for electricity consumption. As a concrete manifestation, the existence of the Ciruas/ Gunung Mulia high voltage substation construction project is to support the development of PT Gunung Mulia Steel's production in the next few years and also to anticipate the increasing demand for electricity in the substation area and its surroundings. But on the other hand, the High Voltage Consumer installation built by PT Gunung Mulia Steel has not been connected to the Ciruas/ Gunung Mulia high voltage substation and is not ready to operate because it is still under construction. This of course can be a potential loss of income from sales of electrical energy. Therefore, in this study, a financial and technical analysis was carried out on the construction project of the Ciruas/ Gunung Mulia high voltage substation which has been operating to determine the rate of return on investment on the sale of electrical energy so that it can assess whether it is still feasible or not feasible. The method used is by collecting actual data and several projection parameters of electricity demand. Furthermore, from these data, the calculation results are processed showing the IRR, NPV, B / C indicators. After that, an evaluation of the impact and comparison of returns on investment and sales of electricity was carried out by presenting several scenarios. Apart from that, from a technical point of view, with the current new configuration it is hoped that it will not cause a setback in terms of service quality and reliability of electricity distribution to consumers."
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library