cover
Rugaiyah
Bogor: Ghalia Indonesia, 2012
371.1 RUG p
Buku Teks  Universitas Indonesia Library
cover
Andreas Anugerah Pitoyo
"Energi terbarukan dari panel surya merupakan energi bersih dan jumlahnya melimpah. Energi terbarukan ini dapat dimanfaatkan untuk mengisi daya kendaraan listrik saat pagi hari sampai sore hari, sehingga panel surya dapat digolongkan sebagai sumber energi listrik sekunder. Panel surya dapat dipasang pada atap Stasiun Pengisian Kendaraan Listrik Umum untuk mengumpulkan energi ketika matahari bersinar. Energi yang dikumpulkan panel surya merupakan energi listrik yang nantinya digunakan untuk melakukan pengisian baterai kendaraan listrik umum. Tentunya, semakin banyak panel surya yang dipasang maka energi listrik yang dikumpulkan semakin banyak, oleh karena itu dapat dipertimbangkan pemasangan panel surya pada sisi atap SPKLU. Melalui abstrak ini, akan dipertimbangkan aspek desain dan ekonomi, seperti NPV, IRR, DPP, dan LCOE dari SPKLU yang didesain. Seiring dengan tren menurunnya harga panel surya dan baterai tiap tahunnya, maka pemanfaatan panel surya di atas atap SPKLU akan semakin mudah terealisasi. Selain energinya bersih, biaya per satuan energi kWh dari panel surya akan semakin murah tiap tahunnya.

Renewable energy from solar panels is one of many renewable energy that is clean and abundant. Energy from solar panel can be used to charge electric vehicles from morning to evening, hence solar panels can be classified as a secondary source of electrical energy. Solar panels can be installed on the roof of Public Electric Vehicle Charging Stations to collect energy when the sun is shining. The energy collected by solar panels is electrical energy which will later be used to charge public electric vehicle batteries. The more solar panels that are installed, the more electrical energy will be harvested, therefore it is good choice to consider installing solar panels on the roof side of the SPKLU. Through this abstract, aspects of design and economics such as NPV, IRR, DPP, and LCOE will be discussed. In line with the trend of decreasing prices for solar panels and battery each year, the use of solar panels on SPKLU roofs will become easier to realize. Apart from being clean energy, the cost per unit of kWh energy from solar panels will get cheaper every year."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Aero Bestari Wangsaputra
"Permintaan akan energi, khususnya energi listrik, di Indonesia semakin tinggi dan menjadi bagian tak terpisahkan dari kebutuhan hidup masyarakat dan sektor industri. Namun, ketersediaan bahan bakar fosil yang digunakan untuk menghasilkan listrik semakin terbatas, serta polusi yang dihasilkan oleh proses konversi dari bahan bakar fosil tersebut. Indonesia memiliki potensi energi surya sebesar 207,8 GWp Namun, potensi ini belum dimanfaatkan secara optimal. Oleh karena itu, potensi tersebut dapat dioptimalkan dengan instalasi PLTS atap pada bangunan dengan konsumsi listrik tinggi. Gedung MRPQ Universitas Indonesia dengan konsumsi listrik yang relatif tinggi dijadikan sebagai lokasi studi. Penelitian bertujuan untuk mengetahui konfigurasi dan skema paling optimal berdasarkan Net Present Cost (NPC) dan beberapa parameter ekonomi seperti Net Present Value (NPV), Internal Rate of Return (IRR), dan Payback Period. Pada HOMER, dilakukan simulasi dengan konfigurasi On-Grid dan Off-Grid. PLTS On-Grid disimulasikan dengan variasi penambahan generator set, sedangkan PLTS Off-Grid disimulasikan dengan variasi jenis baterai Lead Acid dan Lithium Ion. Hasil simulasi HOMER dan analisis menunjukkan bahwa penambahan generator set pada sistem PLTS On-Grid optimal menghasilkan NPC yang lebih tinggi dibandingkan dengan sistem tanpa generator set. Kemudian, penggunaan baterai jenis Lithium Ion pada sistem PLTS Off-Grid optimal menghasilkan NPC yang lebih rendah dibandingkan dengan baterai jenis Lead Acid. Dengan demikian, PLTS On-Grid tanpa generator set merupakan konfigurasi paling optimal berdasarkan NPC dan layak untuk diimplementasikan berdasarkan NPV, IRR, dan Payback Period.

The demand for energy, especially electrical energy, in Indonesia is increasing and has become an integral part of the needs of society and the industrial sector. However, the availability of fossil fuels used to generate electricity is increasingly limited, as well as the pollution generated by the conversion process of these fossil fuels. Indonesia has a solar energy potential of 207.8 GWp. However, this potential has not been optimally utilized. Therefore, this potential can be optimized by installing rooftop solar power plants (PLTS) on buildings with high electricity consumption. The MRPQ building of the University of Indonesia with relatively high electricity consumption was used as the study site. The research aims to determine the most optimal configuration and scheme based on Net Present Cost (NPC) and several economic parameters such as Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period. In HOMER, simulations were performed with On-Grid and Off-Grid configurations. On-Grid PLTS is simulated with variations in the addition of generator sets, while Off-Grid PLTS is simulated with variations in the types of Lead Acid and Lithium Ion batteries. HOMER simulation results and analysis show that the addition of a generator set to the optimal On-Grid PLTS system results in a higher NPC compared to the system without a generator set. Then, the use of Lithium Ion batteries in the optimal Off-Grid PLTS system results in a lower NPC compared to Lead Acid batteries. In summary, On-Grid PLTS without a generator set is the most optimal configuration based on NPC and feasible to implement based on NPV, IRR, and Payback Period.

"
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Kezia Sherlita
"Perlindungan pada sistem tenaga listrik harus dirancang untuk memenuhi prinsip kehandalan, selektivitas, dan prinsip kestabilan, yang dapat dicapai melalui zonasi dan koordinasi proteksi. Dalam hal deteksi dan koordinasi proteksi gangguan tanah, sistem harus mempertimbangkan alokasi pentanahan dan kesesuaian hubungan, seperti pentanahan solid atau impedansi. Oleh karena itu, pemilihan lokasi dan koneksi pentanahan yang tidak tepat dapat menyebabkan gangguan yang tidak diinginkan dan kegagalan yang bertingkat. Studi ini menyajikan desain korektif untuk deteksi dan koordinasi proteksi gangguan hubung singkat satu fasa ke tanah. Sistem pentanahan dievaluasi dengan menggunakan rangkaian urutan nol untuk memperkirakan gangguan yang dapat terjadi pada sistem. Implementasi dari Standar IEEE 142-2007 digunakan untuk menyediakan sistem yang terhubung secara efektif, yang menghasilkan lokasi dan koneksi yang sesuai untuk pentanahan. Simulasi dilakukan dengan menggunakan perangkat lunak analisis sistem tenaga untuk membandingkan kinerja sebelum dan setelah desain korektif yang diusulkan. Hasilnya menunjukkan bahwa desain yang diusulkan dapat mengoreksi kesalahan operasi proteksi kesalahan tanah.

Power system protection must be designed to meet the reliability, selectivity, and stability principle, which can be achieved through zoning and coordination. In the case of ground fault protection detection and coordination, the appropriate grounding allocation and connection, i.e. solid or impedance, shall be considered throughout the system. Hence, inaccurate selection for grounding location and connection may lead to undesirable disturbances and cascaded failure. This paper presents a corrective design for ground fault protection detection and coordination in an actual 34.5 kV power system network which has faced several misoperation of the ground fault protection. For this, the system’s grounding is assessed by using zero sequence network and the issues are summarized. The implementation of IEEE 142-2007 Standard is utilized to provide an effectively grounded system, resulting in the suitable location and connection for the grounding. The simulation is carried out by using power system analysis software to compare the performances before and after the proposed corrective design. The results shows that the proposed design can solve the misoperation of the ground fault protection."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf