Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 84 dokumen yang sesuai dengan query
cover
Abdul Salaam
Abstrak :
Laporan praktik keinsinyuran ini membahas mengenai proses perbaikan refraktori reheating furnace pada plate rolling dan hot rolling. Pembahasan difokuskan pada aspek teoritis refraktori dan as-rolled steel, mekanisme proses perbaikan refraktori pada Reheating furnace, mencakup perbaikan pada beam (walking dan moving), perbaikan pintu charge-discharge, perbaikan pada atap, dan juga mencakup dengan aspek safety.dan permasalahan yang terjadi di lapangan. Metodologi yang digunakan berbasis pendekatan Critical Review Analysis yang terdiri dari Studi Kasus, diskusi/brainstorming, dan pengalaman penulis. Review studi proses perbaikan refraktori pada reheating furnace Plate Rolling dan Hot Rolling dilakukan untuk memperoleh acuan dasar dalam proses perbaikan refraktori reheating furnace, mengingat belum tersedianya paper yang membahas terkait dengan proses Perbaikan refraktori baik dalam segi metode perbaikan dan juga kasus yang terjadi di lapangan. Hasil review menunjukkan bahwa perlu diadakan penelitian lebih lanjut mengenai metode perbaikan hot repair pada Reheating furnace dengan mempertimbangkan aspek safety agar dapat mengoptimalkan proses produksi tanpa perlu menghentikan jalannya operasi untuk melakukan perbaikan refraktori. ...... This engineering report discusses the process of repairing refractories in the reheating furnace for plate rolling and hot rolling. The discussion is focused on the theoretical aspects of refractories and as-rolled steel, the mechanism of refractory repair in the reheating furnace, including repairs to the beam (walking and moving), charge-discharge door repairs, roof repairs, and also covers safety aspects and issues encountered in the field. The methodology used is based on the Critical Review Analysis approach, consisting of case studies, discussions/brainstorming, and the author's experience. A review of the refractory repair process in plate rolling and hot rolling reheating furnaces was conducted to establish a basic reference for the refractory repair process, considering the lack of papers addressing refractory repair methods and field cases. The results of the review indicate the need for further research on hot repair methods in the reheating furnace, taking into account safety aspects to optimize the production process without the need to halt operations for refractory repairs.
Depok: Fakultas Teknik Universitas Indonesia, 2024
PR-PDF
UI - Tugas Akhir  Universitas Indonesia Library
cover
Aggie Farkhantiansyah
Abstrak :
Jakarta, kota metropolitan dengan kepadatan 16.158 orang per km² (BPS, 2022), membutuhkan solusi transportasi yang efisien seperti Mass Rapid Transit (MRT) berbasis rel. MRT dinilai aman, nyaman, ramah lingkungan, dan tepat waktu. Pembangunan stasiun kereta bawah tanah yang baru dimulai di Indonesia memerlukan dinding diafragma (D-wall) sebagai struktur penahan tanah. Proses desain dan konstruksi D-wall ini membutuhkan insinyur dengan etika dan profesionalisme tinggi untuk mengatasi tantangan yang ada. Penelitian ini bertujuan untuk memahami tahapan dan tantangan desain serta konstruksi dinding diafragma stasiun bawah tanah, dan mengkaji penerapan K3, kode etik, serta etika profesi insinyur dalam proses tersebut. Hasil penelitian diharapkan memberikan wawasan mendalam mengenai kompleksitas pembangunan D-wall pada proyek MRT Jakarta Fase 2 dan menekankan pentingnya etika profesi serta standar K3 dalam industri konstruksi. Dengan demikian, penelitian ini berkontribusi pada peningkatan kualitas desain dan konstruksi infrastruktur transportasi bawah tanah di Indonesia. ...... Jakarta, a metropolitan city with a population density of 16,158 people per km² (BPS, 2022), requires efficient transportation solutions such as Mass Rapid Transit (MRT) based on railways. MRT is considered safe, comfortable, environmentally friendly, and punctual. The construction of underground train stations, newly initiated in Indonesia, necessitates the use of diaphragm walls (D-walls) as soil retaining structures. The design and construction process of these D-walls require engineers with high ethics and professionalism to address the existing challenges. This study aims to understand the stages and challenges of designing and constructing diaphragm walls for underground train stations, and to examine the implementation of occupational safety and health (K3), ethical codes, and professional ethics among engineers in this process. The research results are expected to provide in-depth insights into the complexity of D-wall construction in the MRT Jakarta Phase 2 project and emphasize the importance of professional ethics and K3 standards in the construction industry. Thus, this research contributes to improving the quality of design and construction of underground transportation infrastructure in Indonesia.
Depok: Fakultas Teknik Universitas Indonesia, 2024
PR-PDF
UI - Tugas Akhir  Universitas Indonesia Library
cover
Rizkiawan Pangestu
Abstrak :
Saat ini masih terdapat kawasan industri yang belum bisa memberikan dampak baik terhadap lingkungan. Dalam merencanakan dan membangun konsep hijau 10-20% lebih mahal dari pada bangunan konvensional. Dalam hal ini Kawasan Industri untuk memberikan dampak yang baik terhadap lingkungan, dapat melakukan proses Green Retrofitting dengan acuan assessment berdasarkan kaidah-kaidah Petunjuk Teknis Permen PUPR No. 1 Tahun 2022, yang di dalamnya terdapat tiga peringkat. Setelah diterapkannya proses Green Retrofitting pada Kawasan Industri XXX. Diperoleh nilai sebesar 70 poin dengan nilai Rp 24.352.030.022,- pada kondisi awal. Setelah dilakukan assessment dan penyesuaian RAB menjadi tingkat Pratama diperoleh nilai sebesar 84 poin dengan nilai RAB sebesar Rp 27.409.030.022,-, sedangkan untuk menjadi tingkat Madya diperoleh nilai sebesar 116 poin dengan nilai RAB sebesar Rp 28.013.580.022,-, sedangkan untuk menjadi tingkat Utama sebesar 135 poin dengan nilai RAB sebesar Rp 28.872.580.022,-. Secara presentasi peningkatan RAB untuk mencapai tingkat Pratama terdapat penambahan biaya sebesar 11,15%, sedangkan untuk mencapai tingkat Madya membutuhkan penambahan biaya sebesar 13,07% dan tingkat Utama sebesar 15,66% dari biaya awal. ...... Many industrial estate still failed to positively impact the environment. Implementing and constructing green concepts typically costs 10-20% more than traditional buildings. To improve environmental impact, industrial estate can undergo Green Retrofitting based on the guidelines provided in Technical Instructions Permen PUPR No. 1 of 2022, which outlines three rating levels. Following the Green Retrofitting process in the XXX Industrial Area, the initial assessment yielded a score of 70 points with a cost of Rp 24,352,030,022. After reassessment and adjustment of the Budget Plan (RAB) to achieve the Pratama level, the score increased to 84 points with an RAB of Rp 27,409,030,022. For the Madya level, the score reached 116 points with an RAB of Rp 28,013,580,022, and for the Utama level, the score reached 135 points with an RAB of Rp 28,872,580,022. The cost increases to achieve these levels were 11.15% for Pratama, 13.07% for Madya, and 15.66% for Utama, compared to the initial cost.
Depok: Fakultas Teknik Universitas Indonesia, 2024
PR-PDF
UI - Tugas Akhir  Universitas Indonesia Library
cover
Yossi Andreano
Abstrak :
Leadframe merupakan salah satu komponen penting dalam pembuatan sirkuit terpadu. Aplikasi ini membutuhkan spesifikasi kompleks seperti kekuatan tarik dan konduktivitas listrik yang tinggi serta koefisien ekspansi termal yang rendah untuk memastikan performa yang baik. Hal tersebut menjadikan kandidat material yang layak digunakan untuk aplikasi ini menjadi sangat terbatas. Salah satu material yang umum digunakan dalam pembuatan leadframe adalah paduan tembaga. Namun, pengembangan material tersebut untuk memenuhi spesifikasi yang dibutuhkan bukanlah hal yang mudah. Penemuan kandidat paduan tembaga ini membutuhkan banyak uji coba hingga ditemukan kombinasi unsur paduan dan jenis pemrosesan yang optimal. Oleh karena itu, dibutuhkan sebuah pendekatan baru yang dapat mempercepat proses penemuan paduan tembaga baru dengan kombinasi sifat mekanis, elektrik, dan termal yang optimal. Salah satu solusi yang ditawarkan untuk mengatasi permasalahan ini adalah menggunakan metode ML. Pada penelitian ini enam buah model yang terdiri atas lima model ML klasik dan satu model DL dibangun untuk melakukan prediksi struktur material (model P2S) dan prediksi properti material (model S2P). Berdasarkan nilai koefisien determinasi (R2 ) ditemukan dua model P2S dan S2P terbaik adalah BPNN dan XGB. Kemudian, masing-masing model tersebut diintegrasikan untuk membentuk MLDS. Hasil MLDS menunjukkan bahwa program yang dibangun menggunakan model XGB memiliki fluktuasi (standar deviasi) yang lebih rendah dan dapat digunakan untuk memberikan rekomendasi paduan tembaga baru untuk aplikasi leadframe yang sejalan dengan literatur. ......The leadframe is one of the crucial components in the manufacturing of Integrated Circuits (ICs). This application requires complex specifications such as high tensile strength and electrical conductivity, as well as low thermal expansion coefficients to ensure optimal performance. These requirements significantly limit the potential materials suitable for this application. One of the materials commonly used in the production of leadframes is copper alloys. However, developing this material to meet the necessary specifications is not easy. Discovering a suitable copper alloy candidate involves a lot of trial and error to find the optimal combination of alloying elements and processing methods. Therefore, a new approach is needed to accelerate the discovery process of new copper alloys with an optimal combination of mechanical, electrical, and thermal properties. One proposed solution to address this issue is the use of machine learning methods. In this study, six models consisting of five classical machine learning models and one deep learning model were developed to predict material structure (P2S model) and material properties (S2P model). Based on the coefficient of determination (R²) values, the best P2S and S2P models were found to be BPNN and XGB, respectively. These models were then integrated to form a Machine Learning Design System (MLDS). The results of the MLDS showed that the program built using the XGB model has lower fluctuation (standard deviation) and could be used to recommend new copper alloys for leadframe applications in line with the literature.
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Arga Fransdika
Abstrak :
Struktur atap Jakarta International Stadium mempunyai ukuran 244m x 269m di ketinggian puncak 82m. Melakukan pekerjaan assembling pada ketinggian 70-80 meter di atas permukaan tidaklah mudah. Dengan metode konvensional diperlukan alat bantu perancah yang tinggi, tingkat kesulitan terkait kepresisian saat proses fit up, serta tingkat risiko yang tinggi dari segi keselamatan kerja. Dengan kondisi seperti itu, perlu inovasi metode proses pemasangan Atap Jakarta International Stadium yaitu menggunakan metode lifting dengan strand jack. Dimana dengan metode lifting ini, rangka atap dilakukan assembling di ground level lalu dilakukan lifting sampai elevasi rencana. Dari aspek keamanan dan mutu, lifting menggunakan strand jack lebih aman dilakukan karena lebih banyak pekerjaan dilakukan di bawah. Hal ini membuat sisi pengawasan dan pengendalian terhadap alat maupun pekerja lebih mudah dilakukan. Pekerjaan di bawah juga dapat meminimalisir faktor angin yang berdampak pada kenyamanan saat melakukan pekerjaan.Dari aspek waktu pelaksanaan pekerjaan struktur atap metode lifting menggunakan strand jack memerlukan waktu 486 hari. Hal ini lebih cepat jika dibandingkan dengan metode konvensional yang memerlukan waktu 1121 hari. ......The roof structure of the Jakarta International Stadium measures 244m x 269m at the height of 82m. Assembling work at an elevation of 70-80 meters above ground: with the conventional method, a high level of scaffolding, the difficulty level is related to precision during the fit-up process and a high level of risk from the work safety perspective. With such conditions, it is necessary to innovate the method of installing the roof of the Jakarta International Stadium, namely using the lifting method with strand jacks. With this lifting method, the roof truss is assembled at ground level and lifted up to the planned elevation. From safety and quality, lifting using a strand jack is safer because more work is done below. It makes supervision and control of tools and workers easier to do. The work below can also minimize the wind factor, which impacts work comfort. From the time of carrying out the roof structure work, the lifting method using strand jacks takes 486 days. It is faster when compared to the conventional way, which takes 1121 days.
Depok: Fakultas Teknik Universitas Indonesia, 2022
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Sudirwan
Abstrak :
Unit Pelaksana Teknis Pengukuran dan Pengujian Bahan Konstruksi adalah Laboratorium Penguji pada Dinas Pekerjaan Umum Penataan Ruang Kota Tangerang, yang melaksanakan fungsinya untuk melaksanakan pengujian bahan konstruksi. SNI ISO/IEC 17025 : 2017 merupakan Persyaratan Umum untuk Kompetensi Laboratorium Penguji dan Laboratorium Kalibrasi. Dengan telah menunjukkan kompetensinya sebagai laboratorium penguji, dengan menerapkan secara konsisten SNI ISO/IEC 17025 : 2017, maka KAN ( Komite Akreditasi Nasional) menerbitkan dan memberikan sertifikat Aktreditasi dengan Nomor LP -1696 -IDN sebagai Laboratorium Penguji. Hal ini memberikan kepastian atas hasil uji yang diterbitkan oleh Laboratorium Penguji yang dimiliki Pemerintah Daerah dan memberikan kepastian atas penilaian kualitas atas pekerjaan mutu Konstruksi di lapangan. ......The Technical Implementation Unit for Measurement and Testing of Construction Materials is the Testing Laboratory at the Tangerang City Spatial Planning Public Works Service, which carries out its function to carry out testing of construction materials. SNI ISO/IEC 17025 : 2017 is a General Requirement for the Competence of Testing Laboratories and Calibration Laboratories. By demonstrating its competency as a testing laboratory, by consistently applying SNI ISO/IEC 17025: 2017, KAN (National Accreditation Committee) issues and grants an Accreditation certificate with LP Number -1696 -IDN as a Testing Laboratory. This provides certainty for the test results issued by the Testing Laboratory owned by the Regional Government and provides certainty for the quality assessment of construction quality work in the field.
Depok: Fakultas Teknik Universitas Indonesia, 2022
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Junaiedy Malay
Abstrak :
Ciujung Priority Civil Works Package 3 adalah paket pekerjaan penanggulangan banjir yang dikerjakan oleh PT. PP-AMKA KSO, merupakan proyek yang menggunakan dana pinjaman dari Asian Devlopment Bank. Sebagai bentuk tanggung jawab Indonesia proyek ini diharapkan dapat memberikan manfaat bagi masyarakat sekitarnya Sungai Ciujung. Praktik keinsinyuran ini bermaksud untuk mengevaluasi progres pekerjaan di Proyek Ciujung Priority Civil Works Package 3. Hasil evaluasi penulis deviasi progress pada bulan 13 waktu pelaksanaan sebesar – 14.970 %, kemudian penulis mencari langkah-langkah penanganan pelaksanaan pekerjaan dengan cara melakukan Mutual Check, Rekayasa Desain, dan Contract Change Order (CCO), langkah tersebut diambil untuk mengejar ketertinggalan progress. Kemudian hasil dari evaluasi yang diterapkan dilapangan untuk mampu mengejar progress pekerjaan sesuai dengan progress yang direncanakan. ......Ciujung Priority Civil Works Package 3 is a flood management work package carried out by PT. PP-AMKA KSO, is a project that uses loan funds from the Asian Devlopment Bank. As a form of Indonesia's responsibility, this project is expected to provide benefits to the surrounding community of the Ciujung River. This engineering practice intends to evaluate the progress of work in the Ciujung Priority Civil Works Package 3 Project. The results of the author's evaluation of the deviation of progress in the 13th month of implementation time of – 14,970%, then the author looked for steps to handle the implementation of the work by conducting Mutual Checks, Design Engineering, and Contract Change Orders (CCO), these steps were taken to catch up with the progress. Then the results of the evaluation applied in the field to be able to pursue the progress of the work in accordance with the planned progress.
Depok: Fakultas Teknik Universitas Indonesia, 2022
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Josia Irwan Rastandi
Abstrak :
Pada pekerjaan konstruksi struktur jembatan tidak menutup kemungkinan akan terjadinya kesalahan yang mengakibatkan ketidaksesuaian dan defect. Jembatan skew steel box girder yang diteliti dalam laporan ini, diketahui memiliki ketidaksesuaian lendutan girder aktual terhadap chamber rencana. Apabila dilakukan back analysis untuk menghitung perkiraan tegangan layan berdasarkan kondisi tersebut, diperoleh tegangan melebihi tegangan ijin pada kondisi layan sehingga diperlukan perkuatan. Metode perkuatan yang dipilih adalah dengan external prestressing dengan pertimbangan bahwa prestressing dapat mereduksi tegangan berlebih pada struktur eksisting, sehingga dalam kondisi layan, tegangan masih relatif sama dengan kondisi awal dan memenuhi batasan sesuai peraturan. Metode perkuatan dengan menggunakan external prestressing ini dapat diterapkan dengan efektif sejauh direncanakan dengan baik disertai data-data dari kondisi eksisting yang akurat. Dari perbandingan antara hasil analisis pemodelan dengan pengukuran di lapangan memberikan hasil yang cukup mendekati, sehingga dapat diyakini bahwa pelaksanaan di lapangan sesuai dengan perencanaan. ......In a bridge structure construction work, it is possible for errors to occur which will result in flaws and defects. The skewed steel box bridge studied in this report is known to have a mismatch in deflection between the actual and the designed chamber. If a back analysis is performed to calculate the estimated service stress based on these conditions, the stresses exceed the allowable stresses in service condition so that a repair or strengthening is required. The strengthening method chosen is external prestressing with the consideration that prestressing can reduce excess stresses in the existing structure, so the stresses in service condition are relatively still the same as in the existing structure and meet the limit according to standard. This strengthening method using external prestressing can be implemented effectively as long as it is properly designed with accurate data from the existing condition. The comparison between the results of analysis model and measurements on site shows quite close results, so it can be assured that the implementation on the site is in accordance with the design.
Depok: Fakultas Teknik Universitas Indonesia, 2022
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Zainal Luthfi
Abstrak :
Proyek revitalisasi pipa alat penyiram pada spherical tank pada Depot LPG Tanjung Priuk, Jakarta Utara merupakan proyek milik PT. Pertamina Patra Niaga. Terdapat 3 unit alat penyiram yang akan dilakukan revitalisasi pipa pada 3 unit spherical tank. Pengawasan mutu pada produk sambungan las pada proyek revitalisasi pipa alat penyiram mengacu pada ASME Code sebagai referensi mutu. ASME Code yang sangat berpengaruh pada proyek revitalisasi pipa alat penyiram ini adalah ASME Sec IX, ASME B31.3, dan ASME B16.5. Direct Acceptance Product merupakan suatu ukuran persentase produk yang dapat diterima melalui pengujian. Rejection Rate digunakan sebagai persentase produk sambungan las yang reject yang dihasilkan oleh welder, produk tersebut akan diuji dengan metode uji tak rusak (Non-destructive Test) Liquid Penetrant. ......Spherical tank sprinkler pipe revitalization project at Depot LPG Tanjung Priuk, Jakarta Utara is a project owned by PT. Pertamina Patra Niaga. There are 3 sprinkler unit which will be revitalized in 3 spherical tank units. Quality control process of welding joint product in this revitalization project based on ASME Code as quality reference. ASME Code used in sprinkler revitalization project are ASME Sec IX, ASME B31.3, and ASME B16.5. Direct Acceptance Product is a count of product acceptance percentage by examination. Rejection rate is used as rejected percentage of welding joint product produced by welder, there product will be examined by Non-destructive Test Liquid Penetrant Methode.
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Gilbert Lesmana
Abstrak :
Meningkatnya kebutuhan akselerasi untuk penemuan material untuk perovskite 3D sangat penting untuk menemukan material yang bebas timah dan ramah lingkungan untuk semikonduktor dan sel surya. Solusi dominan untuk tren ini bergantung pada klasifikasi material dan penyaringan sejumlah besar material perovskit yang dilakukan setelah simulasi ab-initio. Untuk menyelesaikan masalah dua langkah, kami menggunakan algoritme pembelajaran mendalam sebagai cara untuk mengeluarkan materi baru, mempercepat penemuan materi, dan memberikan opsi yang lebih cepat untuk bereksperimen. Dalam studi ini, pembuatan perovskit 3D bebas timah baru melibatkan dua algoritme: berbasis generasi dan berbasis prediksi. Model yang digunakan masing-masing didasarkan pada Conditional Variational Autoencoders (CVAE) dan Convolutional Neural Networks (CNN). Metrik evaluasi kerugian divergensi khusus Kullback-Leibler sebesar 38 dihasilkan dari dekoder CVAE. Skor R2 0,74 - 0,81, Akurasi 0,73 - 0,87, MAE 0,3631 - 6,2339, RMSE 0,34 - 0,57 diperoleh dari 4 model prediksi yang berbeda berdasarkan 4 properti menggunakan tipe regresi dan multi kelas. Eksperimen dengan Materials Studio juga dilakukan untuk memvalidasi hasil yang dihasilkan dari algoritma CVAE. Eksperimen ini menggunakan CsPbBr3 sebagai properti target untuk membuat material baru, PrLiO3. Seperti yang diperkirakan, energi celah pita PrLiO3 kelas 2 (0 < x ≤ 1 eV) dihitung dari Materials Studio menjadi 0,979 eV, menunjukkan bahan semikonduktor dan kemampuan prediksi yang tepat dari algoritme. ......The growing need of acceleration for materials discovery for 3D perovskites are imperative to find lead-free and environmentally friendly materials for semiconductors and solar cells alike. The dominant solutions for these trends rely on the classification of materials and filtering of a huge range of perovskite materials done after ab-initio simulations. To resolve the two-step problem, we used a deep learning algorithm as a way to output new materials, accelerate materials discovery and providing quicker options to experiment upon. In this study, the generation of new lead-free 3D perovskites involves two algorithms: generational-based and prediction-based. Models used were based on Conditional Variational Autoencoders (CVAE) and Convolutional Neural Networks (CNN) respectively. The evaluation metrics Kullback-Leibler custom divergence loss of 38 were generated from the CVAE decoders. R2 score of 0.74 - 0.81, Accuracy of 0.73 - 0.87, MAE of 0.3631 - 6.2339, RMSE of 0.34 - 0.57 are obtained from 4 different prediction models based on the 4 properties using both regression and multi-class type. Experiments with Materials Studio was also done to validate the generated result of the CVAE algorithm. This experiment used CsPbBr3 as the target properties to create the new material, PrLiO3. As predicted, the band gap energy of PrLiO3 class 2 (0 < x ≤ 1 eV) was calculated from Materials Studio to be 0.979 eV, indicating a semiconductor material and the correct predictive capability of the algorithm.
Depok: Fakultas Teknik Universitas Indonesia, 2023
TA-pdf
UI - Tugas Akhir  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9   >>