Pengaruh kualitas subkontraktor terhadap kinerja waktu pada proyek flyover di Jabotabek

Budi Setiawan; Yusuf Latief, supervisor; Asiyanto, supervisor (Fakultas Teknik Universitas Indonesia, 2006)

 Abstrak

Terdapat beberapa penyebab sering terjadinya pengendalian proyek yang kurang efektif yang menyebahkan keterlambatan pada proyek flyover. dimana implementasinya tidak sesuai dengan yang diharapkan atau direncanakan. Penyebab tersebut diantaranya adalah kurang tepatnya memilih dan mendapatkan peserta (rekanan) subkontraktor yang berkualitas yang dianggap mampu diserahi tugas pekerjaan tertenlu.
Keterlambatan yang disebabkan subkontraktor antara lain: Keterlambatan pengiriman 1 mobilisasi, kemampuan subkontraktor, jeleknya mutu, kurangnya monitoring dan pengendalian, keterkaitan dengan suplier lain, sub kontraktor yang bangkrut.
Kendala-kendala yang menghambat pencapaian kinerja waktu pada penelitian ini adalah: kurangnya pengalaman yang dipurryai subkontraktor dan manajemen skill dalam perencanaan dan pengendalian dan penguasaan metode konstruksi dan teknologi yang dimiliki subkontraktor, kemampuan dalam pengadaan tenaga kerja yang berkualitas juga mempengaruhi efisiensi dan kinerja waktu, karena akan mengurangi reworks, kesalahan persepsi dalam menafsirkan klausul-klausul dari subkontrak yang berdampak mute pekerjaan tidak sesuai spesifikasi, koordinasi antar fungsi pada organisasi proyek yang tidak balk yang berdampak keputusan yang dihasilkan tidak efektif.
Hasil-hasil temuan penelitian berdasarkan dari 31 kuisioner yang terdiri dari 37 variabel menunjukkan bahwa, terdapat variabel-variabel yang mempengaruhi kualitas subkontraktor pada pelaksanaan poyek flyover terhadap kinerja waktu di wilayah Jabotabek. Diperoleh 3 variabel penentu model penentu ditambah 1 faktor dummy untuk hubungan kualitas subkontraktor terhadap kinerja waktu : metode konstruksi, pcngaiaman subkontraktor, kemampuan dalam tenaga kerja segi kualitas dan kemampuan dalam pengadaan mandor.

There are some cause often the happening of operation of less effective project which cause delay at project of fly over, where its implementation disagree with which is expected or planned. The cause among others is less precisely chosen and get participant ( subcontractor ) with quality which is assumed can handle special work.
Delay caused by subcontractor for example: Delay of delivery mobilization, ability of subcontractor, bad of quality, lack of operation and monitoring, related to other suplier, bankrupt subcontractor.
Constraints pursuing attainment of time performance this research is lack of experience had by management and subcontractor of skill in the plan and operation and domination of construction method and technology by subcontractor, ability in levying of labour which with quality also influence time performance and efficiency, because will lessen reworks, mistake of perception in interpreting clauses of subcontract affecting quality of inappropriate work of specification, interfunction coordination at organization of project of bad which affect decision is not effective.
This research has identified from 31 kuisioner which consist of 37 variable indicate that, there are variables influencing the quality of subcontractor at execution of fly over project to time performance in region of Jabotabek. Obtained by 3 variable pacesetter of determinant added by 1-factor of dummy for relation of quality of subcontractor to time performance : construction method, experience of subcontractor, ability in facet labour of quality and ability in levying of gaffer.

 File Digital: 1

Shelf
 Pengaruh kualitas - Full text ( T 17646 ) pdf.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T17646
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2006
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xiii, 85 hlm. : ill. ; 30 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Univeristas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T17646 15-19-561066209 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 102117