:: UI - Tesis Open :: Kembali

UI - Tesis Open :: Kembali

Perancangan Rencana Induk untuk Penerapan Total Productive Maintenance pada Fasilitas Pemeliharaan Landasan Pacu di Bandara Menggunakan Dasar Pengukuran Overall Equipment Effectiveness = Design of Master Plan for Total Productive Maintenance Implementation in Runway Maintenance Facility Using Overall Equipment Effectiveness Measurements

Iman Gelar Santika; Boy Nurtjahyo Moch., supervisor; Fauzia Dianawati, supervisor; Sri Bintang Pamungkas, 1945-, examiner; Yadrifil, examiner; M. Dachyar, examiner (Fakultas Teknik Universitas Indonesia, 2009)

 Abstrak

Total Productive Maintenance (TPM) sebagai program manajemen pemeliharaan telah terbukti nyata dengan penerapan yang luas dalam bidang manufaktur dapat meningkatkan produktivitas sehingga kegiatan pemeliharaan tidak lagi menjadi sumber pengeluaran biaya bagi perusahaan. Pertumbuhan industri penerbangan menarik minat pengelola bandara untuk menerapkan TPM dalam kegiatan pemeliharaan, sehingga diharapkan mampu meningkatkan produktivitas perusahaan terutama dengan penurunan biaya pemeliharaan, dengan tetap terpenuhinya standar keselamatan, keamanan dan kenyamanan bagi para pelanggannya. Penelitian ini dilakukan pada salah satu kegiatan utama yaitu pemeliharaan fasilitas landasan, dengan mengukur OEE (Overall Equipment effectiveness) dan produktivitas parsial bandara, analisanya merupakan masukan dalam perancangan penerapan TPM yang mengacu pada tahap persiapan, pelaksanaan awal, pelaksanaan' dan pemantapan. Hasil penelitian adalah rancangan rencana induk TPM yang dapat diterapkan pada jasa pengelolaan bandara khususnya fasilitas pemeliharaan landasan.

Total Productive Maintenance (TPM) as maintenance program has been proven by extensive implementation in manufacture sector in order to improve productivities so that maintenance activities are not as cost center for the company. Growth in aviation business attract airport authority to implement TPM in their maintenance activities to improve productivities most important to reduce maintenance cost but persistent in comply with safety, security and Service at its Standard level. Research is developed in runway maintenance as one of main airport maintenance aetivities are chosen. by measuring OEE (Overall Equipment Effectiveness) and airport partial productivity. the analysis are input for TPM implementation design which refer to preparation stage, preliminary implement stage. TPM implementation stage and stabilization stage. As result TPM master plan could implemented in airport maintenance activities to suppon airport business Service especially in runway maintenance facility.

 File Digital: 1

 Metadata

No. Panggil : T26166
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2009
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiv, 70 pages : illustration ; 28 cm
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T26166 15-23-97796252 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 122561