Tinjauan hukum terhadap klasula force majeure dalam energy sales contract antara PLN pertamina dan PT XYZ = Review law against clause force majeure of energy sales contract between PLN, Pertamina and PT XYZ.

Adrita; Suharnoko, supervisor (Fakultas Hukum Universitas Indonesia, 2011)

 Abstrak

Pengembangan energi panas bumi di Indonesia sebagai pembangkit energi listrik, sejak dijalankannya proyek PLTP Kamojang yang merupakan proyek gabungan antara PLN dan PERTAMINA. Energi panas bumi di Indonesia, memang sebagian besar digunakan untuk membangkitkan tenaga listrik, melalui Pembangkit Listrik Tenaga Panas Bumi (PLTP). Terkait dengan energi panas bumi ataupun energi listrik yang dihasilkan dari suatu PLTP, yang kemudian dijual kepada PERTAMINA selaku pemegang Kuasa Pengusahaan Panas Bumi, dan kemudian oleh PERTAMINA dijual kepada PLN selaku pemegang Kuasa Usaha Ketenagalistrikan, telah terjadi beberapa kasus di Indonesia yang sehubungan dengan adanya kontrak jual beli listrik panas bumi tersebut, yang mana yang menjadi pokok sengketa adalah klausula force majeure yang terdapat pada kontrak jual beli energi listrik tersebut. Penelitian ini berusaha memaparkan apakah klausula force majeure tersebut dapat dilaksanakan, dan perlindungan hukum apakah yang dapat diberikan kepada PLN dan PERTAMINA dalam hal dikeluarkannya Keputusan Presiden yang menangguhkan proyek PLTP terkait dengan suatu ESC.
Penelitian memaparkan ketentuan-ketentuan hukum dan peraturan perundang-undangan yang relevan terkait dengan ESC ini.Penelitian ini dari sudut jenisnya merupakan studi kepustakaan (Library Research) yang bersifat yuridis normatif, yaitu penelitian yang menekankan pada penggunaan data sekunder atau berupa norma hukum tertulis. Metode penelitian dilakukan secara kepustakaan yang bersifat yuridis normatif, dengan analisa data secara kualitatif, sehingga menghasilkan data yang bersifat evaluatif-analitis.

Geothermal energy development in Indonesia as electrical energy generation, since the executable Kamojang PLTP project which is a joint project between Pertamina and PLN. Geothermal energy in Indonesia, is mainly used to generate electricity, through a Geothermal Power Plant (PLTP). Associated with geothermal energy or electrical energy generated from a plant, which then was sold to Pertamina as a shareholder, Geothermal Power, and then by PERTAMINA is sold to PLN, as a shareholder Electricity Business Authority, there have been several cases in Indonesia in connection with the contract geothermal power purchase it, which is the subject of dispute is the force majeure clauses contained in the contract of sale of energy power plant.
The research is to explain whether the clauses of force majeure could be implemented, and whether legal protection can be provided to PLN and Pertamina in terms of suspending the issuance of Presidential Decree PLTP projects associated with the ESC key. The study describes the legal provisions and regulations of relevant legislation relating to ESC ini.Penelitian this from the point of its kind is the study of literature (Library Research) which is normative, that is research that emphasizes the use of secondary data or the form of written legal norms. Methods of research done in libraries that are normative, with the qualitative data analysis, resulting in data-analytical evaluative nature.

 File Digital: 1

 Metadata

No. Panggil : T28186
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Hukum Universitas Indonesia, 2011
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : x, 61 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T28186 15-18-377432415 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 136428