:: UI - Skripsi Open :: Kembali

UI - Skripsi Open :: Kembali

Identifikasi komposisi limbah konstruksi pembangunan struktur bangunan bertingkat tinggi: studi kasus: proyek pembangunan gedung DPRD dan balai kota DKI Jakarta dan proyek pembangunan tower tiffany kemang village

Pramesti Andiani; Djoko Hartanto, supervisor ([Publisher not identified] , 2011)

 Abstrak

Limbah konstruksi adalah puing-puing bangunan, tanah, beton, baja, kayu dan bahan-bahan campuran lainnya yang timbul dari berbagai kegiatan konstruksi. Penelitian ini dilakukan terhadap dua proyek yaitu Proyek Pembangunan Gedung DPRD dan Balaikota DKI Jakarta dan Proyek Pembangunan Tower Tiffany Kemang Village. Limbah yang di identifikasi komposisinya adalah tiga jenis limbah yang mendominasi pembangunan tahap struktur yaitu besi, kayu dan beton. Pada Proyek Pembangunan Gedung DPRD dan Balaikota DKI Jakarta jumlah limbah besi sebanyak 1,25% limbah kayu sebanyak 11,67%, limbah beton sisa cor sebanyak 7,43% dan limbah bobokan beton sebanyak 7,72%. Sedangkan pada Proyek Pembangunan Tower Tiffany Kemang Village limbah besi sebanyak 4,76%, kayu sebanyak 4,89%, kayu phenol film sebanyak 1,73%, limbah beton sisa cor sebanyak 2,91% dan limbah beton bobokan sebanyak 0,8%. Faktor utama penyebab terjadinya limbah konstruksi pada Proyek Pembangunan Gedung DPRD dan Balaikota DKI Jakarta adalah karena sisa pemotongan material menjadi panjang tertentu, limbah proses pengaplikasian dan limbah kemasan. Faktor utama penyebab terjadinya limbah konstruksi pada Proyek Pembangunan Tower Tiffany Kemang Village adalah karena kesalahan pada pekerja atau buruh, limbah proses pengaplikasian dan limbah kemasan.Limbah suatu proyek konstruksi tidak dapat dibandingkan dengan limbah proyek konstruksi lainnya karena perbedaan metode yang digunakan, fungsi bangunan, dan lain-lain. Solusi untuk mengurangi jumlah timbulan limbah konstruksi adalah dengan transparasi antar pihak yang terlibat dalam proyek.

Construction waste are debris, dirt, concrete, steel, wood and others as a result of construction activities. This research was conducted on two projects, DPRD and Balaikota DKI Jakarta construction project and Tower Tiffany Kemang Village Construction Project. The waste which identified were three kind of waste which dominated the construction of the building structure, the waste are steel, wood and concrete. At the DPRD and Balaikota DKI Jakarta project the amount of steel waste is 1,25 %, wood waste is 11,67%, concrete remainder is 4,3% and concrete residue after casting is 7,72%. Whereas at the construction of Tower Tiffany Kemang Village the amount of steel waste is 4,76%, wood waste is 4,89%, phenol film wood is 1,73%, concrete remainder 2,91% and concrete residue after casting is 0,8%. The main cause of construction waste at DPRD and Balaikota DKI Jakarta construction project is because of residue of cutting material, application process and pacakaging. Whereas the main cause of construction waste at Tower Tiffany Kemang Village project are because of error from the workers, application process and packaging. Waste of a construction project cannot be compared to other construction project because of the usage of different method, building function, etc. The solution to reduce the amount of construction waste is transparancy between all the stakeholder which involve in the project.

 File Digital: 1

 Metadata

No. Panggil : S99
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2011
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xvii, 105 hlm.; ill.; 30 cm
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S99 14-17-346330230 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20174573