Identifikasi faktor penyebab keterlambatan pelaksanaan yang berpengaruh terhadap cash flow pada proyek konstruksi gedung bertingkat. (Studi kasus : Proyek The Capital Residence) = Identifying the delaynesss cause factors that influence the cash flow of the high rise buildings construction project. (Case study : The Capital Residence Project)

Adelina Sapitri; Yusuf Latief, supervisor; Firdaus Jufri, examiner (Fakultas Teknik Universitas Indonesia, 2006)

 Abstrak

Globalisasi perdagangan dunia dan semua sektor industri termasuk industri konstruksi menyebabkan tingkat persaingan yang sangat tinggi dari para pelaku bisnis konstruksi. Ukuran proyek konstruksi terus tumbuh dan berkembang sehingga kontraktor dipaksa untuk selalu memperhatikan perencanaan dan pengendalian pembiayaannya. Keterlambatan Pelaksanaan yang terjadi pada proyek konstruksi sangat berhubungan erat dengan cash flow, untuk itu perlu dilakukan identifikasi faktor penyebab keterlambatan pelaksanaan yang berpengaruh terhadap cash flow pada suatu proyek agar pada periode selanjutnya dapat memperbaiki kinerja proyek dan mengatasi keterlambatan dengan cara yang efisien. Metode analisa yang digunakan untuk menguji variabel didalam penelitian ini adalah metode Analytical Hierarchy process (AHP), yaitu suatu metode yang digunakan untuk mencari faktor?faktor penyebab keterlambatan yang berpengaruh terhadap cash flow dengan memberikan peringkat/rangking dari hasil survey yang didapat. Dari hasil penelitian dan analisa yang dilakukan didapat faktor-faktor penyebab keterlambatan yang sangat berpengaruh terhadap cash flow, sedangkan penelitian terhadap Cash flow proyek dari studi kasus yang diambil pada Proyek The Capital Residence mengalami sedikit gangguan faktor internal kontraktor dan menyebabkan tertundanya waktu pelaksanaan proyek kurang lebih 5 bulan dari waktu pelaksanaan yang telah ditetapkan.

World trade globalization and all of sectors, including construction industry, cause a very keen competition between construction businessmen. The construction project becomes bigger and wider, so contractors are forced to be always aware in planning and managing the cost of the project. The delays that happens to the construction project is related so close to cash flow, There for we need to identificate the cause factors of delays that affect a project cash flow in order to improve project work and solve the problem of delayed efficiently. Analysis method that is used for examining variable in this observation is a Analytical Hierarchy process (AHP) method. The method are used to find cause factors of the delays that influence the cash flow by giving levels/ranks from survey result. The observation and the analysis show the cause factors of the delays that influence cash flow badly. In the other hand, the observation of project cash flow taken from case study of The Capital Residence project get a little internal trouble in contracting and cause delayed project application for about five months from time limit.

 File Digital: 1

Shelf
 S35862-Adelina Sapitri.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S35862
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2006
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xiv, 76 hlm. : ill. : 30 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S35862 14-21-59625385 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20239708