:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Perencanaan produksi berdasarkan metode activity-based costing dan theory of constraints di pabrik X PT. YZ

Veronika Widiarsy; Betrianis, supervisor (Fakultas Teknik Universitas Indonesia, 2003)

 Abstrak

Perencanaan produksi merupakan aspek penting yang hams diperhatikan oleh sebuah perusahaan rnanufaktun Walaupun demikian, rencana produksi yang disusun oleh perusahaan seringkali tidak beljalan densn nama theory of constraints (TOC) dapat Cligunakan untuk menyusun rencana produksi berdasarkan kendala.
Perencanaan produksi dimulai dengan mengidentifikasi kendaia yang dimiliki perusahaan Setelah itu, kendala dieksploitasi dengan cara menentukan produc! mb: yang optimal yang akan memaksimaikan keunlungan. Product mix yang optimal dapat ditentukan dengan menggunakan prograrna linier. Ketepatan hasil yang diperolch dari programa linier tergantung pada keakuratan input data yang meliputi data biaya produk. Inforrnasi biaya produk yang lebih akurat dapat diperoleh dengan nlenggunakan metode activity-based cosring (ABC).
Product mix yang optimal ini merupakan input bagi penyusunan jadwal produksi. Jadwal produksi disusun berdasarkan metode drum-buffer-rope (DBR)- Perencanaan produksi dilanjutkan dengan membuat suatu rencana koordinasi unluk mendulcung implementasi jadwai produksi yang telah djbuat. Dengan demikian perencanaan produksi yang dibuat dapat memberikan arahan bagi pelaksanaan kegiatan produksi dengan baik.

Production planning is important aspect that must be considered by a manufacturing company. However, it's often that the company's production plan doesn't work well. Thus, reducing the company's competitiveness in the globalization era. Production planning should consider restrictive bottlenecks of a company so that production activity that is implemented according to the plan may work well. A concept that is known as theory of constraints (TOC) can be used to make production plan based on bottlenecks.
Production planning starts with identifying bottlenecks of company. Then, bottlenecks are exploited by determining the optimal product mix that maximize company's profit. The optimal product mix can be determined with linear programming. The accuracy of linear programming's result depends on the accuracy of input, including product cost. More accuracy in product cost information can be obtained by applying activity-based costing (ABC) method.
This optimal product mix is input for production scheduling. Production scheduling is made according to drum-buffer-rope (DBR) method. Production planning is continued with a coordination plan to support the implementation of production schedule. Thus, production planning that has been made could give the right direction for production activity implementation.

 File Digital: 1

Shelf
 S50011-Veronika Widiarsy.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S50015
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2003
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xiii, 116 hlm. : ill. ; 30 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S50015 14-22-78644922 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20247761