:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Pengukuran nilai overall equipment effectiveness sebagai dasar usaha perbaikan proses manufaktur pada lini produksi. (Studi kasus: SPD PT. TMMIN)

Robby Suhendra; Betrianis, supervisor (Fakultas Teknik Universitas Indonesia, 2005)

 Abstrak

Overall Equipment Ejéctiveness (OBE) merupakan metode pengukuran efektivitas penggunaan peralatan dalam penerapan program T oral Produc-live Maintenance (TPM). Metode ini telah banyak diaplikasikan dalam proses manufaktur perusahaan yang berasal dad Negara Jepang, benua Eropa maupun Amerika. Kemampuan mengidentifikasikan secara jelas akar permasalahan dan faktor penyebabnya yang membuat usaha perbaikan menjadi terfokus merupakan faktor yang menjadikan metode ini diaplikasikan secara menyeluruh olch banyak perusahaan di dunia.
Proses manufaktur di Stamping Production Division PT. TMMIN masih menyimpan permasalahan yang belum terungkap jelas. Hal tersebut mcngakibatkan rendahnya pencapaian nilai OEE yang menggambarkan peralatan produksi yang ada belurn dimanfaatkan secara optimal.
Pengungkapan akar masalah dan faktor penyebabnya diperlukan sebelum perusahaan melakukan usaha perbaikan. Penelitian ini dimulai dengan memahami kerugian peralatan yang ada di SPD PT. TMMIN_ Kcmudian mengukur pencapaian nilai OBE satu Iini produksi dalam satu pedode dan melalui analisis parcto terhadap hasil pengukuran tersebut diperoleh akar pcrmasalahan dan faktor penyebabnya yang secara jelas ditampilkan pada diagram sebab-akibat.

Overall Equipment Effectiveness (OEE) is an effectiveness measurement method of equipment utilization in the implementation of Total Productive Maintenance (TPM) program. This method has been widely applied in the manufacturing process of the companies coming from Japanese country, Europe and even American continent. The ability of identification in details toward main problem and the cause factors that makes the improvement ejfort become more focused is the reason why this method applied comprehensively by ali manufacturing company around the world.
Manufacturing process at Stamping Production Division PII TMMIN stiii keeps some unrevealed problems. This condition makes the achievement of OEE figure beiow the target that means production equipments are not utilized optimatb: yet.
The expression of main problem and the cause factors is needed before the company starts some improvement ejforts. This research is started by understanding the equipment losses that existed in SPD PI TMMDV Then, measuring the achievement of OEE figinre in one period and through the pareto analysis toward the measurement 's results, the main problem and the cause factors are obtained and cieary depicted in cause-and-effect diagram.

 File Digital: 1

Shelf
 S50253-Robby Suhendra.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S50253
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2005
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xiv, 84 hlm. : ill. ; 30 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S50253 14-22-76307784 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20247860