:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Analisis risiko kelayakan investasi water park dengan simulasi Monte Carlo. Studi kasus: proyek Water Fun Park Sidoarjo

Hamundu, Ferdinand Murni; Boy Nurtjahyo Moch., supervisor (Fakultas Teknik Universitas Indonesia, 2006)

 Abstrak

Analisa kelayakan finansial dalam proyek investasi konstruksi Water Parks tidak cukup untuk memastikan proyek tersebut dapat dieksekusi. Hal tersebut dikarenakan kondisi pertimbangan saat ini tidak mungkin selalu sama dengan masa yang akan datang. Oleh karena itu keterlibatan analisa risiko sebagai input pendukung analisa kelayakan fmansial sangat penting keberadaannya. Sebagai tahap awal dalam analisa risiko diperlukan proses identifikasi risiko dengan melibatkan para pakar. Dari proses tersebut dapat diidentifikasi risiko-risiko yang kemungkinan teriadi dalam investasi Water Parks serta probabilitasnya masing-masing, dengan menggunakan metode Analitical Hierarchy Process (AHP). Sehingga diperoleh risiko yang paling besar adalah risiko suku bunga SBI dengan probabilitas 0.091. Dan sebagai tahap selanjutnya teknik analisa risiko adalah Simulasi Monte Carlo. Simulasi dengan bantuan perangkat lunak Crystall Ball 2000 ver. 5.2 melalui keterlibatan skenario risiko tarif masuk dan biaya pembebasan tanah, dan kemudian merandom faktor inflasi, tingkat suku bunga, potensial konsumen. Sehingga menghasilkan berbagai tingkat kelayakan untuk distribusi NPV dan IRR, antara lain probabilitas kelayakan NPV hampir 98%, dan probabilitas kelayakan IRR < MARR 14% senilai 8.60% ketika tarif masuk sesuai harapan investor dan tidak ada kenaikan biaya pembebasan tanah.

Feasibility study is not enough to make sure the investment project Water Park can be executed. It caused feasible input for the future is uncertainty. Therefore, incorporating risk analysis as supported input in feasible capital budgeting and investment is really important. First phase in risk analysis is identifying the risks by involve the expert. This phase has identified the risks and their likelihood of Water Parks Project, by Analytical Hierarchy Process (AHP) method. And the big risk is SBI rate as discounted rate risk with the likelihood of 0.091. And the next step to analyse the risk is use Monte Carlo simulation. Simulation with Crystal! Ball software ver. 5.2 regarding scenario of ticket price risks and land acquisition cost risk and then randomize of additional risk such as inflation rate, discount rate, potencial of consument. So that results several certainty level for NPV and IRR, for example 98% certainty level for NPV, and 8.60% certainty level for IRR < MARR 14% while the ticket price is suitable for investor and no added cost for the land acquisition.

 File Digital: 1

Shelf
 S50044-Ferdinand Murni Hamundu.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S50044
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2006
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xviii, 174 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S50044 14-22-00307292 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20247941