:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Analisis rencana tindakan penanganan dalam manajemen risiko proyek pembangunan menara telekomunikasi. (Studi kasus: PT. X) = Response planning analysis in project risk management of telecommunication tower construction. (Study case: PT X)

Maryono NB; M. Dachyar, supervisor (Fakultas Teknik Universitas Indonesia, 2007)

 Abstrak

Setiap proyek adalah penting. Setiap proyek pasti mempunyai risiko. Oleh karena itu, kita perlu mengelola risiko proyek dengan baik. Manajemen risiko telah menjadi bagian utama dari sebuah manajemen proyek. Dalam setiap aktivitas proyek terdapat beberapa risiko yang mempunyai probabilitas dan dampak yang berbeda-beda terhadap pencapaian tujuan proyek. Tim proyek diharapkan dapat mengidentifikasi risiko secara teliti pada setiap aktivitas proyek tersebut.
Salah satu metode yang dapat digunakan untuk mengidentifikasi risiko proyek adalah dengan mengidentifikasi dan mengelompokkan risiko berdasarkan Work Breakdown Structure (WBS). Melalui metode ini kita akan mengetahui risikorisiko yang terdapat pada setiap aktivitas proyek. Kemudian risiko yang teridentifikasi ini perlu diurutkan berdasarkan prioritas penanganan yang diperoleh dari matriks probabilitas - dampak risiko.
Pada umumnya, aktivitas dalam proyek mempunyai urutan pengerjaan yang menghubungkan suatu aktivtas dengan aktivitas lainnya, demikian halnya dengan risiko suatu aktivitas dalam proyek juga mungkin mempunyai keterkaitan dengan risiko pada aktivitas yang lain. Adanya keterkaitan ini memungkinkan sebuah tindakan penanganan risiko dapat sekaligus menangani beberapa risiko atau mempengaruhi risiko yang lain, sebaliknya sebuah risiko memungkinkan untuk ditangani dengan oleh berbagai tindakan penanganan risiko. Oleh karena itu, untuk memperoleh tindakan penanganan risiko yang efektif maka perlu dicari sumber risiko serta hubungan antar risiko melalui analisis keterkaitan risiko atau menggunakan diagram keterkaitan risiko.
Pada akhirnya, melalui analisis jalur kritis proyek serta pendekatan House of Quality (HOQ) dimana risiko merepresentasikan kebutuhan pelanggan dan tindakan penanganan risiko merepresentasikan tanggapan teknis maka akan diperoleh total bobot dari setiap alternatif tindakan penanganan yang akan menentukan prioritas tindakan penanganan yang akan dilakukan. Berdasarkan hasil analisis jalur kritis proyek serta pendekatan HOQ ini maka diperoleh 11 tindakan penanganan utama yang diurutkan berdasarkan prioritas untuk dipilih dan dilakukan.

Every single project is important. Every project has their own risks. That is why we have to manage project risk with great concern. Risk management has become a central part of project management. In every project activity we will find number of risks, each with different probabilities and severity levels prior to the achievement of the project?s goal. Project team is expected to be able to identify carefully and thoroughly every project activity.
One of the methods applicable in identifying project risk is by identifying and grouping project risks using Work Breakdown Structure (WBS). By using this method we can identify existing risks in every single project activity. The identified risks then will be needed to be ranked based on treatment priority list from the probability - severity matrix.
In general, every activity in a project lines in a sequence. This sequence places every activity in a relation with another activity. The condition of interrelated activities in the project leads the research to the possibility of the interrelating risks within different activities. This interrelationship might allow a risk treatment activity to deal with the treatment of more than one existing risks in the project. In contrast, a single risk might be treated by several risk action activities. In order to find the most effective treatment activities to apply to the project risks, the source of the risks along with the risks? interrelationship will need to be defined by using risk interrelationship analysis or risks - risk treatment activity alternatives interrelationship diagram.
Finally we can get a total weight of every treatment activity alternatives from the analysis of the project?s critical path combined with House of Quality (HOQ) approach where the risk represents customer?s needs and risk treatment activities represents technical response. The result will be a priority list that can be used to decide which treatment activities to be realized. Based on the project critical path analysis and the HOQ approach, this research came to the finding of 11 major treatment activities sorted by the priority to be chosen and taken.

 File Digital: 1

Shelf
 S50359-Maryono NB.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S50359
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2007
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xvi, 175 hlm. ; ill. ; 28 cm + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S50359 14-22-75506387 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20248012