Kajian studi kelayakan finansial dan skema pendanaan pada rencana pembangunan proyek multi purpose deep tunnel system di DKI Jakarta = Multi purpose deep tunnel system project development plan : analysis of feasibility study financing scheme in DKI Jakarta

Hendro Prayitno; Firdaus Ali, supervisor; Ismeth Abidin, supervisor (Fakultas Teknik Universitas Indonesia, 2008)

 Abstrak

Kompleksitas permasalahan lingkungan perkotaan yang terjadi di Jakarta seperti banjir, kemacetan lalulintas, pengelolaan limbah cair, dan kelangkaan air bersih yang terjadi pada akhir-akhir ini, menjadi perhatian serius pemerintah dalam menemukan jalan pemecahan. Alternatif solusi yang bersifat parsial dan dengan pendekatan sektoral yang selama ini diimplementasikan selalu gagal dan tidak berjalan dengan efektif. Selain menghabiskan biaya yang mahal, keterbatasan lahan merupakan kendala utama dalam realisasinya. Multi Purpose Deep Tunnel System (MPDT) merupakan solusi terintegrasi yang diharapkan mampu mengatasi berbagai permasalahn diatas, dan tidak membutuhkan pembebasan lahan.
Realisasi proyek ini membutuhkan dana yang sangat besar yang tentunya tidak dapat ditanggung sepenuhnya oleh pemerintah. Sehingga peranan dari private sector sangat diperlukan dalam rangka terealisasinya pembiayaan proyek infrastruktur multifungsi pertama di Indonesia. Namun, studi kelayakan finansial sebagai salah satu komponen dari proses feasibility study belum dilaksanakan sehingga tidak ada media yang mampu meyakinkan investor tentang kelayakan proyek ini. Oleh karena itu, skripsi ini bertujuan untuk melakukan kajian studi kelayakan finansial sehingga didapatkan skema pendanaan yang optimal buat investor maupun pemerintah. Dengan kajian terhadap studi kelayakan investasi yang menggunakan pendekatan finansial maka besar nilai IRR yang diperlukan dari proyek dapat digambarkan melalui analisa cash flow yang menampilkan suatu skema yang lebih optimal bagi penentuan alternatif usulan skema investasi yang memberikan manfaat tertinggi dan terbaik (high and best use).

Urban complexity problems in Jakarta concerning environment such as flood, traffic congestion, liquid waste management, and scarecity of fresh water, has requared serious attention for government to find best solution. There have been partial alternative and sectoral solution which so far failed to work effectively. Beside the need for large some of fund, limited area has been the main constraint of their realisation. Multi Purpose Deep Tunnel System (MPDT) is an integrated solution capable to solve the above problem, which not requare land acquisition.
This realisation of this project will needs a large funding that can't be the responsibility of the government alone. Private sector participation for funding the realization of this multifunction infrastructure project in Indonesia will be of great demand. An investigation of the financial feasibility is importan aspect to be carry out in order to provide the information to attract investor participation in the project. Therefore, this graduate thesis is aim to provide the needed condusive, and optimal financing schemes for thus effective investment and goverment participation in the future. The analisys alternative of financial scheme provided the range of high indictive IRR value needed for succesfull project implementation resulting high and best benefit for both investor and goverment in the future.

 File Digital: 1

 Metadata

No. Panggil : S35334
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2008
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xv, 119 hlm. : il. ; 30 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S35334 14-17-165849346 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20248306