:: UI - Skripsi Open :: Kembali

UI - Skripsi Open :: Kembali

Studi banding biaya pelaksanaan jembatan Teknik - Sastra dari struktur baja dan struktur beton = Study compare the expense of execution of bridge 'teknik-sastra' of steel structure and concrete structure

Erdityo Husodo; Bambang Setiadi, supervisor (Fakultas Teknik Universitas Indonesia, 2009)

 Abstrak

Dalam suatu proyek jembatan pemilihan jenis struktur dapat mempengaruhi biaya pelaksanaan dari pembuatan jembatan tersebut. Hal ini menjadi salah satu pertimbangan dalam perencanaan pembuatan jembatan berdasarkan budget yang dimiliki untuk membuat jembatan tersebut. Atas dasar itu penulis ingin mengetahui perbedaan biaya pelaksanaan Jembatan Teknik-Sastra yang terbuat dari struktur Baja (eksisting) dan struktur Beton.
Penelitian ini bertujuan untuk memahami dan mengetahui biaya pelaksanaan jembatan Teknik - Sastra apabila terbuat dari struktur beton serta dapat mengetahui jenis jembatan yang paling efektif & efisien bagi pelaksanaan proyek Metode penelitian yang dilakukan berupa studi kasusdengan mengumpulkan responden dalam bentuk observasi dan wawancara terhadap pihak-pihak yang terkait dan data yang diambil akan dianalisa dengan membuat perbandingan biaya pelaksanaan proyek antara pelaksanaan pekerjaan jembatan yang telah dilaksanakan sekarang (eksisting), dan pelaksanaan pekerjaan jembatan dengan struktur beton yang akan dibuat.
Dari hasil penelitian ini akan diketahui mana yang lebih murah antara harga konstruksi jembatan Teknik-Sastra dari struktur baja (eksisting) dan Struktur beton. Serta perbandingan harga jembatan Teknik-Sastra dari struktur beton apabila dikerjakan pada tahun 2007 dan dikerjakan pada tahun 2009.

In an bridge project election of structure type can influence the expense of execution of making of bridge. This matter become one of the consideration in the plan making of bridge pursuant to budget had to make the bridge. On the basis of that writer wish to know difference of expense execution of Bridge of Teknik-Sastra the madeness of Steel structure (eksisting) and Concrete structure.
This research aim to to comprehend and know the expense of execution of Technique bridge - Art if is made from concrete structure and also can know most effective bridge type & ad for for execution of conducted Method research project in the form of study of kasusdengan collect responder in the form of interview and observation to related/relevant partys and taken data will be analysed made comparison of expense execution of project between execution of work of bridge which have been executed now (eksisting), and execution of work of bridge with concrete structure to be made.
From this research result will know whichly is which is cheaper [among/between] bridge construction price of Teknik-Sastra of steel structure (eksisting) and Structure concrete. And also comparison of bridge price of Teknik-Sastra of concrete structure if done in the year 2007 and done in the year 2009.

 File Digital: 1

 Metadata

No. Panggil : S50525
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2009
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : ix, 49 hlm. : ill. ; 30 cm.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S50525 14-22-46847460 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20248469