Usulan perbikan bisnis proses pada divisi production engineering di industri otomotif dengan menggunakan pendekatan business process improvement = Business process improvement suggestion in production engineering division of the automotive industry by using business process improvement approach

Rini Padhilah; M. Dachyar, supervisor (Fakultas Teknik Universitas Indonesia;, 2009)

 Abstrak

Peningkatan persaingan dalam industri otomotif mengharuskan setiap perusahaan terus melakukan perbaikan terhadap proses bisnisnya untuk meningkatkan efisiensi dan efektifitas kinerja perusahaan. Aktifitas perbaikan dapat berjalan lancar apabila didukung oleh fasilitas yang memadai, salah satunya adalah fasilitas fisik pabrik. Production Engineering ( PE ) merupakan divisi yang ditugaskan untuk menangani proses pengadaan fasilitas fisik / bangunan di perusahaan otomotif tempat penelitian ini dilakukan.
Metode yang digunakan pada penelitian ini adalah Metode dari Adesola dan Baines yang menyatakan bahwa terdapat 7 tahap untuk memperbaiki proses. Karena keterbatasan kewenangan, penelitian dilakukan hanya sampai tahap merancang ulang proses. Perbaikan dilakukan dengan menggunakan pemetaan lalu dilakukan analisa untuk mencari penyebab permasalahan.
Kesimpulannya adalah penyebab keterlambatan karena 63% proyek mengalami keterlambatan pada saat memulai pekerjaan ( project start ). Usulan perbaikan yang diberikan untuk mengurangi dan menghilangkan kelemahan kelemahan proses yang diperoleh dari analisa diagram sebab akibat dan aktifitas yang tidak menambah nilai. Dari hasil perhitungan waktu proses dengan menggunakan Igrafx diperoleh persentase pengurangannya sebesar 35%.

The increasing of competition in automotive industry has forced every company to do a business process improvement in order to achieve higher effective and efficient company process. That improvement will be running well and if supported by appropriate facilities, one of them is plant facilities. Production Engineering (PE) is the division which has a responsibility to ensure of building facility construction in the company where this research done.
The method that will be used for business process improvement in this project is Adesola and Baines methods. Based on this method, there are seven main steps to improve any process. Due to the role/responsible limitation, this project only done until re-designs the process step. Improvement is done by using mapping process and then analyzing process to find the root of problems.
After doing overall project, we can conclude that the delay in completion of supplying of building material happened since 63% delay of projects start. Improvement suggestion for this process are reduce and eliminate the weakness of process that found from caused and effect diagram and non value added analyze. By using calculation Igrafx software, the percentage reducing of cycle time after improvement is about 35%.

 File Digital: 1

 Metadata

No. Panggil : S52322
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia;, 2009
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xiii, 66 hlm. : ill. ; 30 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S52322 14-22-77467753 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20250192