:: UI - Tesis Open :: Kembali

UI - Tesis Open :: Kembali

Usulan penentuan prioritas strategi menggunakan balance scorecard dan perencanaan six sigma pada PT. X. Jasa konstruksi = Recommendation of implementation balance scorecard and six sigma collaboration at PT X

Adjie Sudarmadji; Boy Nurtjahyo Moch., supervisor; Armand Omar Moeis, supervisor; Akhmad Hidayatno, examiner; Sri Bintang Pamungkas, 1945-, examiner; Yadrifil, examiner (Fakultas Teknik Universitas Indonesia, 2008)

 Abstrak

PT X adalah perusahaan Kontraktor umum yang mempunyai 3 unit bisnis Pekerjaan sipil, tata lingkungan, mekanikal dan elektrikal. Perusahaan menginginkan strategi-strategi yang dapat diimplementsi untuk meningkatkan kinerjanya dan metode yang efektif untuk mengimplentasi sasaran strategi tersebut PT X.Penelitian ini dilakukan dengan dua tahapan .Tahapan penelitian ini dimulai dengan melakukan pengukuran kinerja perusahaan dengan Kerangka Balance Scorecard dalam mengukur keseluruhan kinerja PT X. SWOT analisis (Streght, Weakness, Oportunity, Tthreat) untuk mengetahui keadaan perusahaan. Menyusun sasaran strategi di dalam kerangka Balance Scorecard. Setelah mendapatkan sasaran-sasaran strategi dengan kerangka Balance Scorecard, kemudian melakukan kuosioner terhadap responden karyawan yang berkaitan dengan pengolahan strategi PT X.Melakukan uji validitas dan reliabilitas alat ukur.
Inisiatif yang didapat dari peracangan Balance Scorecard adalah usaha mengimplementasikan Six Sigma agar claim pada produksi dredging menurun pada periode berikutnya.Six Sigma direncanakan menggunakan tahapan DMAIC (efine, Measure, Analysis, Improve, Control) yang berawal pada tahap Define menggunakan Diagram SIPOC, Pareto Chart, kemudian pada tahap Measure menggunakan pengukuran Kapabilitas Proses, tingkat Sigma DPMO, diteruskan dengan tahap analisis dengan Cause & Effect Diagram dan FMEA ( Failure Mode Effect Analysis) dan tahap Improve menggunakan rencana tindakan setelah hasil FMEA. Pada tahap control menggunakan control chart dan Poka Yoke (error proffing).

PT X is a General Contractor Company consists of three business division Civil, environment and, mechanical electrical. This Company want strategic which can implementation for improve their Performance and effective method for implementation that strategic.This research was done with two step, first step is company performance measurement with Balance Scorecard Frame for measurement all of company performance. SWOT Analysis (Strength, Weakness, Opportunity, Threat) for Company condition and gathering Company Strategies on Balance Scorecard Frame. After got company strategies is design of strategies priority decision questioner, design questioner involving personnel who got author for decision strategic at PT X. This Questioner gathering of personnel response strategic priority with Balance Scorecard frame. Questioner was done of reliable and validation test.
The result of Balance Scorecard design is initiative to implementation Six Sigma for unit out of specification minimizes in process dredging project. This Six Sigma planning using some tools first step is start from define: SIPOC ( Supplier, Input, Process, Customer), Pareto Chart, then Measure with Capability Process, DPMO, Sigma Level. Third phase is Analyze with Cause &Effect Diagram and FMEA, Improve phase using Action planning FMEA and end with Control chart and Poka Yoke( Error Proofing).

 File Digital: 1

 Metadata

No. Panggil : T41160
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2008
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiii, 136 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T41160 15-19-536269137 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20275533