Analisis pendanaan proyek PT. PLN (Persero) studi kasus pembangkit listrik tenaga uap (PLTU) Indramayu = Project financing analysis of PT. PLN (Persero) study case on Indramayu coal-fired power plant project

Wibisana Bagus Santosa; Ancella Anitawati Hermawan, supervisor; Siregar, Sylvia Veronica Nalurita Purnama, examiner; Eko Rizkianto, examiner (Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2012)

 Abstrak

Penelitian ini mengambil topik mengenai analisis pendanaan proyek PT. PLN (Persero) dengan studi kasus PLTU Indramayu. Penelitian ini bertujuan untuk menganalisis pengaruh perubahan makro ekonomi terhadap proyeksi arus kas pada saat studi kelayakan awal pada proyek, mengetahui alternatif pendanaan yang tepat untuk menutupi sisa pendanaan proyek, dan membuat program mitigasi risiko untuk meminimalisasikan risiko proyek. Pendanaan proyek sebesar ¥ 184,125.42 juta atau setara dengan 85,51% dari total biaya proyek menggunakan pendanaan yang bersumber dari pinjaman JICA. Hasil analisis pendanaan proyek mendapatkan proporsi sisa pendanaan proyek yaitu sebesar 14,49% atau setara dengan ¥ 31,211.63 juta didapatkan melalui pinjaman komersial perbankan. Berdasarkan komposisi pendanaan tersebut, WACC yang digunakan pada perhitungan project financing adalah sebesar 1,86%. Hasil perhitungan pre-appraisal PT. PLN (Persero) menunjukkan IRR dan NPV yang overvalued karena hasil perhitungan project financing pada proyek PLTU Indamayu menunjukkan IRR sebesar 5,25% dan NPV sebesar ¥ 99,616 juta. Sementara itu, hasil analisis program mitigasi risiko proyek PLTU Indramayu mendapatkan bahwa program mitigasi risiko keterlambatan proyek merupakan program mitigasi risiko proyek terpenting yang harus dijalankan untuk meminimalisasikan resiko keterlambatan pembangunan dan pengoperasian proyek PLTU Indramayu.

This study takes the topic of project funding analysis of PT. PLN (Persero) with Indramayu power plant case study. This study aims to analyze the impact of macroeconomic changes on cash flow projections at the time of the initial feasibility study on the project, find the right financing alternatives to cover the remaining project funding, and create risk mitigation program to minimize project risk. Project funding of ¥ 184,125.42 million, equivalent to 85.51% of total project costs using funding sourced from JICA loan. The results of the analysis of project funding to get the proportion of the remaining project funding that is equal to 14.49%, equivalent to ¥ 31,211.63 million loan obtained through commercial banks. Based on the composition of funding, the WACC used in the calculation of project financing amounted to 1.86%. The results of the calculations pre-appraisal of PT. PLN (Persero) shows the IRR and NPV calculations are overvalued as a result of project financing in the power plant project Indamayu shows an IRR of 5.25% and NPV of ¥ 99.616 million. Meanwhile, the results of analysis of risk mitigation programs Indramayu power plant projects found that project delays risk mitigation program is an important project risk mitigation program must run to minimize the risk of delays in the construction and operation of power plant projects Indramayu.

 File Digital: 1

 Metadata

No. Panggil : T30310
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Penerbitan : Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2012
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xvi, 100 Pages : illustration ; 28 cm
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T30310 15-18-076298637 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20299120