:: UI - Tesis Open :: Kembali

UI - Tesis Open :: Kembali

Model penjadwalan Job Shop mesin paralel dengan menggunakan metode Tabu Search

Krishtina Kumala Dewi; Isti Surjandari Prajitno, supervisor; Amar Rachman, supervisor; Arian Dhini, examiner; Erlinda Muslim, examiner; Akhmad Hidayatno, examiner; Boy Nurtjahyo Moch., examiner (Fakultas Teknik Universitas Indonesia, 2012)

 Abstrak

Agar dapat merespon permintaan pelanggan secara cepat perlu disiapkan sejumlah persediaan yang cukup besar, supaya tersedia pada saat dibutuhkan Penelitian ini mengembangkan model penjadwalan yang terdiri dari dua model. Model satu bertujuan melakukan penjadwalan untuk pemenuhan due date pada lingkungan Job Shop Paralel. Model dua bertujuan melakukan penjadwalan untuk penentuan due date. Pada sistem Job Shop Pararel dinamis yang memproses multi-item berstruktur multi-level, berdasarkan kinerja kualitas pada lingkungan produksi Just In Time (JIT). Pendekatan yang digunakan dalam penelitian ini adalah pendekatan mundur (backward approach) untuk pemenuhan due date dan pendekatan random untuk penentuan due date serta menggunakan metode Tabu Search dengan kriteria minimasi total actual flow time dengan memperhatikan tingkat cacat (defect rate) yang terjadi pada setiap tahapan proses yang dilalui. Peningkatan jumlah item dan jumlah level akan memberikan peningkatan jumlah alternatif jadwal yang berdampak pada CPU time yang diperlukan untuk mendapatkan solusi yang dapat memberikan total actual flow time yang minimum, namun dalam penelitian ini hanya terjadi untuk satu level multi item saja. Untuk dua level dan seterusnya tidak memberikan alternatif jadwal yang bervariasi untuk tingkatan item maupun level. Hal ini disebabkan karena inisialisasi solusi tetangga, panjang tabu list dan jumlah iterasi yang ditetapkan diawal membuat pencarian solusi berhenti di titik lokal optimum.

In order to response the demand from customer quickly, it needs to have a large size of inventory. This research developes two scheduling model. The first models is to fulfill the due date in the paralel job shop manufacturing and the second is to make the due date itself. In the dynamic paralel job shop system which is produce the multi item structured by multi level, according to the quality performance in the just in time manufacturing. The research uses the backward approach to fulfill the due date and the random approach to make the due date using Tabu Search Method which objective is to minimize total actual flow time concern on defect rate. The increase of item and level affect the increase of scheduling alternatif and cpu time, but in this research it only happens for one level and multi item. For two level and so on it doesn?t give any varians scheduling alternative for level or item invrease. It might becuase of the inisialisasion of neighboor, the lenght of tabu list and iteration which made in the beginning and it makes the solution stop at the optimum local search.

 File Digital: 1

 Metadata

No. Panggil : T30456
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2012
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xii, 64 pages : illustration ; 28 cm
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T30456 15-18-146352239 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20299785