:: UI - Tesis Open :: Kembali

UI - Tesis Open :: Kembali

Analisis Penyebab Keterlambatan Dimulainya Operasi Elektif Di Instalasi Kamar Bedah Rumah Sakit Otorita Batam = Analysis Causes Delay of Elective Surgery in Operation Room Installation Batam Authority Hospital

Muhammad Askar; Purnawan Junadi, supervisor; Sandi Iljanto, examiner; Mieke Savitri, examiner; Sumijatun, examiner; Yuli Prapancha Satar, examiner (Fakultas Kesehatan Masyarakat Universitas Indonesia, 2011)

 Abstrak

Pelayanan kamar Operasi merupakan salah satu bentuk pelayanan yang sangat mempengaruhi tampilan dan merupakan salah satu indikator pelayanan Rumah Sakit.Instalasi Kamar Bedah Rumah Sakit Otorita Batam terdiri dari empat ( 4 ) buah kamar operasi yang melayani operasi cito, dan operasi bedah elektif. Komplain dari pasien dan dari survey awal pada saat residensi di bulan September 2010 dari data buku register instalasi kamar bedah didapatkan 95,79% (205 operasi terlambat dimulai dari 214 operasi elektif yang telah dijadwalkan sebelumnya).
Penelitian ini bertujuan untuk menganalisa penyebab keterlambatan dimulainya operasi elektif di instalasi kamar bedah Rumah Sakit Otorita Batam,sehingga diharapkan menjadi masukan yang berarti bagi pihak manajemen Rumah sakit untuk mengelola Instalasi kamar bedah kedepannya. Penelitian ini adalah penelitian deskriptif dengan pendekatan kualitatif dan tidak bersifat intervensi. Hasil penelitian membuktikan bahwa 68% penyebab keterlambatan dimulainya operasi disebabkan oleh terlambatnya kedatangan operator.

Operating room service is one type of services that greatly affect the appearance and is one indicator Hospital appearance. Surgery Instalation Room Batam Authority Hospital consists of four (4) operating rooms that serve Cito surgery, and elective surgery. Complaints from patients and from the initial survey at the time of residency in September 2010 from the data register book installation of the operating room founded 95.79% (205 operations performed late in starting the operation of 214 elective operations previously scheduled).
This study aims to analyze the causes of delay in the commencement of elective surgery in the operating room installation Batam Authority Hospital, which is expected to be input which means the part of hospital management to manage the Installation of the operating room in the future.The study was a descriptive research approach is qualitative and no intervention. The research proves that 68% of the causes of delay in the commencement of operations caused by the delay in the arrival of the operator.

 File Digital: 1

 Metadata

No. Panggil : T31668
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2011
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xvi, 90 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T31668 15-18-114847477 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20308042