Analisis kelayakan investasi pembangunan SPBG: CNG di Jakarta Pusat dengan skenario percepatan = Investment feasibility analysis of CNG fueling station in central Jakarta under accelation scenario

Indah Prihastuti; Farizal, supervisor; Arian Dhini, examiner; Maya Arlini Puspasari, examiner; Sumarsono Sudarto, examiner (Fakultas Teknik Universitas Indonesia, 2012)

 Abstrak

ABSTRAK
Belum lama ini pemerintah kembali mengeluarkan kebijakan mengenai pembatan bahan bahan bakar (BBM) bersubsidi dan pengalihan BBM ke bahan bakar gas (BBG). Akibatnya kebutuhan akan SPBG CNG baru akan semakin tinggi karena diperkirakan jumlah kendaraan berbahan bakar gas alam (NGV) akan meningkat. Bila hanya mengandalkan pemerintah untuk investasi pendirian SPBG ini, maka akan terkendala oleh terbatasnya dana dari APBN, Hal ini membuat investasi dari investor swasta menjadi hal yang urgen. Namun sampai saat ini investor swasta yang berinvestasi dalam bisnis hilir migas ini masih sangat sedikit, Hal ini dikarenakan dikarenakan kekhewatiran investor untuk berinvestor dalam pembangunan SPBG yang tidak didasari dengan pengetahuan yang memadai mengenai kelayakan dari bisnis ini. Penelitian ini menganalisa kelayakan investasi pembangunan SPBG CNG dengan skenario percepatan menggunakan metode NPV, IRR, dan Payback period selanjutnya dilakukan analisis sensitivitas untuk mengetahui seberapa sensitif suatu keputusan terhadap perubahan variable-variable yang mempengaruhinya. Hasil penelitian menunjukan bahwa lokasi yang dianggap paling baik berdasarlkan nilai pemenuhan kriteria yang harus dipenuhi untuk pendirian SPBG adalah lokasi di Jalan Budi Utomo. Analisis kelayakan menunjukan bahwa pembangunan SPBG CNG di Jl. Budi Utomo dengan skenario percepatan dan permintaan worst case pun (hanya busway) layak untuk dilakukan dengan nilai NPV positif sebesar Rp. 4.929.489.648.

ABSTRACT
The goverment has recently re-isuued a policy on the restriction of fuel (BBM) subsidy and concerns of fuel to the Compressed Natural Gas (CNG) As a result, the need for new CNG Fueling Station will be higher because the estimated amount of Natural Gas Vehicles (AGV) will increase Just relying on the Goverment to invest in CNG Fueling Station, it is constrained by limited funding from APBN. This makes the invesment from private investors become urgent. However, investor concern to invest in CNG Fueling Station are not based on adequate knowledge. This study analyzes the feasibility of CNG Fueling Station investment under accelerating scenarios using NPV,IRR, and Payback Period followed by perfoming a sensitivity analysis. The results showed that the best locations which for establishing of fueling station in on Budi Utomo Street. Feasibility analysis shows that the station on Budi Utomo Street built with acceleration scenario is fasible even worst case demand (coming from Busway only) and the NPV is positive with Rp.4.929.489.648.

 File Digital: 1

 Metadata

No. Panggil : S43824
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2012
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiii, 86 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S43824 14-24-90952198 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20314277