Kebutuhan dan ketersediaan tenaga kerja terampil pada studi kasus konstruksi proyek X di Kabupaten Morowali, Sulawesi Tengah = Demand and supply of skilled labor for project X in Morowali Regency, Central Sulawesi

Yuni Asril Sani; Ismeth Abidin, supervisor; Yusuf Latief, supervisor; Mohammed Ali Berawi, examiner; Krisna Mochtar, examiner; Hari Gumuruh Soeparto, examiner (Universitas Indonesia, 2012)

 Abstrak

Nikel merupakan barang tambang penting terutama bagi industri pembuatan logam sehingga pembangunan pabrik pengolahannya sangat dibutuhkan. Tantangan yang dihadapi oleh proyek ini adalah kebutuhan dan ketersediaan tenaga kerja terampil. Tesis ini menjabarkan kesenjangan kebutuhan dan ketersediaan tenaga terampil pada proyek X serta mencakup wilayah potensi dan proses pemenuhan kebutuhannya melalui analissi kesenjangan dan strategi optimasi. Berdasarkan untuk proyek X diharapkan untuk proporsi tenaga kerja lokal mencukupi untuk kebutuhan proyek X namun untuk proporsi tenaga kerja regional tidak mencukupi dan harus didatangkan dari wilayah nasional. Untuk memenuhi kebutuhan tenaga kerja terampil prada proyek ini dibutuhkan proses perekrutan, pelatihan serta penilaian kinerja yang dilakukans ecara terstruktur dan baik secara berkala mulai dari sebelum proyek dimulai, saat proyek berlangsung dan akhir proyek hingga proyek yang akan datang.

Nickel is one of the key mineral in the world, especially for the industrial manufacture of metal so that its processing plant is needed. But the challenges faced by the project one of them is demand and supply of skilled labor for the project. This thesis describes the gap needs and availability of skilled labor on the project and covers an area of potential X and the process of fulfilling their needs through the gap analysis and optimization strategies. For these project, based on the expected proportion for local labor to meet the needs of the project X but for the proportion of the regional labor force is inadequate and must be imported from the national territory. To meet the needs of skilled manpower in this project required the hiring process, training and performance assessment in a structured from the beginning of the project,construction and the end of the project to future projects.

 File Digital: 1

 Metadata

No. Panggil : T31833
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Universitas Indonesia, 2012
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xv, 158 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T31833 15-19-253011711 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20315322