Analisis manfaat penerapan Getsudo pada pelaksanaan impementasi Engineering Change di PT. Astra Daihatsu Motor = Benefit analysis of the Getsudo Method Implementation during the Implementation phase of Engineering change at PT. Astra Daihatsu Motor

Dwi Usman Saputra; Nurmala, supervisor (Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2012)

 Abstrak

Skripsi ini membahas tentang perlu atau tidaknya sebuah improvement yang sudah dilaksanakan di PT. Astra Daihatsu Motor dilanjutkan mengingat setelah perbaikan pengintegrasian Getsudo dalam penanganan engineering change dilaksanakan pun keterlambatan tanggal implementasinya masih saja terjadi.
Secara spesifik tujuan dari penelitian ini adalah menganalisis apakah ada perbedaan yang signifikan antara jumlah keterlambatan engineering change sebelum penerapan Getsudo (tahun 2010) dan sesudah penerapan Getsudo (tahun 2011), selain itu juga menganalisis apakah ada perbedaan yang signifikan antara jumlah keterlambatan engineering change sesudah penerapan Getsudo pada tahun pertama (2011) dan pada tahun kedua (2012), serta mencari masukan perbaikan yang lain jika di ketahui perbaikan yang sudah dilakukan tidak bermanfaat bagi perusahaan.
Penelitian ini adalah penelitian kuantitatif dengan desain inferensial yang mana menggunakan uji statistik non parametrik mann whitney yang dipadukan dalam metode penelitian Six sigma.
Hasil penelitian menyarankan bahwa improvement tersebut harus tetap dilanjutkan karena secara signifikan berdampak positif dalam menekan keterlambatan dan membantu meningkatkan efisiensi produksi, selain itu juga kesadaran akan pentingnya aktivitas engineering change dari tiap-tiap departemen yang terlibat harus ditingkatkan, agar tujuan dari improvement yang sudah berjalan dapat sesuai dengan yang diharapkan.

The focus of this study whether important or not an improvement that was implemented in PT. Astra Daihatsu Motor to be continued considering after integration Getsudo implemented on the engineering change implementation handling, date of "in/out phase" delays still occur.
Specifically, the purpose of this study was to analyze whether there is a significant difference or not between the amount of delay before the application of engineering change Getsudo (in 2010) and after application of Getsudo (in 2011), also analyzing whether there is a significant difference or not between the amount of delay after the application of engineering change Getsudo in the first year (2011) and in the second year (2012), as well as seeking input other improvements if the improvements are already in the know do not benefit for the company.
The research is inferential quantitative research design which uses nonparametric statistical tests mann whitney combined in Six sigma research methods.
Results of the study suggest that such improvement should continue as a significant positive impact in reducing delays and help to improve production efficiency, but also awareness of the importance of engineering change activity of each of the departments involved should be increased, for the purpose of improvement which has been running can be as expected.

 File Digital: 1

 Metadata

No. Panggil : S-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2012
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xiii, 56 hlm. : ill. ; 30 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S-Pdf 14-22-23297993 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20320182