Studi efektifitas penerapan sistim manajemen keselamatan dan kesehatan kerja pada proyek konstruksi di PT Global Process Systems = Study effectiveness of implementation of occupational health and safety management systems on construction project at PT Global Process Systems / Samy Awaludin
Samy Awaludin;
Zulkifli Djunaidi, supervisor; Mila Tejamaya, examiner; Fatima Lestari, examiner; Devie Fitri Octaviani, examiner; Yuni Kusminanti, examiner
(Universitas Indonesia, 2013)
|
ABSTRAK Proyek adalah sekumpulan kegiatan yang dimaksudkan untuk mencapaihasil akhir tertentu yang cukup penting bagi kepentingan pihak manajemen.Proyek tersebut salah satunya meliputi proyek konstruksi. Proses pembangunanproyek konstruksi pada umumnya merupakan kegiatan yang banyak mengandungunsur bahaya. Masalah keselamatan dan kesehatan kerja (K3) secara umum diIndonesia masih sering terabaikan. Hal ini ditunjukkan dengan masih tingginyaangka kecelakaan kerja. Masalah umum mengenai K3 ini juga terjadi padapenyelenggaraan konstruksi. Tenaga kerja di sektor jasa konstruksi mencakupsekitar 7-8% dari jumlah tenaga kerja di seluruh sektor, dan menyumbang 6.45%dari PDB di Indonesia. Sektor jasa konstruksi adalah salah satu sektor yang palingberisiko terhadap kecelakaan kerja, disamping sektor utama lainnya yaitupertanian, perikanan, perkayuan, dan pertambangan. Tujuan penelitian ini adalahuntuk mengetahui faktor-faktor dari nilai-nilai efektifitas penerapan SMK3terhadap tingkat kecelakaan kerja di PT GPS Batam dan juga mengetahui tingkatefektifitas kinerja K3 di PT GPS Batam dan perbandingannya dengan stardarSMK3 yang dipakai oleh PT GPS Batam. Penelitian dilakukan denganmenggunakan metode kualitatif dengan pendekatan observasional, dilakukanverifikasi dan review ‘in depth’ terhadap tingkat pencapaian elemen-elemenSMK3. Identifikasi kesesuaian penerapan ini salah satunya adalah dengan caramelakukan suatu audit terhadap implementasi SMK3, hubungan antara tingkatpemenuhan program dan target di dalam leading indikator terhadap tingkatlagging indikator yang telah dicapai oleh PT GPS. Hasil penelitian menunjukkanpelaksanaan SMK3 berdasarkan elemen-elemen OHSAS 18001 telahdilaksanakan dengan sangat baik dengan tingkat pencapaian persentase kesesuaiansebesar 95%. Efektifitas implementasi SMK3 dengan pencapaian tingkat leadingindikator yang bersifat pencegahan telah berhasil menurunkan angka laggingindicator menjadi nol (0) untuk kategori MTI, RWI dan LTI pada periode tahun2011 dan 2012. ABSTRACT Project is some activities with the aim to get the outcome as targeted andthe result is important for the management. One of the project type is theConstruction project. The fabrication phase of the construction project in generalhas involving many various hazard in their processes. Occupational health andsafety problem in general in Indonesia is negligence quite often. It can shows bythe high accident rate in all sector. Labor in construction service has cover uparound 7-8% from the total labor in all sector and contribute around 6,45% ofPDB in Indonesia. Construction sector is one of the sector that having a highestrisk to the work accident, the other main sector such as agriculture, fishery,forestry and mining.This research has intention to identify and analyse the effectiveness ofimplementing the health and safety management system to the incident rate thatoccur at PT GPS Batam and also compare it to the OHSMS that has beenimplemented at PT GPS Batam. This result has been using a qualitative methodwith observational approach, to do verification and in depth review to theaccomplishment rate of the OHSMS elements. One of the way to identify thecompliances of implementation is conducting the audit to the OHSMSimplementation itself, correlation between the accomplishment rate of theprogram and target in leading indicator to the lagging indicator rate that has beenachieved by PT GPS. The result of this research has showing the implementationof OHSMS that base on OHSAS 18001 elements has been implemented very wellwith percentage of compliance achievement around 95%. Effectiveness ofOHSMS implementation with good leading indicator rate has been succeed inlowering lagging indicator rate become zero (0) for MTI, RWI and LTI categoryfor the year of 2011 and 2012 period. Verification of the audit result from theperformance of the effectiveness of the implementation could be seen from theperformance of the HSE departments in distinctive and performance of companyin general. |
T32651-Studi efektifitas.pdf :: Unduh
|
No. Panggil : | T32651 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Subjek : | |
Penerbitan : | [Place of publication not identified]: Universitas Indonesia, 2013 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xv, 152 pages : illustration ; 28 cm |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T32651 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20330087 |