Studi efektifitas penerapan sistim manajemen keselamatan dan kesehatan kerja pada proyek konstruksi di PT Global Process Systems = Study effectiveness of implementation of occupational health and safety management systems on construction project at PT Global Process Systems / Samy Awaludin

Samy Awaludin; Zulkifli Djunaidi, supervisor; Mila Tejamaya, examiner; Fatima Lestari, examiner; Devie Fitri Octaviani, examiner; Yuni Kusminanti, examiner (Universitas Indonesia, 2013)

 Abstrak

ABSTRAK
Proyek adalah sekumpulan kegiatan yang dimaksudkan untuk mencapai
hasil akhir tertentu yang cukup penting bagi kepentingan pihak manajemen.
Proyek tersebut salah satunya meliputi proyek konstruksi. Proses pembangunan
proyek konstruksi pada umumnya merupakan kegiatan yang banyak mengandung
unsur bahaya. Masalah keselamatan dan kesehatan kerja (K3) secara umum di
Indonesia masih sering terabaikan. Hal ini ditunjukkan dengan masih tingginya
angka kecelakaan kerja. Masalah umum mengenai K3 ini juga terjadi pada
penyelenggaraan konstruksi. Tenaga kerja di sektor jasa konstruksi mencakup
sekitar 7-8% dari jumlah tenaga kerja di seluruh sektor, dan menyumbang 6.45%
dari PDB di Indonesia. Sektor jasa konstruksi adalah salah satu sektor yang paling
berisiko terhadap kecelakaan kerja, disamping sektor utama lainnya yaitu
pertanian, perikanan, perkayuan, dan pertambangan. Tujuan penelitian ini adalah
untuk mengetahui faktor-faktor dari nilai-nilai efektifitas penerapan SMK3
terhadap tingkat kecelakaan kerja di PT GPS Batam dan juga mengetahui tingkat
efektifitas kinerja K3 di PT GPS Batam dan perbandingannya dengan stardar
SMK3 yang dipakai oleh PT GPS Batam. Penelitian dilakukan dengan
menggunakan metode kualitatif dengan pendekatan observasional, dilakukan
verifikasi dan review ‘in depth’ terhadap tingkat pencapaian elemen-elemen
SMK3. Identifikasi kesesuaian penerapan ini salah satunya adalah dengan cara
melakukan suatu audit terhadap implementasi SMK3, hubungan antara tingkat
pemenuhan program dan target di dalam leading indikator terhadap tingkat
lagging indikator yang telah dicapai oleh PT GPS. Hasil penelitian menunjukkan
pelaksanaan SMK3 berdasarkan elemen-elemen OHSAS 18001 telah
dilaksanakan dengan sangat baik dengan tingkat pencapaian persentase kesesuaian
sebesar 95%. Efektifitas implementasi SMK3 dengan pencapaian tingkat leading
indikator yang bersifat pencegahan telah berhasil menurunkan angka lagging
indicator menjadi nol (0) untuk kategori MTI, RWI dan LTI pada periode tahun
2011 dan 2012.

ABSTRACT
Project is some activities with the aim to get the outcome as targeted and
the result is important for the management. One of the project type is the
Construction project. The fabrication phase of the construction project in general
has involving many various hazard in their processes. Occupational health and
safety problem in general in Indonesia is negligence quite often. It can shows by
the high accident rate in all sector. Labor in construction service has cover up
around 7-8% from the total labor in all sector and contribute around 6,45% of
PDB in Indonesia. Construction sector is one of the sector that having a highest
risk to the work accident, the other main sector such as agriculture, fishery,
forestry and mining.
This research has intention to identify and analyse the effectiveness of
implementing the health and safety management system to the incident rate that
occur at PT GPS Batam and also compare it to the OHSMS that has been
implemented at PT GPS Batam. This result has been using a qualitative method
with observational approach, to do verification and in depth review to the
accomplishment rate of the OHSMS elements. One of the way to identify the
compliances of implementation is conducting the audit to the OHSMS
implementation itself, correlation between the accomplishment rate of the
program and target in leading indicator to the lagging indicator rate that has been
achieved by PT GPS. The result of this research has showing the implementation
of OHSMS that base on OHSAS 18001 elements has been implemented very well
with percentage of compliance achievement around 95%. Effectiveness of
OHSMS implementation with good leading indicator rate has been succeed in
lowering lagging indicator rate become zero (0) for MTI, RWI and LTI category
for the year of 2011 and 2012 period. Verification of the audit result from the
performance of the effectiveness of the implementation could be seen from the
performance of the HSE departments in distinctive and performance of company
in general.

 File Digital: 1

Shelf
 T32651-Studi efektifitas.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T32651
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : [Place of publication not identified]: Universitas Indonesia, 2013
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xv, 152 pages : illustration ; 28 cm
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T32651 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20330087