:: UI - Tugas Akhir :: Kembali

UI - Tugas Akhir :: Kembali

Perancangan business continuity plan BCP : studi kasus PT ABC = Designing business continuity plan : case study of PT ABC

Prabowo Priyo Ardhiatno; Achmad Nizar Hidayanto, supervisor (Fakultas Ilmu Komputer Universitas Indonesia, 2013)

 Abstrak

Jurnal ini membahas mengenai perancangan Business Continuity Plan (BCP) pada studi kasus PT. ABC. Kesulitan yang dialami oleh PT.ABC dalam mengimplementasikan sebuah program BCP menjadi latar belakang dari jurnal ini, yang disebabkan antara lain kurangnya komitmen manajemen, kurangnya pengetahuan SDM akan pengembangan program BCMS dan belum adanya standar pengembangan BCP khusus untuk industri konstruksi.
Pengembangan BCP dilakukan dengan menggunakan kerangka kerja generik dari BS 25999. Langkah-langkah pengembangan yang dilakukan mulai dari Risk Assessment, Business Impact Analysis (BIA), sampai dengan pengembangan BCP/DRP. Data diperoleh melalui analisis dokumen, wawancara maupun survei dengan pihak middle management yang dilakukan untuk mendapatkan pengetahuan mengenai risiko apa saja yang mungkin dihadapi, proses bisnis mana yang kritis untuk keberlangsungan organisasi, dan juga kualifikasi masing-masing Subject Matter Expert (SME).
Hasil dari penelitian ini adalah dokumen BCP berdasarkan BS 25999. Dari proses melakukan penelitian ini, diperoleh kesimpulan bahwa kunci untuk mendapatkan sebuah BCP yang sesuai dengan kebutuhan PT.ABC (maupun organisasi lainnya) adalah dengan melakukan proses pemahaman organisasi secara benar, melakukannya dengan runtut dan sesuai dengan batasan ruang lingkup yang sudah disepakati sebelumnya.

This paper is discussing the design of a Business Continuity Plan (BCP) in the case study PT. ABC. The background of this final project is the difficulties experienced by PT.ABC in implementing a BCP program. The difficulties is due to such a lack of Management commitment, lack of knowledge of BCMS program development and the absence of BCP development standards specific to the construction industry.
BCP Development is done using the generic framework of BCP in this case BS 25999. Development steps are done from Risk Assessment, Business Impact Analysis (BIA) all the way to the development of BCP/DRP. Data obtained through the analysis of documents, interviews and surveys with the middle Management. It done to gain knowledge about any risks that may be encountered, which Business processes are critical to the sustainability of the organization, and the qualifications of each Subject Matter Expert (SME).
The final result of this research is a BCP document based on BS 25999. During this study, it is concluded that the key to getting a BCP that fit the needs of PT.ABC (or other organizations) is to make the process of understanding the organization properly, do it coherently and in accordance with the scope limits that have been agreed in advance.

 File Digital: 1

Shelf
 TA-Prabowo Priyo Ardhiatno.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : TA-Pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Ilmu Komputer Universitas Indonesia, 2013
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xxxv, 197 hlm. : ill. ; 28 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
TA-Pdf 16-19-150795833 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20330291