Analisis manfaat dan biaya penyediaan infrastruktur listrik di Kawasan Timur Indonesia : studi kasus Kampung Arang Provinsi Gorontalo = Cost and benefit analysis of the provision of electricity infrastructure in Eastern Indonesia : case study Kampung Arang Gorontalo Province

Citra Eka Putri; Ayudha D. Prayoga, supervisor; Pribadi Setiyanto, examiner; Dewi Ratna Sjari M., examiner (Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2013)

 Abstrak

Penelitian ini dilatarbelakangi oleh hasil penelitian yang menyebutkan ada hubungan dua arah antara konsumsi tenaga listrik dengan pertumbuhan ekonomi suatu negara. Oleh karena itu infrastruktur listrik harus merata di seluruh kawasan di Indonesia bahkan di Kawasan Timur Indonesia (KTI) yang karakteristik ekonominya berskala kecil dan kondisi geografisnya berupa kepulauan. Untuk mencapai tujuan tersebut, dilakukan studi komparatif pada negara-negara yang karakteristik ekonomi dan geografisnya sama dengan KTI. Ditemukan bahwa PLTS merupakan pembangkit yang paling sesuai untuk diterapkan di KTI. Gorontalo kemudian dipilih menjadi daerah yang mewakili seluruh KTI. Dengan analisis manfaat dan biaya, proyek ini menghasilkan nilai FNPV sebesar 2,158 milyar rupiah dan ENVP sebesar 2,555 milyar rupiah dalam umur proyek 25 tahun. Disamping itu, manfaat ekonomi dari proyek ini juga cukup besar sehingga untuk dapat merealisasikan proyek ini dapat dilakukan subsidi berupa penyertaan modal pemerintah agar variabel tarif dapat dikontrol sesuai dengan kemampuan masyarakat.

This study was motivated by the result of research that says there are bidirectional causality between electricity consumption and economic growth. Therefore the electrical infrastructure must be evenly distributed across all region in Indonesia, even in Eastern Indonesia (KTI) which have small-scale of economic and scatter geographical condition. To achieve this objective, comparative studies conducted in countries whose economics and geographically similar to KTI. It was found that solar power is the most suitable to be applied in KTI. Gorontalo was chosen to be representative of the entire KTI regions. With cost and benefit analysis, the project is create 2.158 billion rupiah of FNVP and 2.555 billion rupiah of ENVP throughout 25 years project life. Economic benefits of the project was considered quite large, so that electricity rates can be controlled with government capital subsidy so that rates can be in accordance with the community's ability.

 File Digital: 1

Shelf
 S44330 Analisis manfaat.pdf :: Unduh

LOGIN required

 Kata Kunci

 Metadata

No. Panggil : S44330
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2013
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xvii, 132 pages : illustration ; 28 cm. + Appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S44330 14-19-540629590 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20331651