Analisis perbandingan investasi implementasi module 5B Returnable Rack (RR) Packaging Roundtrip terhadap Module 5B 1-Way Indonesia-Thailand dengan metode Total Cost of Ownership (TCO) di PT. Toyota Motor Manufacturing Indonesia = Comparative analysis of Returnable Rack Module Type 5B implementation to 1-way module Indonesia-Thailand using Total Cost of Ownership method in PT. Toyota Motor Manufacturing Indonesia
Soegeng Wijaya;
Yadrifil, supervisor
(Fakultas Teknik Universitas Indonesia, 2013)
|
Penelitian ini mendiskusikan sebuah studi analisis perbandingan logistik reverse dan logistik forward dari sudut pandang biaya sebuah module jenis 5B yang dimiliki oleh PT.TMMIN. Tujuan dari studi ini untuk membandingkan performance module returnable packaging 5 B RR terhadap module disposable 5B 1-Way yang digunakan oleh PT.TMMIN per satu unit modulenya dalam satu kali rotasi dan perbandingan investasinya selama 6 tahun untuk mengekspor komponen engine ke STM. Metode yang digunakan adalah dengan pendekatan total cost of ownership yaitu dengan melihat biaya-biaya relevan yang terkait dengan implementasi 1 unit module 5B RR dan 5B 1-Way. Hasilnya menunjukkan module 5B RR memiliki TCO 30 % lebih tinggi dibandingkan dengan TCO module 5B 1-Way. Hasil identifkasi biaya dengan pendekatan TCO kemudian dikombinasi dan dihitung dengan menggunakan analisis NPV selama 6 tahun untuk melihat kelayakan investasinya. Hasilnya membuktikan investasi module 5B RR bisa menghemat biaya hingga 50% dari investasi module 5B 1-Way. This research discusses a study of comparative analysis of reverse logistics and logistics forward from the viewpoint of costs a module type 5B owned by PT TMMIN The purpose of the study is to compare the performance module returnable packaging 5B RR of disposable module 5B 1 Way used by PT TMMIN per one unit of module in a single rotation and comparison of its investments over the last 6 years to export components engine to STM The method used is to approach the total cost of ownership that is by looking at the relevant costs associated with the implementation of unit module 5B RR and 5B 1 Way The results show module 5B RR have TCO 30 higher compared to the TCO module 5B 1 Way The result of cost identification with TCO approaching is combined and calculated using the NPV analysis for 6 years to see the feasibility of its investments The results prove the investment module 5B RR could save cost up to 50 of the investment module 5B 1 Way. |
S53030-Soegeng Wijaya.pdf :: Unduh
|
No. Panggil : | S53030 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Teknik Universitas Indonesia, 2013 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | |
Tipe Konten : | |
Tipe Media : | |
Tipe Carrier : | |
Deskripsi Fisik : | xiii, 85 hlm. ; 28 cm. + lamp. |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
S53030 | 14-20-405773045 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20348373 |