Studi jaminan kelancaran alir dan analisis biaya penggunaan jalur produksi tunggal untuk pengembangan lapangan gas laut dalam = Flow assurance and cost analysis study of single production line for deepwater gas field development / Muhammad Fida Helmi
Muhammad Fida Helmi;
Sutrasno Kartohardjono, supervisor; Mahmud Sudibandriyo, examiner; Dijan Supramono, examiner; Yuswan Muharam, examiner
([Publisher not identified]
, 2013)
|
ABSTRAK Penggunaan jalur produksi tunggal (single production line) akan diterapkan padaproyek pengembangan lapangan gas “A” yang berada di laut dalam. Pemakaianjalur produksi tunggal menghadapi tantangan yang berkaitan dengan kemampuanalir gas ketika operasional produksi dan pigging dilakukan. Saat piggingberlangsung, pig diluncurkan dengan hanya mengandalkan fluida gas dan tekanandari sumur saja. Potensi masalah yang mungkin terjadi adalah terbentuknya hidratdan aliran slug. Studi flow assurance dilakukan untuk mempelajari perilaku aliransaat operasi dan pigging berlangsung. Studi dilakukan pada kondisi steady state(tunak) dan transient untuk jalur produksi tunggal menghasilkan desain teknisjalur pipa dengan diameter 10” dan insulasi setebal 20 mm. Simulasi operasionalpigging menghasilkan strategi optimal berupa pengaturan laju alir 50 MMscfd dantekanan separator 80 bara sehingga dihasilkan kecepatan pig optimal 3.5 m/sselama 30 menit. Analisis biaya CAPEX dan OPEX memberikan penghematanbiaya penggunaan jalur produksi tunggal sebesar 57% dibandingkan dengan jalurproduksi ganda. ABSTRACT The use of a single production line will be applied to the deep water gasdevelopment project "A". The single production line face the challengesassociated with gas flow assurance when production and pigging operationsperformed. At pigging operation, pig propelled by simply relying on the pressurefrom the gas wells. The potential problem that might be occured is the formationof hydrates and slug flow. Flow assurance studies conducted to study the behaviorof gas flow and pigging operation. Studies conducted at steady state and transientfor a single production line result technical design of pipelines with a diameter of10" and 20 mm thick insulation. Pigging operation simulation results the optimalstrategy with the setting of flow rate: 50 MMscfd and pressure separator: 80 barato produce optimal speed 3.5 m / s of pig movement for 30 minutes. CAPEX andOPEX cost analysis provide cost savings using a single production line by 57%compared with double production lines. |
T35581-Muhammad Fida Helmi.pdf :: Unduh
|
No. Panggil : | T35581 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | [Place of publication not identified]: [Publisher not identified], 2013 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xii, 93 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T35581 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20348731 |