Penentuan harga listrik pada pembangkit listrik tenaga gas uap (PLTGU) dengan bahan bakar coal bed methane di Kalimantan Tengah = Electric price determination of combine cycel gas turbine power plant with coal bed methane fuel in Central Kalimantan
Fajar Gumilang;
Rinaldy Dalimi, supervisor; Rudy Setiabudy, examiner; Iwa Garniwa M.K., examiner; Eko Adhi Setiawan, examiner
(Fakultas Teknik Universitas Indonesia, 2013)
|
Potensi gas CBM di Kalimantan Tengah dapat digunakan sebagai pasokanbahan bakar pembangkit PLTGU namun belum adanya standarisasi harga jual gasCBM menyebabkan nilai keekonomian dari pembangkit berbahan bakar CBMperlu dikaji khususnya untuk harga produksi listrik yang cukup sensitif terhadapharga bahan bakar.Dalam perencanaan pengembangan pembangkit di Pulang PisauKalimantan Tengah akan dibangun pembangkit berkapasitas 2 x 60 MW, denganmemperhatikan produk pabrikan yang ada maka pembangkit yang dipilih adalahpembangkit berkapasitas 2 x 64 MW dengan total kapasitas 130,7 MW.Evaluasi pembangunan pembangkit PLTGU 130,7 MW dilakukan untukmenentukan harga produksi listrik dari kegiatan pembangkitan menggunakancadangan CBM yang ada. Evaluasi akan dilakukan dengan analisa sensitifitasharga listrik terhadap perubahan harga gas CBM dan nilai IRR. Harga listrik akandibandingkan dengan pembangkit PLTD, PLTU dan PLTGU Konvensional.Berdasarkan perhitungan dalam model finansial didapatkan kenaikan harga gas 1US$/Mmbtu, harga listrik akan naik 0,007 US$/KWh. Untuk harga gas CBM7US$/Mmbtu pada base case IRR sebesar 14% Interest Rate 10% didapatkanharga listrik PLTGU sebesar 0,083 US$/KWh.Pada kondisi base case harga listrik PLTGU dengan CBM mampubersaing dengan PLTD. Meskipun lebih rendah, harga listrik PLTU akan jauhmeningkat jika eksternalitas dimasukan dalam komponen biaya. Dan keterbatasanbahan bakar gas yang menyebabkan harga listrik PLTGU tinggi dapat ditekandengan memanfaatkan gas CBM sebagai bahan bakar alternatif. CBM gas potential in Central Kalimantan can be used as a combined cyclepower plant fuel supply, but the lack of standardization of CBM gas price led tothe economic value of the CBM-fired plants need to be studied in particular forthe production of electricity prices is quite sensitive to fuel prices.In planning the development of plants at Home Knives Central Kalimantanplant will be built with a capacity of 2 x 60 MW, taking into account themanufacturer's product then selected plants are plants with a capacity of 2 x 64MW with a total capacity of 130.7 MW.Evaluation of 130,7 MW Combined Cycle Power Plant construction isdone to determine the price of electricity production from generation activitiesusing existing CBM reserves. Evaluation will be conducted with sensitivityanalysis to changes in electricity prices CBM gas prices and the value of IRR.Electricity prices will be compared with diesel generators, combined cycle powerplant and Conventional. Based on the calculation of the financial model obtainedgas price increase 1 U.S. $ / MMBTU, electricity prices will go up 0.007 U.S. $ /kWh. For CBM gas price 7US $ / MMBtu in the base case IRR of 14% InterestRate 10% Combined Cycle Power Plant electricity prices obtained for 0.083 U.S.$ / kWh.In the base case conditions with CBM CCGT electricity prices competitivewith diesel. Although lower, the price at the plant will be much improved ifexternalities are included in the cost components. And limitations of the fuel gascombined cycle causing high electricity prices could be reduced by utilizing theCBM gas as an alternative fuel. |
![]()
|
No. Panggil : | T35518 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Teknik Universitas Indonesia, 2013 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xviii, 81 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T35518 | 15-23-52213774 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20349859 |