Evaluasi perhitungan kebutuhan pendanaan untuk kegiatan operasional berkelanjutan PT. MRT Jakarta menggunakan finansial modeling dan sistem dinamis = funding needs evaluation of PT. MRT Jakarta for aquiring sustainable operational by using combination of financial Modeling and System Dynamics. / Tyonardo Cahayadi
Tyonardo Cahayadi;
Akhmad Hidayatno, supervisor; Farizal, examiner; Dendy Ishak, examiner; Romadhani Ardi, examiner
([Publisher not identified]
, 2012)
|
[ABSTRAK Jakarta merupakan salah satu kota terpadat di dunia dan mengalami kerugianbesar akibat kemacetan. Untuk itu dilakukan studi untuk mengatasi kemacetanyang bernama The Study on Integrated Transportation Master Plan forJABODETABEK (SITRAMP). Salah satu solusi yang ditawarkan pada SITRAMPadalah pengadaan MRT jalur Kota-Ciputat. Dengan selesainya studi BasicEngineering Design untuk fase konstruksi, PT. MRT Jakarta perlu untukmelakukan perhitungan potensi pendapatan yang dapat diraih terkait rancangandesain konstruksi stasiun yang akan dilakukan. Penggunaan kombinasi darifinansial modeling dan sistem dinamis mampu untuk memetakan variable yangterdapat pada bisnis MRT dan membantu menemukan variable penting gunamemaksimalkan profitabilitas dari PT. MRT Jakarta.; ABSTRACT Jakarta is one of the most dense city in the world that encounter huge loss becauseof traffic jam. Meanwhile there is a study called SITRAMP by Japan InternationalCooperation Agency (JICA), The Study on Integrated Transportation Master Planfor JABODETABEK to solve the traffic problem. One of the solution that offeredin SITRAMP is construction of MRT line from Kota to Ciputat. While, the BasicEngineering Design for construction phase has finished, and PT. MRT Jakarta hasto do a study for calculating potency for revenue in their business related to theirstation design. Using combination of Financial Modeling and System Dynamics,variable mapping on MRT business environment can be done in order tomaximize PT, MRT Jakarta profitability., Jakarta is one of the most dense city in the world that encounter huge loss becauseof traffic jam. Meanwhile there is a study called SITRAMP by Japan InternationalCooperation Agency (JICA), The Study on Integrated Transportation Master Planfor JABODETABEK to solve the traffic problem. One of the solution that offeredin SITRAMP is construction of MRT line from Kota to Ciputat. While, the BasicEngineering Design for construction phase has finished, and PT. MRT Jakarta hasto do a study for calculating potency for revenue in their business related to theirstation design. Using combination of Financial Modeling and System Dynamics,variable mapping on MRT business environment can be done in order tomaximize PT, MRT Jakarta profitability.] |
![]() |
No. Panggil : | S45688 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Penerbitan : | [Place of publication not identified]: [Publisher not identified], 2012 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xi, 84 pages ; illustration ; 30 cm |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
S45688 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20353385 |