Analisa yuridis perjanjian kerjasama operasi dan pemeliharaan PT IP dengan PT CDB dalam pengoperasian pltu 10000 mw terkait uu no 13 tahun 2003 tentang ketenagakerjaan dan peraturan menteri nomor 19 tahun 2012 = Analysis juridical cooperation treaty operation and maintenance pt IP with pt in the CDB 10000 mw power plant operation related law 13 of 2003 on employment and ministerial regulation no 19 year 2012

Nasution, Hari Muhardani; Aloysius Uwiyono, supervisor; Akhmad Budi Cahyono, examiner; Abdul Salam, supervisor (Universitas Indonesia, 2014)

 Abstrak

Krisis Energi Listrik di Indonesia ditandai dengan seringnya pemadaman bergilir di sebagian besar wilayah negeri ini khususnya daerah di luar pulau Jawa Situasi tersebut menuntut PLN sebagai Badan Usaha Milik Negara yang mengelola ketenagalistrikan di Indonesia mengambil langkah langkah strategis untuk segera mengurangi bahkan menghapus kondisi krisis energi listrik Untuk itu PLN menetapkan langkah strategis Program Percepatan Diversifikasi Energi PPDE 10 000MW yakni dengan membangun pembangkit listrik baru guna menutupi kekurangan pasokan listrik yang terjadi di tanah air Selain pemenuhan tuntutan atas defisit energi PLN Grup juga mendapat tantangan efisiensi biaya PLN dituntut untuk dapat mengoperasikan pembangkit listrik yang dimilikinya dengan Low Cost meskipun harga listrik di Indonesia tidak lebih mahal dibandingkan negara negara tetangga PLN harus mampu setidaknya memproduksi listrik dengan biaya yang lebih rendah dari biaya yang selama ini dikeluarkan PLN dan hal ini mendorong PLN untuk melakukan beberapa perubahan strategi bisnis dalam pengoperasian dan pemeliharaan pembangkit listrik yang dimilikinya Penelitian ini bertujuan untuk mendeskripsikan secara analitis tentang mekanisme Outsourcing yang dituangkan dalam Perjanjian Kerjasama Pengoperasian dan Pemeliharaan Pembangkit Listrik Tenaga Uap program PPDE 10 000MW Berdasarkan hasil penelitian diketahui bahwa 1 Mekanisme Perjanjian Operasi dan Pemeliharaan PLTU Tahap Supporting antara PT IP dan PT CDB telah memenuhi syarat syarat yang diatur oleh Undang undang 13 Tahun 2003 tentang Ketenagakerjaan dan Kepmen 19 tahun 2012 Tentang Syarat syarat Penyerahan Sebagian Pelaksanaan Pekerjaan Kepada Perusahaan Lain 2 Dengan analisa keuangan biaya dalam pengoperasian PLTU 10 000MW khususnya biaya Kepegawaian menunjukkan bahwa skema kontrak OM dalam Pengelolaan Pembangkit Listrik Program 10 000MW tersebut telah memenuhi tuntutan efisiensi dan efektifitas

Power and energy shortage in Indonesia is marked by frequently power cuts in most of Indonesian cities especially outside Jawa island This situation has demanded PLN to take strategic steps through electrification acceleration program known as the 10 000 megawatt MW fast track program The program is to build new power plant to cover the power shortage Furthermore PLN has to deal with in cost efficiency PLN must reduce their cost to operate power plants with low cost It also requires several change in PLN rsquo s business strategies especially in operation and maintenance of power plants Purpose of this research is to describe the outsourcing mechanism in Agreement of Operation and Maintenance Steam Power Plant of 10 000 MW Fast Track Program 10 000MW Steam Power Plat Operation dan Maintenance Agreement Researcher comes to conclusion 1 Agreement of Operation and Maintenance Steam Power Plant of 10 000 MW Fast Track Program between PT IP and PT CDB comply with Law Number 13 Year 2013 concerning Labor and Ministerial Decree No 19 Year 2012 2 analysis of personnel cost in operational of 10 000 MW coal fired steam power plant has proven that Agreement of Operation and Maintenance Steam Power Plant of 10 000 MW Fast Track Program is efficient and effective.

 File Digital: 1

Shelf
 T39353-Hari Muhardani Nasution.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T39353
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Universitas Indonesia, 2014
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : x, 59 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T39353 15-20-458929295 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20365091