Usulan penerapan activity-based budgeting system dalam penyusunan anggaran pada Kantor Pelayanan Perbendaharaan Negara Kementerian Keuangan Republik Indonesia (tudi kasus pada KPPN Bandung I) = The proposed implementation of activity based budgeting system in the preparation of the budget at state Treasury Office Ministry of Finance of the Republic of Indonesia (case study on Bandung I) state treasury office / Mahatmyastuti Nuranindita
Mahatmyastuti Nuranindita;
Thomas Honggo Secokusumo, examiner; Gede Harja Wasistha, examiner; Lindawati Gani, examiner
(Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2014)
|
ABSTRAK Penelitian ini bertujuan untuk menyusun alokasi anggaran yang dibutuhkan dalammenghasilkan output layanan KPPN dengan menerapkan sistem Activity-BasedBudgeting yang berlandaskan pada model Time-Driven Activity-Based Costing,serta untuk mengetahui efektivitas dan efisiensi dalam Rencana Kerja Anggaranyang akan dihasilkan dengan menerapkan sistem ini. Penelitian dilakukan denganstudi kasus pada KPPN Bandung I sebagai unit instansi vertikal DitjenPerbendaharaan di wilayah Provinsi Jawa Barat.Metode yang digunakan dalam penelitian ini adalah metode kualitatif denganmengumpulkan data-data primer dan sekunder melalui wawancara dan observasilangsung pada objek penelitian, serta diperoleh dari database sistem informasimaupun pertinggal dokumen yang ada di KPPN Bandung I. Data-data yangdiperoleh kemudian diolah dan dianalisis sesuai dengan studi literatur mengenaipenerapan Activity-Based Budgeting System, khususnya di instansi pemerintahyang menjalankan kegiatan pelayanan kepada publik.Hasil dari penelitian ini menunjukkan bahwa masih terdapat kekurangan jumlahpegawai dalam menjalankan serangkaian aktivitas utama untuk menghasilkanoutput layanan sesuai dengan standar prosedur operasi yang telah ditetapkan danvolume output yang ditargetkan pada tahun 2014. Hal ini menyebabkan jumlahanggaran yang dibutuhkan pada tahun mendatang meningkat jumlahnya sebesar13,47% dari jumlah anggaran pada tahun 2013. Meskipun terdapat peningkatananggaran, namun Rencana Kerja Anggaran KPPN Bandung I tahun 2014 telahcukup efektif karena telah mencakup sebagian besar sasaran strategis yangditetapkan untuk KPPN dalam Peta Strategi dan Balanced Scorecard. Anggaranini juga akan lebih efisien, karena jumlah biaya yang dianggarkan benar-benardisesuaikan dengan kebutuhan kapasitas sumber daya dalam menjalankanaktivitas pelayanan kepada publik, sesuai dengan tugas pokok dan fungsi KPPN. ABSTRACT The purpose of this study is to develop the required budget allocation ingenerating output of services of the State Treasury Office (STO) by implementingActivity-Based Budgeting System based on the model of Time-Driven Activity-Based Costing, as well as to determine the effectiveness and efficiency of theBudget Work Plan that will be generated by applying this system. The study wascarried out by conducting a case study on Bandung I STOs as a vertical institutionof Directorate General of Treasury in West Java region.The method used in this study is a qualitative method by collecting primary andsecondary data through interviews and direct observation on the research object,as well as retrieved from the information system?s database and documentsarchives at Bandung I STOs. The data obtained were then processed and analyzedin accordance with the study of literature on the implementation of Activity-BasedBudgeting System, especially in the government institutions running publicservice activities.The results of this study indicate that there is still a shortage of skilled employeesto run a series of major activities in generating output of services, in accordancewith the standard operating precedures defined and targeted output volume in2014. This shortage will cause the total budget needed in coming year increased innumber by 13,47% compared to the total budget in 2013. Although there is anincrease in budget, but the 2014 Budget Work Plan of Bandung I STOs have beenquite effective, because it has already included most of the strategic objectives setfor the STO in the Strategy Map and Balanced Scorecard. This budget will also bemore efficient, because the amount of budgeted costs completely customized tothe needs of resource capacity in carrying out activities of service to the public, inaccordance with the duties and functions of the State Treasury Office. |
T55434-Mahatmyastuti Nuranindita.pdf :: Unduh
|
No. Panggil : | T55434 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | Jakarta: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2014 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xvi, 205 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T55434 | 15-21-924016780 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20365152 |