Analisa life cycle cost pada konseptual desain prasti (public railways and stormwater infrastructure) tunnel menggunakan pendekatan value engineering = Life cycle cost analysis for conceptal design prasti public railways and stormwater infrastructure tunnel using value engineering / Novi Julpah

Novi Julpah; Mohammed Ali Berawi, supervisor; Wahyu Utomo, supervisor; Bambang Susantono, supervisor; R. Jachrizal Sumabrata, examiner; Enoh Suharto, examiner ([Publisher not identified] , 2013)

 Abstrak

ABSTRAK
Kompleksitas permasalahan yang terjadi di Jakarta saat ini memerlukan penanganan yang serius dari pemerintah. Salah satu permasalahan yang paling krusial saat ini adalah permasalahan banjir. Upaya yang dapat dilakukan untuk mengatasi masalah tersebut adalah dengan melakukan pembangunan Infrastruktur pengendali Banjir, dalam hal ini Tunnel Pengendali Banjir. Namun adanya keterbatasan dana pemerintah, maka perlu adanya upaya yang inovatif untuk dapat menyelesaikan tidak hanya permasalahan banjir namun juga permasalahan lain di Jakarta. Berdasarkan analisa fungsi dalam metode Value Engineering, diperoleh suatu upaya inovatif utuk menyelesaikannya antara lain dengan membangun PRASTI Tunnel. PRASTI Tunnel merupakan Tunnel pengendali Banjir yang terintegrasi dengan Kereta Api Bandara, MRT serta pengembangan Telekomunikasi. Berdasarkan hasil perhitungan nilai yanga dibutuhkan untuk membangun PRASTI Tunnel adalah sekitar Rp 22 Triliun,. Dengan adanya subsidi pemerintah sebesar Rp 7,5 Triliun maka secara Finansial proyek ini cukup layak dengan nilai IRR sebesar 7,29 %.

ABSTRACT
The complexity of The issues raised in Jakarta today requires serious treatment from The government. One of The most crucial issue today is The problem of flooding. Efforts should be made to resolve The problem with The constructing of flood control infrastructure. However,we know our government have a limited funding for infrastructre. So we need some innovation, to resolve The problem. Based on Function Analysis from Value Engineerngstudy, we get some innovation to integrated Stormwater Management with Airport rail link and MRT System on One Tunnel. This Infrastructure concept, name’s PRASTI Tunnel. Based on Financial analysis, to developed PRASTI Tunnel it’s needed 22 Trillion Rupiah. With The government subsidy about Rp 7.5T PRASTI Tunnel would result IRR 7.29%.

 File Digital: 1

Shelf
 T42308-Novi Julpah.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T42308
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2013
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xxiii, 175 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T42308 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20365385