Aplikasi penjadwalan linear scheduling dengan pendekatan multi objective genetic optimization menggunakan software evolver pada pembangunan breakwater di Pelabuhan Kalibaru = Application of linear scheduling method with multi objective genetic optimization approach using evolver software in breakwater Kalibaru port construction/ Melani Syafridhal

Melani Syafridhal; Yusuf Latief, supervisor; Rully Andhika, supervisor; Setyo Supriyadi Sipadi, examiner; Petroceany, Jade Sjafrecia, examiner ([Publisher not identified] , 2014)

 Abstrak

ABSTRAK
Breakwater adalah bangunan penahan gelombang yang memiliki karakteristik pekerjaan yang bersifat repetitif dalam volume yang besar. Karakteristik dari proyek ini menuntut perencana untuk membuat suatu metode perencanaan penjadwalan yang berbeda dari bentuk metode biasa seperti CPM dan bar chart, dimana metode ini tidak cocok untuk penjadwalan pekerjaan yang repetitif. Metode penjadwalan yang cocok untuk digunakan dalam pembangunan proyek yang bersifat repetitif ialah metode penjadwalan linier. Penelitian ini bertujuan untuk mengaplikasikan metode penjadwalan linier dengan pendekatan multi-objective genetic optimization menggunakan software Evolver pada pembangunan breakwater di Pelabuhan Kalibaru. Pengoptimalisasian ditinjau dari segi jumlah tim pekerja dan total interupsi pekerjaan yang akan meminimalisasikan total durasi dan biaya proyek. Setelah dilakukan pengaplikasian dengan menggunakan metode ini, terjadi penurunan durasi sebesar 31,79% dan penurunan biaya sebesar 3,04%. Metode ini dapat digunakan dalam pengaplikasian dan pengoptimalisasian pembangunan breakwater di Pelabuhan Kalibaru.

ABSTRACT
Breakwater is a wave barrier building which has the characteristic of repetitive work in large volume of activities. Characteristics of this project requires planners to make a method of scheduling that is different from the usual form of scheduling method such as CPM and bar chart, where this method is not suitable for scheduling repetitive work. The scheduling method that suitable for repetitive construction project is linear scheduling method.This study aims to apply the linear scheduling method with multi-objective genetic optimization approach using Evolver software in breakwater Kalibaru Port construction. Optimizing in terms number of crew and total work interuption that will minimize total project duration and cost. After the application of this method, there is a decrease in duration of 31,79% and an impairment charge of 3,04%. This method can be used in application and optimization breakwater Kalibaru Port construction.

 File Digital: 1

Shelf
 S56036-Melani Syafridhal.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S56036
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2014
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; Computer (rdadontent)
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiii, 113 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S56036 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20386306