:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Analisa risiko investasi pembangunan kilang minyak mini dengan skema build operate transfer bot = Risk analysis of mini refinery construction investment by using build operate transfer bot scheme / Yoyok Setyo Purwanto

Yoyok Setyo Purwanto; Eddy Subiyanto, supervisor; Krishna Mochtar, supervisor; Yusuf Latief, examiner; Setyo Supriyadi Sipadi, examiner; Ayomi Dita Rarasati, examiner (Fakultas Teknik Universitas Indonesia, 2014)

 Abstrak

ABSTRAK
Konsumsi BBM yang meningkat rata-rata 5.6% per tahun tidak diimbangi dengan
penambahan jumlah kilang minyak di Indonesia. 40% BBM yang dikonsumsi
adalah produk impor. Pembangunan kilang minyak mini cocok untuk kebanyakan
lapangan minyak di Indonesia, terpencil dan marginal. Hambatan investasi proyek
yang besar disiasati dengan skema build operate transfer (BOT). Penulisan ini
untuk mengetahui faktor-faktor risiko yang paling berpengaruh terhadap kinerja
investasi proyek BOT kilang minyak mini dan mengetahui respon risiko yang
tepat terhadap risiko-risiko dominan tersebut. Penelitian dilakukan dengan
mengumpulkan data melalui survei kuesioner dan validasi pakar. Selanjutnya
diolah secara statistik menggunakan software SPSS dan analisa risiko kualitatif
dengan diagram matrik. Hasil penelitian menunjukkan adanya faktor-faktor risiko
dominan yang mempengaruhi kinerja investasi proyek BOT pembangunan kilang
minyak mini.

ABSTRACT
Average fuel consumption increased 5.6% per year is not offset by addition of an
oil refinery in Indonesia. 40% of fuel consumed is imported. Mini refinery
(modular) construction suitable for most of oil field in Indonesia that remote and
marginalized. Barriers large investment of the project to be handled by the scheme
build operate transfer (BOT). This study aimed to determine the risk factors that
most affect to the investment performance of BOT project modular refinery and to
know the appropriate risk response against the dominant risks. The study was
conducted by collecting data through a questionnaire survey and expert validation.
Furthermore, statistically processed using SPSS and qualitative risk analysis using
matrix diagram. The results showed there are dominant risk factors that affect to
the investment performance of BOT project modular mini refinery construction

 File Digital: 1

Shelf
 T41952-Yoyok Setyo Purwanto.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T41952
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Penerbitan : Jakarta: Fakultas Teknik Universitas Indonesia, 2014
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; Computer (rdadontent)
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xi, 169 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T41952 15-23-02626219 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20388826