Pengaruh penerapan sistem manajemen mutu dan manajemen keselamatan terintegrasi terhadap ketepatan waktu pelaksanaan pekerjaan konstruksi bagi kontraktor di Wilayah Jabodetabek = Implementation effect of integrated quality management and safety management system to execution timeliness of construction work for contractors in Jabodetabek region
Eddy Chandra;
Krishna Mochtar, supervisor; Lilik Sumarliadi, supervisor; Yusuf Latief, examiner; Wisnu Isvara, examiner; Alin Veronika, examiner
(Fakultas Teknik Universitas Indonesia, 2014)
|
[ABSTRAK Tesis ini membahas pengaruh penerapan sistem manajemen mutu dan manajemenkeselamatan terintegrasi, terhadap ketepatan waktu pelaksanaan pekerjaankonstruksi bagi kontraktor yang berada di wilayah jabodetabek. Penelitian iniadalah penelitian kuantitatif dengan jenis penelitian berupa survei. Hasilpenelitian menemukan bahwa kelengkapan dokumen perencanaan proyek,pemahaman kontraktor akan dokumen QS, kesadaran pekerja akan QS, sertafasilitas dan alat penunjang kegiatan QS dalam suatu penerapan sistemmanajemen mutu dan keselamatan yang terintegrasi secara serentak memberikanpengaruh sebesar 77.6% terhadap waktu pelaksanaan pekerjaan. ABSTRACT This thesis are reviewing the implementation effect of the integrated qualityManagement and safety Management System to execution timeliness ofconstruction work for contractor at the Jabodetabek Region. This research is aquantitative study with a type of survey research. The results found that thecompleteness of project planning documents, contractor understanding to QSdocuments, awareness of workers to QS, as well as facilities and supporting toolsto QS activities within an application of integrates quality and safetyManagement System gave impact of 77.6 % to the execution time job;This thesis are reviewing the implementation effect of the integrated qualityManagement and safety Management System to execution timeliness ofconstruction work for contractor at the Jabodetabek Region. This research is aquantitative study with a type of survey research. The results found that thecompleteness of project planning documents, contractor understanding to QSdocuments, awareness of workers to QS, as well as facilities and supporting toolsto QS activities within an application of integrates quality and safetyManagement System gave impact of 77.6 % to the execution time job, This thesis are reviewing the implementation effect of the integrated qualityManagement and safety Management System to execution timeliness ofconstruction work for contractor at the Jabodetabek Region. This research is aquantitative study with a type of survey research. The results found that thecompleteness of project planning documents, contractor understanding to QSdocuments, awareness of workers to QS, as well as facilities and supporting toolsto QS activities within an application of integrates quality and safetyManagement System gave impact of 77.6 % to the execution time job] |
T42615-Eddy Chandra.pdf :: Unduh
|
No. Panggil : | T42615 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | Jakarta: Fakultas Teknik Universitas Indonesia, 2014 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xiv, 120 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T42615 | 15-17-526955490 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20390190 |