Analisa penerapan sistem manajemen mutu pada pelaksanaan konstruksi dermaga oleh kontraktor = Analysis of the implementation of the quality management system at the dock construction by contractors
Simamora, Vega Dinata Partogi;
Krishna Mochtar, supervisor; Desi Arryani, supervisor; Yusuf Latief, examiner; Eddy Subiyanto, examiner; Petroceany, Jade Sjafrecia, examiner
(Fakultas Teknik Universitas Indonesia, 2014)
|
[ABSTRAK Pengertian mutu dalam konteks industri jasa konstruksi dapat didefinisikanmelalui berbagai pendekatan, tetapi pada prinsipnya adalah conformance torequirement, yaitu hasil yang dikerjakan sesuai dengan apa yang disyaratkan.Dalam penelitian ini bertujuan untuk mengidentifikasi faktor-faktor apa saja yangberpengaruh terhadap pencapaian mutu pekerjaan konstruksi dermaga yangdikerjakan oleh kontraktor khususnya sesuai dengan standard sistem manajemenmutu ISO 9001:2008. Penelitian dilaksanakan dengan mengumpulkan datamelalui survey kuesioner dan kemudian data diolah dengan metode statistikdengan menggunakan analisis korelasi dan analisis regresi serta uji model denganbantuan program SPSS 21.0. Hasil penelitian akan menunjukkan hubungan antaravariabel bebas yaitu faktor-faktor yang mempengaruhi penerapan sistemmanajemen mutu pada pelaksanaan konstruksi dermaga oleh kontraktor (X),terhadap pencapaian mutu proyek dermaga (Y), dan selanjutnya mengidentifikasiperistiwa yang terkait dengan penerapan sistem manajemen mutu oleh kontraktorpelaksana konstruksi dermaga. ABSTRACT The definition of quality in the context of the construction industry can be definedthrough a variety of approaches, but the principle is conformance to requirements,which results done in accordance with what is required. In this study aims toidentify the factors that influence the achievement of the quality of the pierconstruction work done by a contractor, especially in accordance with thestandards of ISO 9001:2008 quality management system. The research wasconducted by collecting data through a survey questionnaire and then the data isprocessed by the statistical method by using correlation analysis and regressionanalysis and model test with SPSS 21.0. The results of the study will show therelationship between the independent variables that affect the implementation ofquality management systems in the construction dock by the contractors (X), tothe achievement of the quality of the pier project (Y), and further identify theoccurence associated with the implementation of quality management system bythe contractors.;The definition of quality in the context of the construction industry can be definedthrough a variety of approaches, but the principle is conformance to requirements,which results done in accordance with what is required. In this study aims toidentify the factors that influence the achievement of the quality of the pierconstruction work done by a contractor, especially in accordance with thestandards of ISO 9001:2008 quality management system. The research wasconducted by collecting data through a survey questionnaire and then the data isprocessed by the statistical method by using correlation analysis and regressionanalysis and model test with SPSS 21.0. The results of the study will show therelationship between the independent variables that affect the implementation ofquality management systems in the construction dock by the contractors (X), tothe achievement of the quality of the pier project (Y), and further identify theoccurence associated with the implementation of quality management system bythe contractors., The definition of quality in the context of the construction industry can be definedthrough a variety of approaches, but the principle is conformance to requirements,which results done in accordance with what is required. In this study aims toidentify the factors that influence the achievement of the quality of the pierconstruction work done by a contractor, especially in accordance with thestandards of ISO 9001:2008 quality management system. The research wasconducted by collecting data through a survey questionnaire and then the data isprocessed by the statistical method by using correlation analysis and regressionanalysis and model test with SPSS 21.0. The results of the study will show therelationship between the independent variables that affect the implementation ofquality management systems in the construction dock by the contractors (X), tothe achievement of the quality of the pier project (Y), and further identify theoccurence associated with the implementation of quality management system bythe contractors.] |
![]()
|
No. Panggil : | T42616 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Entri tambahan-Nama badan : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Teknik Universitas Indonesia, 2014 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xx, 184 pages : illustration ; 28 cm + appendiix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T42616 | 15-17-076669861 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20390341 |