Aplikasi penjadwalan linear scheduling dengan stochastic linear scheduling method pada proyek pembangunan breakwater di pelabuhan kalibaru = Application of linear scheduling method with stochastic linear scheduling method case study on breakwater construction project at kalibaru port / Rio Novalrio

Rio Novalrio; Yusuf Latief, supervisor; Rully Andhika, supervisor; Setyo Suprijadi, examiner; Petroceany, Jade Sjafrecia, examiner (Fakultas Teknik Universitas Indonesia, 2014)

 Abstrak

ABSTRAK
Penerapan Linear Scheduling Method (LSM) dilakukan pada proyek dengan kegiatan berulang/repetitif, seperi pembangunan breakwater Pelabuhan Kalibaru. Pendekatan digunakan dalam penelitian ini adalah Stochastic Linear Scheduling Method yang merupakan integrasi LSM dengan mengedepankan data fakta produktivitas dan penerapan simulasi komputer. Simulasi prediksi dari data produktivitas antar aktivitas menggunakan perangkat lunak Crystal ball dengan berbagai metode dengan hasil grafik perkiraan kinerja akan datang pada masing-masing aktivitas. Selanjutnya, akan dihasilkan grafik dari LSM sesuai dengan perkiraan akan datang, sehingga dapat ditentukan seberapa jauh pergeseran penjadwalan proyek breakwater pada masing-masing aktivitas dari penjadwalan eksisting dengan prediksi penjadwalan akan datang.

ABSTRACT
Application of Linear Scheduling Method (LSM) was performed on projects with repetitive activities, are like Kalibaru Port breakwater construction. The approach used in this study is the Stochastic Linear Scheduling Method which is an LSM with the advanced integration of data facts and the application of computer simulation productivity. Simulation predictions of productivity data between activities using Crystal Ball software with a variety of methods to estimate the performance results chart will come in each activity. Furthermore, the graph will be generated according to the estimates of the LSM will come, so it can be determined how far the accuracy of scheduling breakwater project in each of the activities with the existing scheduling scheduling predictions will come.

 File Digital: 1

Shelf
 S54837-Rio Novalrio.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S54837
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : [Place of publication not identified]: Fakultas Teknik Universitas Indonesia, 2014
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xv, 106 pages : illustration ; 28 cm
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S54837 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20390398