Deskripsi Lengkap

Sumber Pengatalogan : LibUI eng rda
Tipe Konten : text (rdacontent)
Tipe Media : computer (rdamedia)
Tipe Pembawa : online resource (rdacarrier)
Deskripsi Fisik : xviii, 310 pages : illustration
Tautan : http://link.springer.com/book/10.1007%2F978-3-642-40438-2
Lembaga Pemilik :
Lokasi :
 
  •  Ketersediaan
  •  File Digital: 1
  •  Ulasan
  •  Sampul
  •  Abstrak
No. Panggil No. Barkod Ketersediaan
e20397216 20-25-63792976 TERSEDIA
Tidak ada ulasan pada koleksi ini: 20397216
 Abstrak
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling : the construction of a baseline schedule and the analysis of a project schedule?s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project?s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on.