Analisis dampak risiko investasi proyek pembangunan sistem penyediaan air minum wilayah Kota Bekasi dengan menggunakan project risk management = Risk impact analysis on investment for drinking water supply system development project in Bekasi using project risk management

Benita Dian Purnamasari; Armand Omar Moeis, supervisor (Fakultas Teknik Universitas Indonesia, 2014)

 Abstrak

Kondisi saat ini, cakupan layanan air PDAM Kota Bekasi masih sangat rendah hanya 27 persen dari total rumah tangga. Berdasarkan kondisi tersebut, pemerintah Kota Bekasi saat ini mengembangkan proyek Sistem Penyediaan Air Minum. Tujuan dari pengembangan Sistem Penyediaan Air Minum di Kota Bekasi untuk mendukung aktivitas berkaitan dengan edukasi, ekonomi lokal, pemerintah dan kegiatan lain yang mengarah dalam kebutuhan pelayanan air minum. Pembangunan Sistem Penyediaan Air Minum membutuhkan biaya investasi yang tinggi sehingga diperlukan analisis berbasis risiko untuk mengurangi kegagalan proyek, terutama dari segi aspek finansial.
Penelitian ini dilakukan dengan menggunakan metode Project Risk Management untuk menghitung dampak risiko terhadap investasi. Output penelitian berupa model risiko finansial yang kemudian dianalisa untuk disusun rekomendasi Risk Response Planning berupa keputusan alternatif untuk menghindari, memitigasi atau pun menerima risiko yang akan terjadi.

The existing condition of water service coverage of the district drinking water companies (PDAMs) Bekasi Municipal is very low with only 27 percent of the total household. According to this condition, Bekasi Municipal Government is currently developing a Drinking Water Supply project. The purpose of Drinking Water Supply System Development in Bekasi Municipal is to support activities of education, local economic, government and other activities which lead to enhance need of water services. The construction of water supply system requires a high investment costs which then resulted in the need of risk-based analysis to reduce of failure in financial aspects of the project.
The study was conducted by using Project Risk Management method to calculate the impact of risks in project investment. The output of the research is a financial risk model which is then analyzed to develop a risk responses planning which provides an alternative decision whether to avoid, mitigate, or accept the risks that might occur.

 File Digital: 1

Shelf
 S57227-Benita Dian Purnamasari.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S57227
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2014
Program Studi :
Bahasa : ind
Sumber Pengatalogan :
Tipe Konten :
Tipe Media :
Tipe Carrier :
Deskripsi Fisik : xiv, 86 hlm. : il. ; 28 cm. + lamp.
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S57227 14-22-85318637 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20402242