Analisa manajemen operasional pada pembangunan kapal tunda (TUGBOAT) 2x1600 hp di galangan kapal = Analysis of operational management on building of (TUGBOAT) 2x1600 hp at shipyard

Hutapea, Peter Kolbert; Agus Sunjarianto Pamitran, supervisor; Sunaryo, supervisor (Fakultas Teknik Universitas Indonesia, 2015)

 Abstrak

Manajemen operasional merupakan hal yang sangat penting dan tidak boleh diabaikan dalam suatu industri galangan kapal. Pengembangan dan penyusunan model pada manajemen risiko akan dilakukan agar pembangunan kapal lebih efisien dalam segi waktu dan juga biaya. Langkah yang dilakukan dalam melakukan manajemen risiko tersebut adalah dengan cara melakukan konsep IIAR yaitu: (1) Identification, melakukan identifikasi yaitu identifikasi lokasi, waktu, sebab, dan proses terjadinya peristiwa risiko yang dapat menghalangi, menurunkan, menunda, atau meningkatkan tercapainya pekerjaan di galangan tersebut; (2) Inventory of data,melakukan pengumpulan data yang mendukung dalam pengidentifikasian segala risiko yang ada, mulai pada saat penyerahan dokumen rancangan dari owner hingga pada saat kapal ereksi (erection); (3)
Analyze (assessment) adalah melakukan analisa diantaranya dengan cara schedule risk menggunakan pendekatan model matematis, analisis yang dilakukan dengan pengurangan schedule risk pada management proyek, menggunakan database, menggunakan cost risk dan schedule risk dalam analisis risiko; dan (4) Result atau hasil yang didapat setelah melakukan penilaian risiko, peringkat risiko, identifikasi peringkat risiko, dan pengontrolan risiko yang termasuk mitigasi risiko di dalamnya.

Operational management is very important and should not be ignored in a shipbuilding industry. Development and modeling in risk management should be applied to make the construction of vessel is more efficient in terms of time and costs. the first step in the risk management is concepting IIAR: (1) Identification, is identifying of the location, time, cause, and the process of the happen of risk that may block, degrade, delay, or increase the aim of work in the shipyards; (2) Inventory of the data, perform of collecting data that supports the identification of all the risks that exist, starting at the submission of the draft document from the owner until the ship erection; (3)
Analyze (assessment) is analyzing by schedule risk using a mathematical model approach, the analysis conducted by the reduction of schedule risk on project management, using the databases, using cost risk and schedule risk in the risk analysis; and (4) Result, is the results obtained after conducting a risk assessment, risk ratio, identification of risk rating, and control risks including risk mitigation.

 File Digital: 1

Shelf
 S58613-Peter Kolbert Hutapea.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : S58613
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2015
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiv, 74 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S58613 14-18-374015077 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20402758