:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Identifikasi penerapan manajemen rantai pasok pada fase pengadaan di proyek epc (engineering procurement construction) = Identification of supply chain management implementation on procurement phase in epc project / Artina Sanadia Banjarnahor

Banjarnahor, Artina Sanadia; Leni Sagita Riantini, supervisor; Alin Veronika, supervisor; Ayomi Dita Rarasati, examiner; Setyo Supriyadi Sipadi, examiner ([Publisher not identified] , 2015)

 Abstrak

ABSTRAK
Pada proyek EPC, fase pengadaan memiliki porsi biaya yang cukup besar yaitu sekitar 50-60% dari total biaya proyek. Penggunaan sebagian besar dari total biaya pada proyek untuk pengadaan peralatan dan material menjadi suatu hal yang krusial pada proyek EPC. Salah satu cara untuk meminimalisir kesalahan pada fase pengadaan adalah dengan menerapkan manajemen rantai pasok (supply chain). Pengukuran tingkat penerapannya dilakukan untuk mengevaluasi penerapannya di setiap proyek, sehingga pada proyek selanjutnya, penerapannya dapat ditingkatkan. Kuesioner disebarkan kepada karyawan di bagian pengadaan untuk menilai penerapan manajemen rantai pasok, kemudian dianalisis dengan uji normalitas, uji homogenitas, uji validitas, uji reliabilitas, dan statistik deskriptif. Diperoleh hasil bahwa meskipun terbilang baru, penerapan manajemen rantai pasok sudah cukup baik di Indonesia.

ABSTRACT
On EPC projects, procurement phase has quite big portion of cost which is around 50-60% of the total cost of a project. Most of this portion is used to procure equipments and materials. This becomes a crucial thing on EPC project. One of the ways to reduce the mistakes on procurement phase is to apply supply chain management. The purpose of the measurement is to evaluate and improve the application for the next project. Questionnaires are given to employees in procurement phase, then the data will be analyzed with normality test, homogenity test, validity and reliability test, and descriptive analysis. The result is that eventhough this kind of management is new in construction industry, the application in Indonesia is quite good in some EPC constructor.

 File Digital: 1

Shelf
 S59753-Artina Sanadia B.pdf :: Unduh

 Metadata

No. Panggil : S59753
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2015
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; Computer (rdadontent)
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiv, 100 pages : 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S59753 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20411400