Penyempurnaan perawatan bucket cylinder pada excavator kapasitas 20 ton dengan metode pmo2000 dan rca = Maintenance improvement of bucket cylinder in a 20 ton capacity excavator using pmo2000 and rca methods / Haswin Atmadi Hardjoprakoso Mangkoesoebroto
Haswin Atmadi Hardjoprakoso Mangkoesoebroto;
Yudan Whulanza, supervisor; Warjito, examiner; Sugeng Supriadi, supervisor
(Fakultas Teknik Universitas Indonesia, 2014)
|
[Zaman kini banyak merek alat berat yang ditawarkan di Indonesia. Agartetap bisa bersaing, para distributor harus memberikan kualitas produk terbaikdengan cara yang paling efisien biaya. Telah ditemukan bahwa pada excavatorberkapasitas 20 ton, bagian yang paling sering mengalami kegagalan adalahbucket cylinder. Kegagalan menyebabkan berkurangnya efisiensi atau bahkandown time, yang akan mengakibatkan peningkatan biaya. Menyempurnakanprogram perawatan untuk bucket cylinder adalah salah satu cara untukmengurangi biaya, sehingga tetap bisa bersaing.Dalam kasus ini, metode PMO2000 bisa digunakan untuk membuatprogram perawatan yang baru untuk bucket cylinder. Pertama, program perawatansaat ini beserta data kegagalan harus disusun terlebih dahulu. Lalu metode RCAdigunakan untuk mencari sumber penyebab, yang nantinya akan digunakan untukmenentukan kegagalan apa saja yang belum ada di program perawatan saat ini.Analisa resiko lalu digunakan untuk menentukan prioritas kegagalan tersebut.Pada akhirnya, PMO2000 bisa menghasilkan program perawatan yang barudimana semua masalah ditanggulangi, dan juga memberikan tugas perawatanuntuk kemungkinan kegagalan dengan resiko tinggi., Nowadays many heavy machineries brand in Indonesia are offered. Inorder to keep being competitive, distributor has to give the best possible quality ofa product in a most cost efficient way. It is found that in a 20 ton capacityexcavator, Bucket Cylinder is one of the parts that suffer frequently from failure.Failure causes loss of efficiency or even downtime, which increases overall cost.Improving the maintenance program of the bucket cylinder is one way to reducedoverall cost, thus keeping in the competition.In this case, the PMO2000 can be used to design a new maintenanceprogram for the Bucket Cylinder. To do this, first the current maintenance planand the failure data has to be compiled. RCA is then used to look for the RootCause, which in turn will be used in determining what failures are missing fromthe current maintenance plan. Risk analysis is then used to determine the priorityof those failures. In the end, PMO2000 can give a new maintenance program thataddresses all current problems, while also giving maintenance task to possiblefailures with high risk.] |
S58918-Haswin Atmadi Hardjoprakoso Mangkoesoebroto.pdf :: Unduh
|
No. Panggil : | S58918 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Subjek : | |
Penerbitan : | [Place of publication not identified]: Fakultas Teknik Universitas Indonesia, 2014 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xiii, 63 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |