Identifikasi faktor risiko dalam proses estimate costs pada tahap pelelangan proyek konstruksi yang berpengaruh terhadap akurasi activity cost estimates berbasis PMBOK Guide 5th Edition = Identification of risk factor during estimate costs process for construction project bidding affecting accuracy of activity cost estimates based on PMBOK Guide 5th Edition / Adwina Desiyandri

Wina Geuma Yunita; Yusuf Latief, supervisor; Budi Suanda, examiner; Leni Sagita Riantini, examiner; Setyo Supriyadi Sipadi, examiner ([Publisher not identified] , 2015)

 Abstrak

ABSTRAK
Salah satu penyebab dominan terjadinya cost overrun adalah ketidaktepatan estimasi biaya. Hal tersebut terjadi dikarenakan banyaknya faktor risiko pada proses perhitungan. Maka, tujuan penelitian ini adalah mengidentifikasi risiko tertinggi yang berpengaruh terhadap akurasi Activity Cost Estimates sesuai dengan PMBOKĀ® Guide 5th Edition. Penelitian ini menggunakan data primer dari kuesioner dan dianalisis menggunakan qualitative risk analysis untuk mendapatkan level risiko dari 43 faktor risiko yang berasal dari inputs dan tools and techniques dalam proses Estimate Cost. Dari hasil penelitian diperoleh faktor risiko tertinggi antara lain pada kategori cost management plan: menentukan harga satuan pekerjaan dengan jalan pintas karena keterbatasan waktu; pada kategori human resource management plan: kualitas koordinasi pihak-pihak yang terlibat dalam proses estimasi buruk; pada kategori scope baseline: kesalahan dalam melakukan breakdown pekerjaan (WBS); pada kategori project schedule: kesalahan dalam penentuan durasi kegiatan item pekerjaan; pada kategori enterprise environmental factors: kesalahan desain dari konsultan perencana; pada kategori organizational process assets: pengelolaan database dan informasi yang buruk; serta pada kategori tools and techniques: estimator tidak memiliki pengalaman dalam menangani proyek sejenis yang lebih kompleks. Pada hasil penelitian ini juga diperoleh pembobotan penyebab, tindakan preventif, dampak, dan tindakan korektifnya dari masing-masing faktor risiko tertinggi tersebut.

ABSTRACT
One of the dominant cause of the cost overrun is the in accuracy cost estimates. This happens because there are many risk factors in the calculation process. Thus, the purpose of this study is to identify the highest risk affecting the accuracy of Activity Cost Estimates in accordance with the PMBOKĀ® Guide 5th Edition. This study uses primary data from questionnaires and analyzed using qualitative risk analysis to get the risk level of 43 risk factors derived from the inputs and tools and techniques in the process of Cost Estimate. The result showed the highest risk factor in the category of cost management plan: determine the unit price with a shortcut because of time constraints; category of human resource management plan: quality coordination of the parties involved in a bad estimation process; category of the scope baseline: error in performing the work breakdown (WBS); category of project schedule: error in determining the duration of the action items of work; category of enterprise environmental factors: design fault of the consultant planner; category of organizational process assets: poor management of databases and the information; as well as in the category of tools and techniques: estimator does not have experience in handling more complex similar projects. In the results of this study also obtained the weighting of causes, preventive acts, impact, and corrective acts of each of the highest risk factors.

 File Digital: 1

Shelf
 S60669-Adwina Desiyandri.pdf :: Unduh

 Metadata

No. Panggil : S60669
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Subjek :
Penerbitan : [Place of publication not identified]: [Publisher not identified], 2015
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; Computer (rdadontent)
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xvii, 186 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S60669 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20411531