Full Description
Cataloguing Source | LibUI ind rda |
Content Type | text (rdacontent) |
Media Type | unmediated (rdamedia); computer (rdamedia) |
Carrier Type | volume (rdacarrier); online resource (rdacarrier) |
Physical Description | xv, 189 pages : illustration ; 30 cm + appendix |
Concise Text | |
Holding Institution | Universitas Indonesia |
Location | Perpustakaan UI, Lantai 3 |
- Availability
- Digital Files: 1
- Review
- Cover
- Abstract
Call Number | Barcode Number | Availability |
---|---|---|
S60004 | S60004 | TERSEDIA |
No review available for this collection: 20411926 |
Abstract
Proses Determine Budget pada PMBOK® Guide 5th Edition adalah proses penyusunan anggaran biaya dengan mengagregasi activity cost estimates. Risiko-risiko yang tidak ditangani pada proses tersebut dapat menyebabkan cost baseline yang menyimpang dari biaya actual proyek. Maka, tujuan penelitian ini adalah mengidentifikasi risiko pada proses Determine Budget yang berpengaruh pada akurasi Cost Baseline. Penelitian ini menggunakan data primer dari kuesioner dan dianilisis menggunakan qualitative risk analysis untuk mendapat level risiko dari 43 faktor risiko yang berasal dari inputs dan tools&techniques dalam proses Determine Budget. Dari hasil penelitian, didapatkan 10 faktor risiko tertinggi yang berasal dari 10 kategori.
Determine Budget Process based on PMBOK® Guide 5th Edition is a cost budgeting process by aggregating the Activity Cost Estimate. Unmitigated risks on the process will result in the discrepancy of Cost Baseline from the actual project costs. Therefore, this research will identify all the associated risks on the Determine Budget Process that takes effect to the Cost Baseline accuracy. The study uses primary data from questionnaires and analysed using Qualitative Risk Analysis to generate risk levels from 45 risk factors came from Inputs and Tools & Techniques in Determine Budget Process. From the survey, 10 highest risk factors coming from 10 different categories.
Determine Budget Process based on PMBOK® Guide 5th Edition is a cost budgeting process by aggregating the Activity Cost Estimate. Unmitigated risks on the process will result in the discrepancy of Cost Baseline from the actual project costs. Therefore, this research will identify all the associated risks on the Determine Budget Process that takes effect to the Cost Baseline accuracy. The study uses primary data from questionnaires and analysed using Qualitative Risk Analysis to generate risk levels from 45 risk factors came from Inputs and Tools & Techniques in Determine Budget Process. From the survey, 10 highest risk factors coming from 10 different categories.