:: UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Evaluasi penambahan pintu air manggarai terhadap fungsi kemampuan mengendalikan beban banjir dengan alat bantu WINTR 20 = Evaluation of additional manggarai sluice gate due to its flood control capacity with WINTR 20 / Rusdi Aufar

Rusdi Aufar; R.R. Dwinanti Rika Marthanty, supervisor; Siti Murniningsih, examiner; Toha Saleh, examiner (Fakultas Teknik Universitas Indonesia, 2015)

 Abstrak

ABSTRAK

Pintu Air Manggaai merupakan bagian dari sistem pengendalian banjir pada DAS Ciliwung,

memiliki lokasi pada permulaan saluran Banjir Kanal Barat yang berfungsi mengalihkan
sebagian besar aliran air pada Sungai Ciliwung langsung menuju Laut Jawa. Sebelum tahun
2012, diketahui kapasitas pada Pintu Air Manggarai sebesar 330 m3/s, dan mulai tahun tersebut
Pemerintah Indonesia melakukan penambahan kapasitas Pintu Air Manggarai menjadi 507 m3/s
yang telah selesai pada Januari 2015. Ada tren kenaikan debit banjir akibat perubahan tata guna
lahan berdasarkan beberapa kajian lainnya yang serupa (Nedeco 2011, Mursyid 1997, Luqman
2011, dan perhitungan kontraktor proyek penambahan daun pintu air manggarai PA Manggarai
dan PA Karet) yang menunjukkan bahwa debit rencana pada kondisi eksisting tidak mencukupi.
Karena itu, dilakukan evaluasi penambahan Pintu Air Manggarai terhadap fungsi kemampuan
mengendalikan beban banjir dengan alat bantu WinTR-20. Dari hasil perhitungan, didapatkan
bahwa untuk kala ulang 50 tahunan, curah hujan maksimumnya adalah 228,58 mm. Pada
penelitian ini, dilakukan evaluasi debit dengan WinTR-20 dengan hasil pada hidrograf sebesar
585,54 m3/s, yang menunjukkan bahwa penambahan kapasitas Pintu Air Manggarai yang telah
dilakukan pada 2012-2015 tidak mencukupi. Karena itulah, disarankan pengelolaan sungai dalam
wilayah studi.


ABSTRACT

Manggarai Sluice Gate is a part of flood control system in Ciliwung area, located at the

beginning of Banjir Kanal Barat canal which have function to move alomost all water flow in
Ciliwung River directly to Java Sea. Before 2012, the capacity of Manggarai Sluice Gate known
as 330 m3/s, and start in the same year, Indonesian Government did an increase of Manggarai
Sluice Gate to 507 m3/s, which was ended in January 2015. There is a trend of increasing the
flow rate based on several similar sudies (Nedeco 2011, Mursyid 1997, Luqman 2011, and the
Contractor of this project) which show the existing flood control capacity does not enough.
Because of that reason, we evaluate the additional Manggarai Sluice Gate due to its flood control
capacity with WinTR-20. From the calculation result, we got the maximum daily rainfall for 50-
year return period as 228,58 mm. In this study, we evaluate the flow rate with WinTR-20 and we
got the flow rate on the hydrograph as 585,54 m3/s as the result, which have shown that the
additional Manggarai Sluice Gate done is 2015 is not enough yet. So, we suggested the
management of river in the study area.

 File Digital: 1

Shelf
 S58928-Rusdi Aufar.pdf :: Unduh

 Metadata

No. Panggil : S58928
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : [Place of publication not identified]: Fakultas Teknik Universitas Indonesia, 2015
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xvii, 63 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
S58928 S58928 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20411937