Analisis penerapan manajemen risiko dalam implementasi enterprise resource planning (ERP): studi kasus PT Angkasa Pura II (Persero) = Risk management analysis in enterprise resouce planning (ERP) implementation: case study in PT Angkasa Pura II Persero
Yado Yarismano;
Sandra Chalik, supervisor; Viverita, examiner; Eko Rizkianto, examiner
(Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2015)
|
Penelitian ini bertujuan untuk menganalisis kegagalan pada tahap pertama proyek implementasi sistem ERP di PT Angkasa Pura II (Persero) yang nantinya bisa digunakan sebagai dasar manajemen risiko pada tahap-tahap selanjutnya implementasi ERP di PT Angkasa Pura II (Persero) dan untuk menunjukkan pentingnya manajemen risiko untuk mengurangi prosentase kegagalan implementasi ERP. Analisis yang dilakukan menggunakan metode Fault Tree analysis untuk menghitung estimasi kegagalan implementasi sistem ERP tahap pertama, lalu melakukan identifikasi faktor-faktor risiko yang berpengaruh terhadap implementasi sistem ERP tahap pertama berdasarkan faktor-faktor risiko dari studi literatur, lalu membuat kuesioner untuk menentukan urutan faktor-faktor risiko yang paling berpengaruh tersebut, kemudian dilakukan analisis dari hasil dari survey dan dilakukan estimasi terhadap kegagalan implementasi sistem ERP jika manajemen risiko diterapkan. Penelitian menggambarkan 19 (Sembilan belas) faktor-faktor risiko yang paling berpengaruh terhadap proyek implementasi sistem ERP di PT Angkasa Pura II (Persero) yang apabila tidak dikontrol dengan baik akan menyebabkan kegagalan terhadap proyek. The purpose of this study is to analyze the risk factors on the first phase of ERP system implementation project in PT Angkasa Pura II (Persero) and the result can be used for the next phase of implementation and to show the importance of risk management in the project to reduce the failure percentage of the ERP Implementation. The method used to estimate the failure percentage of the project is the Fault Tree Analysis (FTA) and by analyzing the credentials of the identified risk factors from the existing literature review. Based on the risk factors identified a questionnaire were made to determine the order of the risk factors that have the most significant impact to the ERP system implementation project and the result were analyzed with the FTA to estimate the failure percentage assuming risk management was being used in the first phase. This study finds that by managing and controlling the identified risk, the failure percentage of the project could be reduced. This study also described the 19 (nineteen) risk factor that have a significant impact in the ERP system implementation project in PT Angkasa Pura II (Persero) that if those risks are not controlled well enough it would cause the project to fail. |
T-Yado Yarismano.pdf :: Unduh
|
No. Panggil : | T-Pdf |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2015 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | computer |
Tipe Carrier : | online resource |
Deskripsi Fisik : | xiv, 117 pages : illustration ; 28 cm + appendix |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
T-Pdf | 15-17-108941385 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20415538 |