:: UI - Tesis Membership :: Kembali

UI - Tesis Membership :: Kembali

Critical hard skill competence supervisor pada proyek konstruksi bangunan pantai yang berpengaruh terhadap kinerja waktu = Critical hard skill competence supervisor in coastal engineering project that affect to time pertormance

Siti Asyiah; Leni Sagita Riantini, supervisor; Eddy Subiyanto, supervisor; Ayomi Dita Rarasati, examiner; Alin Veronika, examiner; Setyo Supriyadi Sipadi, examiner (Fakultas Teknik Universitas Indonesia, 2015)

 Abstrak

Supervisor dapat dikatakan sebagai the man in the middle. Supervisor diharapkan mampu menjembatani pihak manajemen dengan tenaga kerja produtif. Pekerjaan supervisor berkaitan erat dengan masalah produktifitas tenaga kerja dan memberikan pengaruh yang signifikan terhadap kesuksesan suatu proyek. Kompetensi yang dibutuhkan tidak hanya soft skill saja tetapi juga hard skill. Pada penelitian ini, hard skill dikelompokkan menjadi 3 kelompok yaitu kompetensi umum, kompetensi inti dan kompetensi khusus.
Berdasarkan hasil analisis korelasi dan regresi diperoleh critical hard skill competence supervisor yang berpengaruh signifikan terhadap kinerja waktu yaitu kompetensi yang termasuk kelompok kompetensi inti yaitu: (1) Menguasai spesifikasi teknis dan spesifikasi khusus (X8) dan (2) melaksanakan pengukuran berdasarkan prosedur pengukuran volume dan perhitungan pembayaran hasil pekerjaan (X40).

Supervisor called as the man in the middle. Supervisors are expected to bridge the management and the productive labor. Supervisor's jobs are strongly associated with labor productivity and have a significant influence for successful project. Competence is not only soft skill competencies, but also hard skills competence.
This research classifies hard skill competence into three groups: general competencies, core competencies and specialized competencies. Correlation and regression analysis result showed critical hard skills competence of supervisors that have a significant effect on the time performance are core competencies: (1) Have a good knowledge to the technical and special specifications (X8) and (2) carry out measurements based on volume measurement and calculation procedure of payment of work (X40).

 File Digital: 1

Shelf
 T43624-Siti Asyiah.pdf :: Unduh

LOGIN required

 Metadata

No. Panggil : T43624
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2015
Program Studi :
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xv, 248 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
No. Panggil No. Barkod Ketersediaan
T43624 15-17-991058714 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20415862